Hidroelektrik türbin-jeneratör sistemlerinde elektriksel parametrelerin enerji verimine etkilerinin analizi ve simülasyonu
Analytical and simulation study on the impact of electrical parameters on energy efficiency in hydroelectric turbine-generator systems
- Tez No: 1026099
- Danışmanlar: PROF. DR. MUSTAFA YAĞCI
- Tez Türü: Yüksek Lisans
- Konular: Elektrik ve Elektronik Mühendisliği, Electrical and Electronics Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2026
- Dil: Türkçe
- Üniversite: Necmettin Erbakan Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Elektrik-Elektronik Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Hidroelektrik santraller, yenilenebilir enerji üretiminde yüksek süreklilik ve hızlı yük değişimlerine cevap verebilme özellikleri nedeniyle önemli bir yere sahiptir. Ancak bu santrallerin düşük verimle işletilmesi, aynı hidrolik potansiyelden daha az elektrik enerjisi elde edilmesine, elektriksel kayıpların artmasına, jeneratör ve transformatör gibi ekipmanların daha fazla yüklenmesine ve uzun vadede işletme maliyetlerinin yükselmesine neden olabilmektedir. Bu nedenle hidroelektrik türbin-jeneratör sistemlerinde verim değerlendirmesinin yalnızca debi, düşü ve aktif güç üretimiyle sınırlandırılmaması; aktif güç, reaktif güç, görünür güç, güç faktörü, gerilim, frekans, uyartım büyüklükleri ve elektriksel kayıplar gibi parametrelerin de birlikte incelenmesi gerekmektedir. Bu tez çalışmasında, hidroelektrik türbin-jeneratör sistemlerinde elektriksel parametrelerin enerji verimi üzerindeki etkilerinin analiz edilmesi ve düşük verimli işletme koşullarından kaynaklanan kayıpların azaltılmasına yönelik optimum çalışma aralıklarının belirlenmesi amaçlanmıştır. Çalışma kapsamında Musatepe HES, Kavşaktepe HES ve Çetintepe HES'e ait gerçek işletme verileri kullanılmış; SCADA ve AVR sistemlerinden elde edilen parametreler MATLAB ortamında oluşturulan simülasyon modeliyle birlikte değerlendirilmiştir. Böylece hidrolik giriş gücü, jeneratör aktif gücü, şebekeye aktarılan güç, reaktif güç, güç faktörü, uyartım sistemi ve transformatör kayıpları aynı analiz çerçevesinde incelenmiştir. Elde edilen sonuçlara göre üç hidroelektrik santralde de maksimum aktif güç üretiminin her zaman maksimum sistem verimine karşılık gelmediği belirlenmiştir. En uygun işletme bölgeleri genel olarak %60–%80 ayar kanadı açıklığı aralığında oluşmuştur. Musatepe HES Ünite 1'de optimum çalışma noktası %75–%80 ayar kanadı açıklığında yaklaşık 948–980 kW jeneratör aktif gücünde gerçekleşmiştir. Musatepe HES Ünite 2'de optimum çalışma noktası %70–%80 ayar kanadı açıklığında yaklaşık 997–1033 kW jeneratör aktif gücünde belirlenmiştir. Musatepe HES'in iki ünitesinin birlikte çalıştığı durumda optimum işletme noktası %65–%75 ayar kanadı açıklığında yaklaşık 1788–1945 kW toplam aktif güç seviyesinde elde edilmiştir. Kavşaktepe HES'te optimum çalışma noktası %60–%70 ayar kanadı açıklığında yaklaşık 1413–1514 kW jeneratör aktif gücünde gerçekleşmiştir. Çetintepe HES'te ise optimum çalışma noktası %60–%70 ayar kanadı açıklığında yaklaşık 722–805 kW jeneratör aktif gücünde belirlenmiştir. Güç faktörünün yüksek değerlerden düşük değerlere çekildiği senaryolarda jeneratör akımında yaklaşık %18–24 aralığında artış oluşmuş; reaktif güç ihtiyacı bazı çalışma noktalarında 500–900 kVAr seviyelerine yükselmiştir. Transformatör kaybının %0'dan %8'e çıkarıldığı senaryolarda sistem verimi Musatepe HES Ünite 1'de %7,216, Kavşaktepe HES'te %7,236 ve Çetintepe HES'te %7,135 azalmış; üç santral için ortalama verim düşüşü yaklaşık %7,20 olarak hesaplanmıştır. Sonuç olarak hidroelektrik sistemlerinde verimli işletme için aktif güç üretimiyle birlikte güç faktörünün 0,99 ve üzerinde tutulması, reaktif güç ve uyartım yüklenmesinin sınırlandırılması, transformatör kayıplarının azaltılması ve elektriksel parametrelerin sürekli izlenmesi gerektiği sonucuna ulaşılmıştır.
