Geri Dön

Simultaneous lot sizing, scheduling workforce, overtime and shift planning MIP model including setup times and backlogging decisions

Eş zamanlı parti büyüklüğü, çizelgeleme, fazla mesai, vardiya, kurulum zamanı ve geç üretim kararları veren karma tam sayılı programlama modeli

  1. Tez No: 495111
  2. Yazar: CEVDET UTKU ŞAFAK
  3. Danışmanlar: YRD. DOÇ. DR. GÖRKEM YILMAZ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Fazla Mesai ve Vardiya Planlaması, Stok, Geciktirilmiş Üretim, Üretim Kararları, Karma Tam Sayılı Programlama, Sıralama Bağımlı ve Sıralama Bağımsız Kurulum, Eşzamanlı Sıralama ve Parti Büyüklüğü Belirleme, Kalıp Makine Eşleşmesi, Overtime and Shift Planning, Inventory, Backlogging and Production Decisions, Mixed Integer Linear Programming, Sequence Dependent and Independent Setup Time, Continuous Time Scheduling, Operation Planning, Simultaneously Lot Sizing and Scheduling, Tool and Machine Interaction
  7. Yıl: 2018
  8. Dil: İngilizce
  9. Üniversite: Özyeğin Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 128

Özet

Eşzamanlı parti büyüklüğü belirleme ve çizelgeleme modellerinde yapılan güncel çalışmalar işgücü bağımlı kısıtları ve fazla mesai ya da vardiya planları gibi kararların etkilerini göz ardı etmektedir. Üretim planlamadaki genel uygulama, işgücü ve vardiya saygılarının belirlenmesinden sonra sıralama ve parti büyüklüğü belirlenmesi şeklindedir. Bu çalışmada, eşzamanlı sıralama ve parti büküklüklerinin belirlenmesini sağlayan karma tam sayılı programlama modellerinin, paralel ve farklı makine tipleri, makinalarda kullanılan paralel ve birbirinden farklı ekipmanları, sıralama bağımlı/bağımsız kurulum süreleri bulunan üretim birimlerinde, işgücü planlama, vardiya belirleme, fazla mesai kararlarını kapsayacak şekilde genişletilmektedir. Çalışmadaki karma tam sayılı programlama modelleri, literatürde bulunan sıralama bağımlı kurulumu göz önüne alan kapasitelendirilmiş parti büyüklüğü belirleme modelleri kullanılarak geliştirilmiştir. Karşılaştırma yapabilmek amacıyla, geliştirilen modellerin sıralama bağımsız versiyonları da çalışmada sunulmaktadır. Çalışmada endüstriyel boyuttaki problemlerin çözümü için karma tam sayılı programlama tabanlı parçalara ayırma tekniği kullanılmıştır. Geliştirilmiş olan modeller TV üreticisi olan Vestel Elektronik'in plastik enjeksiyon fabrikasının üretim planlamasında denenmiştir. Alınan sonuçlar geliştirilen modellerin ve parçalara ayırma yöntemlerinin büyük problemleri kısa sürede çözebildiği görülmüştür.

Özet (Çeviri)

Studies focusing on simultaneous lot sizing and scheduling problems, discard the effect of workforce constraints and tactical level decisions such as overtime and selected number of shifts. Generally, in production planning, workforce and shift decisions are given first and respect to these decisions, the scheduling and lot sizing decisions are given. This study focuses on the extensions of the simultaneous lot sizing and scheduling MIP models in literature by the overtime, shift decisions and available workforce constraints including production environments of parallel non identical sets of machines using multiple sets of non-identical tools attached and sequence dependent/independent setups between the tools occur. Developed MIP models are based on the Capacitated Lot Sizing Problem with Sequence Dependent Setups (CLSD) models. In addition to the CLSD models sequence independent versions Capacitated Lot Sizing Problem with Sequence Independent Setups (CLSI) are also presented. Later a MIP based decomposition technique will be presented to solve industry size problems. The developed models are tested in a TV manufacturer in Europe, Vestel Electronics's production planning of the plastic injection plant. The results show that the developed heuristics solve the large size problems in a reasonable time.

Benzer Tezler

  1. Mathematical modeling and math heuristic approach for shift selection, lot sizing and worker assignment problem of Vestel

    Başlık çevirisi yok

    HEKİMHAN AKDENİZ

    Yüksek Lisans

    İngilizce

    İngilizce

    2020

    Endüstri ve Endüstri MühendisliğiÖzyeğin Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ İHSAN YANIKOĞLU

    DR. ÖĞR. ÜYESİ MEHMET ÖNAL

  2. Two-stage cutting stock problems and scheduling extensions

    İki-aşamalı stok kesme problemleri ve çizelgeleme uzantıları

    ZEYNEP SEZER

    Doktora

    İngilizce

    İngilizce

    2018

    Endüstri ve Endüstri MühendisliğiBahçeşehir Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. İBRAHİM MUTER

  3. Submitted to the institutefor graduate studies in science and engineering

    Başlık çevirisi yok

    MEHMET ALİ BOZYEL

    Yüksek Lisans

    İngilizce

    İngilizce

    1996

    Endüstri ve Endüstri MühendisliğiMarmara Üniversitesi

    PROF. DR. LİNET ÖZDAMAR

  4. Lot-sizing and scheduling in flow shops

    Akış tipi atölyelerde lotlama ve çizelgeleme

    MURAT GÜNGÖR

    Doktora

    İngilizce

    İngilizce

    2018

    Endüstri ve Endüstri MühendisliğiBoğaziçi Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ALİ TAMER ÜNAL

  5. Takım çalışması esaslı çok-ürünlü demontaj hatlarının tasarımı ve planlanması: Optimizasyon modeli ve çözüm algoritmaları

    Design and planning of multi-manned multi-product disassembly lines: A generi̇c optimization model and solution algorithms

    FATMA BETÜL YENİ

    Doktora

    Türkçe

    Türkçe

    2023

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    PROF. DR. EMRE ÇEVİKCAN