Geri Dön

Çelik imalat süreçlerinde çok kriterli üretim verimliliği analizi ve yapay zekâ destekli süre tahmin modeli

Multi-criteria production efficiency analysis and artificial intelligence supported time prediction model in steel manufacturing processes

  1. Tez No: 1028497
  2. Yazar: SELEN KÖMÜR
  3. Danışmanlar: PROF. DR. GÖKHAN ARSLAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2026
  8. Dil: Türkçe
  9. Üniversite: İstanbul Aydın Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: İnşaat Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Çelik konstrüksiyon sektörü; değişken ham madde girdileri, karmaşık montaj gereksinimleri ve proje bazlı üretim yapısı nedeniyle verimlilik takibinin en zor olduğu endüstri kollarından biridir. Geleneksel yöntemlerle yapılan planlamalarda, üretim süresine etki eden çoklu kriterlerin bütünleşik etkisi göz ardı edilmekte; bu durum yüksek süre sapmalarına yol açmaktadır. Bu çalışmanın amacı; üretim verimliliğini etkileyen faktörleri çok kriterli bir yaklaşımla analiz etmek ve yapay zekâ destekli, yüksek doğruluklu bir süre tahmin modeli geliştirmektir. Araştırma kapsamında, çelik konstrüksiyon sektöründe faaliyet gösteren bir işletmeden temin edilen, atölye imalatı ve saha operasyonlarını kapsayan gerçek üretim verileri kullanılmıştır. Modelleme aşamasında gelişmiş bir görsel veri madenciliği yazılım altyapısından yararlanılarak; Doğrusal Regresyon, Rastgele Orman ve Gradyan Artırma algoritmalarının performansları karşılaştırılmıştır. Analiz sonuçlarına göre; geleneksel yaklaşımları temsil eden Doğrusal Regresyon modeli 0,738 (R2) belirlilik katsayısında kalırken, makine öğrenmesi tabanlı Rastgele Orman algoritması 0,925 (R2) açıklayıcılık oranı ile en başarılı model olmuştur. Geliştirilen bu model, zorlu operasyonel senaryoları içeren vaka analizlerinde %1,23 gibi oldukça düşük bir mutlak hata oranıyla çalışmıştır. Karar ağacı analizinde imalat lokasyonu değişkeninin kök düğüm olarak belirlenmesi, modelin verimlilik tahmininde lokasyon bazlı varyans farklarını temel bir ayırt edici olarak kabul ettiğini kanıtlamıştır. Sonuç olarak geliştirilen modelin, üretim planlama süreçlerinde zaman sapmalarını en aza indiren dinamik bir karar destek aracı olarak kullanılabileceği ortaya konmuştur.

Özet (Çeviri)

The steel construction sector is one of the industrial branches where productivity tracking is most challenging due to variable raw material inputs, complex assembly requirements, and project-based production structures. In planning carried out with traditional methods, the integrated effect of multiple criteria affecting production time is ignored, which leads to high time deviations. The aim of this study is to analyze the factors affecting production productivity with a multi-criteria approach and to develop an artificial intelligence-supported, high-accuracy time prediction model. Within the scope of the research, real production data including workshop fabrication and site operations, obtained from an enterprise operating in the steel construction sector, were used. In the modeling phase, the performances of Linear Regression, Random Forest, and Gradient Boosting algorithms were compared by utilizing an advanced visual data mining software infrastructure. According to the analysis results, while the Linear Regression model representing traditional approaches remained at a coefficient of determination of 0.738 (R2), the machine learning-based Random Forest algorithm became the most successful model with an explanatory rate of 0.925 (R2). This developed model operated with a remarkably low mean absolute percentage error of 1.23% in case studies involving challenging operational scenarios. The determination of the manufacturing location variable as the root node in the decision tree analysis proved that the model accepted location-based variance differences as a fundamental differentiator in productivity estimation. Consequently, it has been demonstrated that the developed model can be used as a dynamic decision support tool that minimizes time deviations in production planning processes.

Benzer Tezler

  1. Çeltik kabuklarının yalıtım malzemesi olarak kullanılması

    Başlık çevirisi yok

    B.CİHAN ÇELEBİ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. İnce taneli sementasyon çeliklerinde sıcak şekil verme ve ısıl işleminin ostenit tane büyüklüğüne etkisi

    Başlık çevirisi yok

    MERAL ŞANLI

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Uludağ Üniversitesi

    Fizik Ana Bilim Dalı

    Yükleniyor...

  3. Mikrobiyoloji laboratuvarlarında kaza nedeni oluşan enfeksiyonlar

    Başlık çevirisi yok

    ŞENAY TÜRE

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Kazaların Çevresel ve Teknik Araştırması Ana Bilim Dalı (disiplinlerarası)

    Yükleniyor...

  4. Çeltikle tuza dayanıklılık test yöntemleri üzerine bir araştırma

    Başlık çevirisi yok

    RAFİ KAPALIOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tarla Bitkileri Ana Bilim Dalı

    Yükleniyor...

  5. Çeltikte farklı tuz konsantrasyonlarında bazı agronomik karakterlerin varyasyonu

    Başlık çevirisi yok

    GÜLNAZ AGAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tarla Bitkileri Ana Bilim Dalı

    Yükleniyor...