Geri Dön

A multistage scenario optimization procedure for capacity planning in TV production final assembly lines

Başlık çevirisi mevcut değil.

  1. Tez No: 644893
  2. Yazar: ALPASLAN GARİP
  3. Danışmanlar: DR. ÖĞR. ÜYESİ GÖRKEM YILMAZ, DR. ÖĞR. ÜYESİ İHSAN YANIKOĞLU
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Parti büyüklüğü, Personel atama, Üretim planlaması, Lot sizing, Personnel assignment, Production planning
  7. Yıl: 2020
  8. Dil: İngilizce
  9. Üniversite: Özyeğin Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Vestel Elektronik, Avrupa pazarında önemli bir payı olan büyük ölçekli bir televizyon üreticisidir. Vestel High End Fabrikasında bulunan 14 adet son montaj hattı üzerinde 20 farklı boyutta televizyon modeli üretilmektedir. Şirket aylık olarak ortalama 1000 sipariş için bir milyondan fazla ürün üretmektedir. Vestel müşteri siparişleri kesinleşmeden önce 3 aylık üretim planını yapmayı amaçlar. Talebin miktarının bilinmemesinden dolayı üretim planı zor bir hâle gelmektedir. Bu belirsiz üretim planlama probleminin üstesinden gelebilmek için bir çok aşamalı çok ürünlü kapasiteli rassal parti büyüklüğü belirleme problemini; çalışma grubu atama, sipariş geciktirme ve stok durumları da göz önünde bulundurularak toplam maliyeti en aza indirmek amacıyla ortaya koyduk. Bu planlama probleminin üstesinden gelebilmek için üç farklı matematiksel model önerdik. Model 1 ve Model 2 benzer aşama yapısına sahiptir. Model 1'de sadece sipariş geciktirme ve stok miktarı kararları senaryo bağımlı yapıda iken Model 2'de hat durumları ve işçi grubu atama kararları senaryo bağımsız yapıdan senaryo bağımlı yapıya çevrilmiştir. Ayrıca sonradan üretim emri girişi seçeneği eklenmiştir. Aşama sayısındaki artışın oluşturması beklenen çözümsüzlük durumu için Model 3 önerilmiştir. Model 3'teki aşama yapısı çok dönemli olarak tasarlanmıştır. Bu değişiklik talep yapısını etkilemesine rağmen Model 3 problemin çözülmesini kolaylaştırmıştır. Böylelikle Model 3 ile problemin çözüm süresinin kısaldığı gözlemlenmiştir.

Özet (Çeviri)

Vestel Electronics is a large-scale TV producer that has an important share in the European television market. High End Factory, where Vestel assembles 20 different TVs in size, consists of 14 final assembly lines. High End Factory averagely produces more than a million products in 1000 orders of a monthly basis. Vestel aims to schedule 3 months' production plan before all the customer orders are not realized. Therefore, production planning becomes even more difficult when the amount of demands is unknown. To overcome this uncertain production planning problem, we demonstrate a multi-stage, multi-item capacitated stochastic lot sizing problem with an objective of minimizing total cost by taking worker group assignment, backlogging and stock into consideration. We propose 3 different mathematical models to overcome the planning problem. Model 1 and Model 2 have a similar stage structure. In Model 1, only backlogging and stock quantity decisions have wait-and-see structure whereas in Model 2, line status and worker group assignment decisions are converted from a here-and-now structure to a wait-and-see structure. In addition, an extra order option has been added. Model 3 has been proposed for the insolubility situation expected to occur with the increase in the number of stages. Stages are designed in a multi-period structure in Model 3. Although this change affects the demand structure, Model 3 makes it easier to solve the problem. It is observed that the problem solution time is shortened with Model 3.

Benzer Tezler

  1. A data-driven approach to identifying and selecting temporary disaster debris management sites: The case of Istanbul

    Geçici afet moloz yönetim alanlarının belirlenmesi ve seçimi için veri odaklı bir yaklaşım: İstanbul örneği

    BURAK KABAKLI

    Yüksek Lisans

    İngilizce

    İngilizce

    2025

    İstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Energy efficient base station deployment in ris-assisted next-generation hetnets

    Rıs-destekli yeni nesil heterojen ağlarda enerji verimli baz istasyonu yerleşimi

    MİNE ARDANUÇ

    Doktora

    İngilizce

    İngilizce

    2026

    İstanbul Teknik Üniversitesi

    Bilişim Uygulamaları Ana Bilim Dalı

    Yükleniyor...

  3. Sıcak metal şekillendirmede proses kaynaklı kusurların proses performansına etkisinin deneysel ve sayısal olarak incelenmesi

    Experimental and numerical investigation of the effect of process-induced defects on process performance in hot metal forming

    ALİ CEM GÖÇER

    Yüksek Lisans

    Türkçe

    Türkçe

    2025

    İstanbul Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. Optimization of surgery delivery systems

    Başlık çevirisi yok

    SERHAT GÜL

    Doktora

    İngilizce

    İngilizce

    2010

    Arızona State Unıversıty

    Yükleniyor...

  5. Optimization of surgery delivery systems

    Ameliyat uygulama sistemlerinin optimizasyonu

    SERHAT GÜL

    Doktora

    İngilizce

    İngilizce

    2010

    Arızona State Unıversıty

    Endüstri Mühendisliği Ana Bilim Dalı

    Yükleniyor...