Özet (Çeviri)
Hydroelectric power plants have an important role in renewable energy generation due to their high operational continuity and ability to respond rapidly to load variations. However, operating these plants at low efficiency may result in obtaining less electrical energy from the same hydraulic potential, increasing electrical losses, overloading equipment such as generators and transformers, and raising long-term operating costs. Therefore, efficiency assessment in hydroelectric turbine-generator systems should not be limited only to flow rate, head and active power generation; parameters such as active power, reactive power, apparent power, power factor, voltage, frequency, excitation quantities and electrical losses should also be evaluated together. The aim of this thesis is to analyze the effects of electrical parameters on energy efficiency in hydroelectric turbine-generator systems and to determine optimum operating ranges in order to reduce losses caused by low-efficiency operating conditions. Within the scope of the study, real operating data obtained from Musatepe HEPP, Kavşaktepe HEPP and Çetintepe HEPP were used, and the parameters obtained from SCADA and AVR systems were evaluated together with a simulation model developed in MATLAB. Thus, hydraulic input power, generator active power, power transferred to the grid, reactive power, power factor, excitation system and transformer losses were examined within the same analysis framework. According to the results, maximum active power generation did not always correspond to maximum system efficiency in the three hydroelectric power plants. The most suitable operating regions were generally obtained within the 60–80% guide vane opening range. In Musatepe HEPP Unit 1, the optimum operating point was achieved at approximately 948–980 kW generator active power with a 75–80% guide vane opening. In Musatepe HEPP Unit 2, the optimum operating point was determined at approximately 997–1033 kW generator active power with a 70–80% guide vane opening. When both units of Musatepe HEPP operated together, the optimum operating point was obtained at approximately 1788–1945 kW total active power with a 65–75% guide vane opening. In Kavşaktepe HEPP, the optimum operating point was achieved at approximately 1413–1514 kW generator active power with a 60–70% guide vane opening. In Çetintepe HEPP, the optimum operating point was determined at approximately 722–805 kW generator active power with a 60–70% guide vane opening. In the scenarios where the power factor was reduced from high values to lower values, the generator current increased by approximately 18–24%, and the reactive power demand reached 500–900 kVAr at some operating points. In the transformer loss scenarios, increasing the transformer loss from 0% to 8% reduced system efficiency by 7.216% in Musatepe HEPP Unit 1, 7.236% in Kavşaktepe HEPP and 7.135% in Çetintepe HEPP; the average efficiency reduction for the three plants was calculated as approximately 7.20%. As a result, it was concluded that efficient operation of hydroelectric systems requires maintaining the power factor at 0.99 or above together with active power generation, limiting reactive power and excitation loading, reducing transformer losses and continuously monitoring electrical parameters.
Benzer Tezler
- Yanal su alma yapılı dolu gövdeli bağlamalarda ayırma duvarının sürüntü maddesine etkisi
Einfluss der trennwaendezur verhütung der seitlichen wasserentnahmen der fasten wehranglagen
TÜLAY ÖZBEK
- Doğu Anadolu hidroelektrik santrallarında verimlilik ölçülmesi
The measurement productive effiency in the hydroelectric plants of Eastern Anatolian region
SİBKAT KAÇTIOĞLU
- Türkiye'de kamu iktisadi teşebbüsleri gelişimi-hukuki yapısı özelleştirme çalışmaları
Başlık çevirisi yok
MİNE ÖZAYDINLIK
- Çambaşı (Trabzon-Çaykara) barajı ve Uzungöl hidroelektrik santral yerlerinin mühendislik jeolojisi açısından incelenmesi
Başlık çevirisi yok
FİKRİ BULUT