Geri Dön

Gemilerin liman ve deniz tecrübelerinin planlanması

The Planning of dock and sea trials

  1. Tez No: 46434
  2. Yazar: NEVZAT AKTAN
  3. Danışmanlar: PROF.DR. REŞAT BAYKAL
  4. Tez Türü: Yüksek Lisans
  5. Konular: Gemi Mühendisliği, Su Ürünleri, Marine Engineering, Aquatic Products
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 1995
  8. Dil: Türkçe
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 42

Özet

4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps

Özet (Çeviri)

4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI

Benzer Tezler

  1. Bir tanker işletmesinde satınalma süreç modellemesi

    Purchasing process management model in the tanker shipping company

    ENDER YALÇIN

    Doktora

    Türkçe

    Türkçe

    2019

    Denizcilikİstanbul Teknik Üniversitesi

    Deniz Ulaştırma Mühendisliği Ana Bilim Dalı

    PROF. DR. ÖZCAN ARSLAN

  2. Uluslararası gemi ve liman tesisi güvenlik kodu (international ship and port facility security code-ISPS kod: Problemler ve çözüm önerileri

    International ship and port facility security code-ISPS code: Problems and suggestions

    UĞUR YILDIZ

    Yüksek Lisans

    Türkçe

    Türkçe

    2005

    İşletmeİstanbul Üniversitesi

    Deniz İşletmeciliği Ana Bilim Dalı

    DOÇ.DR. GÜLER BİLEN ALKAN

  3. Büyükşehir belediyeleri deniz kirliliği önleme çalışmaları ve öneriler

    Studies carried out by metropolitan municipalities on marine pollution prevention and proposals

    CAZİBE GÖKÇE ALPAY

    Yüksek Lisans

    Türkçe

    Türkçe

    2015

    Çevre Mühendisliğiİstanbul Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    DOÇ. DR. İBRAHİM DEMİR

  4. Denizyolu konteyner taşımacılığında Türk ve yabancı bayraklı gemilerin liman maliyetlerinin incelenmesi

    The study for the port costs of the Turkish and foreign flagged vessels in maritime container transportation

    ONUR KONUKÇU

    Yüksek Lisans

    Türkçe

    Türkçe

    2016

    DenizcilikDokuz Eylül Üniversitesi

    Denizcilik İşletmeleri Yönetimi Ana Bilim Dalı

    DOÇ. DR. YUSUF ZORBA

  5. Limanlarda kuyruk teorisi ve sistem yaklaşımı ile kapasite belirleme modeli

    A Model determining port capacity by using queuing theory and system approach

    SERDAR ALNIPAK

    Yüksek Lisans

    Türkçe

    Türkçe

    2003

    Denizcilikİstanbul Üniversitesi

    Deniz Ulaştırma İşletme Mühendisliği Ana Bilim Dalı

    PROF. DR. SADETTİN ÖZEN