Geri Dön

Metro projelerindeki tünellerde ikinci kaplama betonu olarak donatılı püskürtme beton kullanımının proje maliyetine ve süresine etkilerinin analizi

Effects of reinforced concrete use as a second coating concrete on the project cost and duration of the project

  1. Tez No: 542793
  2. Yazar: İDRİS ARAZ
  3. Danışmanlar: DR. ÖĞR. ÜYESİ MÜCAHİT NAMLI
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2018
  8. Dil: Türkçe
  9. Üniversite: İstanbul Medeniyet Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Mühendislik Yönetimi Ana Bilim Dalı
  12. Bilim Dalı: Mühendislik Yönetimi Bilim Dalı
  13. Sayfa Sayısı: 112

Özet

Tünel yapım yöntemleri dünyada ve ülkemizde tarih boyunca aşamalı olarak değişip gelişme göstermiş ve bu yöntemlerden en fizibıl ve en ekonomik olanı tercih edilmeye çalışılmıştır. Ülkemizde hali hazırda metro tünel projelerinin yapım sürecinde kazı sonrası destek amacıyla püskürtme beton (shotcrete) ve hasır çelik ile geçici kaplama yapıldıktan sonra kalıcı ikinci kaplama olarak çelik donatı ve dökme beton kullanılmaktadır. Bu tez çalışmasında, mühendislik yönetimi bağlamında, donatılı püskürtme beton kullanımının metro projelerine etkisi araştırılacaktır. Bu tez çalışması kapsamında ulaşım alanındaki mega yurtdışı projelerden Etiyopya Hızlı Tren projesi ve mega yurtiçi projelerden Üsküdar - Ümraniye - Çekmeköy Metro Projesi incelenmiştir. Bu projelerdeki tünel kaplama sürelerinin ve maliyetlerinin proje yönetimindeki önemi ve projenin tamamlanmasına etkisi araştırılmıştır. Tünellerde nihai (ikinci) kaplama olarak dökme beton ile donatılı püskürtme beton kullanımının proje süresi ve maliyeti açısından kıyaslaması yapılmıştır. Sonuç olarak klasik dökme beton uygulamasına alternatif bir diğer nihai kaplama yönteminin bitmiş raylı sistem projeleri üzerinden maliyet ve süre analizi yapılarak planlanan metro projelerinin uygulamalarında proje yönetimi açısından etkisi analiz edilmiştir. Analiz sonucunda ise donatılı püskürtme beton ile tünelin nihai kaplaması yapıldığında klasik dökme beton ile yapılan tünel nihai kaplamaya göre süre ve maliyet açısından daha avantajlı olduğu ortaya çıkarılmıştır.

Özet (Çeviri)

Tunnel construction methods have gradually developed and developed throughout the history of the world and our country, and the most feasible and economical ones have been tried to be preferred. In our country, steel reinforcement and cast concrete are used as permanent second coating after spray coating and mesh steel with temporary coating for supporting after excavation in the construction process of subway tunnel projects. In this thesis study, the effect of using reinforced shotcrete on metro projects in the context of engineering management will be investigated. Within the scope of this thesis, mega metro projects such as Üsküdar-Ümraniye-Çekmeköy Metro Project and Ethiopia high-speed railway project will be examined. The impact of the duration and cost of tunnels in these projects on the metro project management and the impact on completion of the project will be investigated. The second coating in the tunnels will be a comparison of the use of cast concrete and shotcrete terms of project duration and cost. It would be advisable to apply the most favorable method in the subway projects as a result of benchmarking and analysis. As a result, the effect of project management will be analyzed in the applications of similar metro projects, which are planned by carrying out time and cost analysis of a second alternative coating technique alternative to classical cast concrete application. As a result of the analysis, when the final coating of the tunnel with reinforced shotcrete was made, it was found that more advantageous than the tunnel made with conventional cast concrete in terms of time and cost compared to the final coating.

Benzer Tezler

  1. Tünel tasarımına etki eden faktörlerin incelenmesi

    Investigation of the factors affecting the design of tunnel structures

    ONUR EFE HEPBOSTANCI

    Yüksek Lisans

    Türkçe

    Türkçe

    2017

    Deprem Mühendisliğiİstanbul Teknik Üniversitesi

    Deprem Mühendisliği ve Afet Yönetimi Ana Bilim Dalı

    PROF. DR. TURGUT ÖZTÜRK

  2. Field and laboratory studies on the performance prediction of raise boring machines

    Başyukarı kuyu açma makinaların performans tahmini için saha ve laboratuvar çalışmaları

    AYDIN SHATERPOUR MAMAGHANI

    Yüksek Lisans

    İngilizce

    İngilizce

    2015

    Maden Mühendisliği ve Madencilikİstanbul Teknik Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    PROF. DR. NUH BİLGİN

  3. Investigation of face stability and surface settlement at earth pressure balance (EPB) tunneling method

    Zemin basıncı dengeleme tünelcilik yönteminde (ZBD) ayna duraylılığı ve yer üstü oturmalarının incelenmesi

    HAMİD CHAKERİ

    Doktora

    İngilizce

    İngilizce

    2012

    Maden Mühendisliği ve MadencilikHacettepe Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    PROF. DR. BAHTİYAR ÜNVER

  4. Balastlı ve balastsız üstyapıların ekonomik yönden karşılaştırılması

    Economic comparison between balasted and ballastless superstructures

    VEYSEL ARLI

    Yüksek Lisans

    Türkçe

    Türkçe

    2002

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. İNAL SEÇKİN

  5. Metro projelerinin yapım ve maliyet açısından karşılaştırılması: İstanbul ve Kocaeli örneği

    The comparison of subway projects in terms of construction and cost: Example of istanbul and Kocaeli

    MESUT KIRS

    Yüksek Lisans

    Türkçe

    Türkçe

    2021

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    Raylı Sistemler Mühendisliği Ana Bilim Dalı

    DOÇ. DR. MURAT ERGÜN