Kamu inşaat projelerinde karşılaşılan ihtilaflar için bir bulanık mantık çözüm modeli
A fuzzy logic resolution model for conflicts encountered in public construction projects
- Tez No: 316436
- Danışmanlar: PROF. DR. EKREM MANİSALI
- Tez Türü: Doktora
- Konular: İnşaat Mühendisliği, Civil Engineering
- Anahtar Kelimeler: Bulanık küme teorisi, Bulanık mantık, Bulanık çıkarsama, Kamu inşaatları, Uyuşmazlık, Uzman sistemler, Yazılım geliştirme, Fuzzy Set Theory, Fuzzy logic, Fuzzy inference, Public constructions, Incompatibility, Expert systems, Software development
- Yıl: 2012
- Dil: Türkçe
- Üniversite: İstanbul Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Hızlı büyüyen inşaat endüstrisinde, ihtilafın tarafları arasında anlaşmazlıkların çıkması kaçınılmazdır. Kamu inşaat projelerinde karşılaşılan ihtilaflar çok sayıda karmaşık ve bir birleriyle bağlantılı faktörleri içerir. Bundan dolayı, bir ihtilafın sonucunu ortaya çıkarmak oldukça zordur. Bu tip ihtilafların çözüm aşaması, genellikle çok uzun zaman alır ve mahkeme yoluyla inşaat ihtilaflarının çözümü oldukça maliyetli ve zaman alıcı bir süreçtir. Bu durum projenin teslimi uzatır ve planlanan kamu hizmeti gecikir. Ayrıca projenin kalitesi ve maliyeti kötü bir şekilde etkilenebilir.İhtilaflar, taraflar arasındaki çelişkilerden doğar ve çelişkiler ise anlam belirsizliklerini içerir. Bir anlaşmazlığın çözümüyle ilgili çoğu karar kriterlerinin yanıtı kesin ifadeler değildir; bunlar bulanık ifadeler içerir. Diğer bir ifadeyle, örneğin, bazı karar kriterlerin yanıtları evet ya da hayır olabilirken, bazıların ki çok az, az, kısmen, fazla ya da çok fazla olabilir.Bu çalışmanın amacı, sözleşme taraflarının olası kusur oranlarını hesaplamak ve sebep-sonuç ilişkilerini göstererek tavsiyelerde de bulunmak için bir bulanık mantık çözüm modeli oluşturmaktır. Böylece, idare ve müteahhiti modelin sonucundan ikna olabilmesini sağlanacak, her iki tarafın dostane bir anlaşma yapması mümkün olabilecektir.Bu çalışma dört aşamadan oluşmaktadır. Bunlar;1.Kamu inşaat projeleri için düzenlenmiş mahkeme kararları, kanun ve yönetmelikler incelenmiş, ihtilaflar sınıflandırılmış ve her bir ihtilaf sınıfı için karar kriterleri tespit edilmiştir.2.Kurallar eğer-ise kalıpları kullanılarak meydana getirilmiş ve her bir kuralın ise kısmı için referans kusur oranları hesaplanmıştır.3.İdarenin ve yüklenicinin kusur oranlarını hesaplamak ve tavsiyeler yapmak için bir bulanık mantık çözüm modeli oluşturulmuştur.4.Çözüm aşamasını hızlandırmak ve karışık olan hesaplamayı kolaylaştırmak için bir bilgisayar yazılımı yapılmıştır.Bu çalışma ile idare ve müteahhit, modelin sonucundan ikna olabilecek ve dostane bir anlaşmaya ulaşarak, anlaşmazlıkların mahkemeye taşınmadan hızlı bir şekilde çözülmesine imkan sağlanabilecektir. Sonuç olarak, bu model ile anlaşmazlıktan kaynaklanan mahkeme masrafları ve süre kaybı azalarak, projenin zamanında tamamlanabileceğine ve projenin kalitesinin artacağına inanmaktayız.
Özet (Çeviri)
In the rapid growing construction industry, disagreements between parties are inevitable. Conflicts encountered in public construction works comprise many complicated and interdependent factors, so it is very difficult to predict the result of a conflict. The resolution process of such conflicts usually takes a long time, and resolution of construction disputes through the court system is a highly priced and a time-consuming process. This delays the completion of a construction project, so the planned public services are postponed. Additionally, the project cost and the project quality might be adversely affected.Conflicts break out because of contracting parties? contradictions and contadictions include ambiguity. Many responses of decision criteria are not crispt; they are fuzzy. In other words, for instance, the responses of some ones may be yes or no, whereas the others may be slightly, little, partly, much, or very much.The aim of this study is to develope a fuzzy logic resolution model to calculate contracting parties? possible defective fractions, and to make recommendations by showing cause and effect relations. Thus, both of the client and the contractor will be able to be satisfied by the output of the model and to reach an amicable settlement.This study includes four phases. These are;1.The court decisions, laws, and regulations issued for the public construction works were examined. Conflicts were classified, and decision criteria were determined in accordance with these laws and court decisions.2.The rules were established by using the if-then structures and the reference fraction defectives were calculated for the ?then parts? of each rule.3.A fuzzy logic resolution model was developed to estimate contracting parties? fraction defectives and to make recommendations.4.A computer application was developed to accelerate the resolution process and make the complex calculation easier.We believed that the client and the contractor would be convinced of the result of the model. An amicable settlement might be reach and disagreements could be resolved promptly without going to court. As a result, by reducing the court expenses and loss of time, the planned project might be completed in time and the project quality might be improved.
Benzer Tezler
- Yapı bilgi modellemesinde bulut bilişimin mimarlık ve inşaat sektörlerindeki etkileri
The effects of cloud computing in building information modeling on architecture and construction sectors
VESİLE SÖZEN
Yüksek Lisans
Türkçe
2019
MimarlıkYıldız Teknik ÜniversitesiMimarlık Ana Bilim Dalı
DR. ÖĞR. ÜYESİ TOGAN TONG
- Assessment of urbanization history of Addis Ababa city, Ethiopia
Addıs Ababa cıty, Ethıopıa'nın kentleşme tarihinin değerlendirilmesi
ABDURAHMAN HUSSEN YIMER
Yüksek Lisans
İngilizce
2023
Şehircilik ve Bölge PlanlamaMersin ÜniversitesiŞehir ve Bölge Planlama Ana Bilim Dalı
DOÇ. DR. ALİ CENAP YOLOĞLU
- İnşaat projelerinde gecikmeleri azaltmaya yönelik stratejilerin önceliklendirilmesi için bir karar destek sistemi
A decision-support system for prioritizing strategies to mitigate delays in construction projects
MELİKE NUR ATEŞ
Yüksek Lisans
Türkçe
2025
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. ATİLLA DAMCI
- A large language model (LLM)-based framework for bid/no-bid decision support in construction public procurement: Validated on romanian tenders
İnşaat kamu ihalelerinde teklif verme / vermeme karar desteği için büyük dil modeli (LLM) tabanlı bir çerçeve: Romanya ihaleleri üzerinde doğrulama
ELİF GÜLİN PETEK
Yüksek Lisans
İngilizce
2026
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. ONUR BEHZAT TOKDEMİR
- Kamu-özel sektör işbirliği projeleri: Devlet garantisi konusunda bir sentez çalışması
Başlık çevirisi yok
MUHAMMED YEKCAN MAHMUTOĞLU
Yüksek Lisans
Türkçe
2020
İnşaat Mühendisliğiİstanbul Kültür Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
PROF. DR. FATMA HEYECAN GİRİTLİ