Gemilerin liman ve deniz tecrübelerinin planlanması
The Planning of dock and sea trials
- Tez No: 46434
- Danışmanlar: PROF.DR. REŞAT BAYKAL
- Tez Türü: Yüksek Lisans
- Konular: Gemi Mühendisliği, Su Ürünleri, Marine Engineering, Aquatic Products
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 1995
- Dil: Türkçe
- Üniversite: İstanbul Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 42
Özet
4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps
Özet (Çeviri)
4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI4.9. Lighting Installation 4.10. Navigations Lanterns 4.11. Indicators and Alarms 5. Navigations and Radio Communication Installations Tests, 5.1. Radio Communications 5.2. Telephones 5.3. Electronavaids And Radionavaids 6. Automatics, Control and Monitoring Systems Tests. The subject of sea trials is also a very important element in a newbuilding contract and the shipyard and the owner agrees where and how these trials are conducted. The two may disagree over this point and delivery may be refused. Sea trials are designed to examine the ship as a complete unit. On board areas for scrutiny are broken down into hull, navigational and nautical equipment and machinery and electrical installations. The conditions for starting the sea trials are; a). The dock testing of all machinery, equipment and systems should be completed, b). The ship is allowed to start the voyage when her manoeuvring/signalling equipment in the engine room and on the ship are full working order, c). For the whole time of the sea trials, the following systems should be on; - Fire-fighting central unit, - Air-conditioning system, - Potable and sanitary water system, - sewage treatment plant. d). The proper computer system insulation, electric arrangement insulations should be obtained and presented to the owner, e). Stand-by machinery should be operated in the same way as the main one. The sea trials examined in this work are as follows; 1. Speed Test 2. Determination Of Ship's Inertia Test 3. Manoeuvre Speed Steps4. Determination Of Ship's Radius Of Turning 5. Course Keeping Ability 6. Manoevrability with Ship's Minimum Speed 7. Z Manoeuvre 8. Williamson's Loop 9. Vibration/Noise 10. Steering Gear 11. Anchor Arrangement 12. Mooring Arrangement 13. Life-Saving Appliances 14. Main Engine 15. Waste Heat Boiler 16. Evaporators 17. Electrical Installations 18. Control, Remote Control, Autocontrol System 19. Navigation and Communications Equipment The dock trials are the testing and verifying the arrangement of auxiliary machinery, equipment and systems. The sea trials are the determination of the running condition and the state of the systems together with the whole ship performance. For example, the performance test are applied to main engine in various running conditions at the sea trials. However, the tests of the main engine outfitting, piping system and other equipment are performed in the dock trials. The dock and sea trials ought to completed in the short time between launching and the first voyage. After that, time is the most important component. The dock and sea trials should be programmed and organised according to a schedule plan. XI
Benzer Tezler
- Bir tanker işletmesinde satınalma süreç modellemesi
Purchasing process management model in the tanker shipping company
ENDER YALÇIN
Doktora
Türkçe
2019
Denizcilikİstanbul Teknik ÜniversitesiDeniz Ulaştırma Mühendisliği Ana Bilim Dalı
PROF. DR. ÖZCAN ARSLAN
- Uluslararası gemi ve liman tesisi güvenlik kodu (international ship and port facility security code-ISPS kod: Problemler ve çözüm önerileri
International ship and port facility security code-ISPS code: Problems and suggestions
UĞUR YILDIZ
Yüksek Lisans
Türkçe
2005
İşletmeİstanbul ÜniversitesiDeniz İşletmeciliği Ana Bilim Dalı
DOÇ.DR. GÜLER BİLEN ALKAN
- Büyükşehir belediyeleri deniz kirliliği önleme çalışmaları ve öneriler
Studies carried out by metropolitan municipalities on marine pollution prevention and proposals
CAZİBE GÖKÇE ALPAY
Yüksek Lisans
Türkçe
2015
Çevre Mühendisliğiİstanbul Teknik ÜniversitesiÇevre Mühendisliği Ana Bilim Dalı
DOÇ. DR. İBRAHİM DEMİR
- Denizyolu konteyner taşımacılığında Türk ve yabancı bayraklı gemilerin liman maliyetlerinin incelenmesi
The study for the port costs of the Turkish and foreign flagged vessels in maritime container transportation
ONUR KONUKÇU
Yüksek Lisans
Türkçe
2016
DenizcilikDokuz Eylül ÜniversitesiDenizcilik İşletmeleri Yönetimi Ana Bilim Dalı
DOÇ. DR. YUSUF ZORBA
- Limanlarda kuyruk teorisi ve sistem yaklaşımı ile kapasite belirleme modeli
A Model determining port capacity by using queuing theory and system approach
SERDAR ALNIPAK
Yüksek Lisans
Türkçe
2003
Denizcilikİstanbul ÜniversitesiDeniz Ulaştırma İşletme Mühendisliği Ana Bilim Dalı
PROF. DR. SADETTİN ÖZEN