Geri Dön

The link between time management and the failure of the governmentIS projects: A Case Study of the NPfIT

Başlık çevirisi mevcut değil.

  1. Tez No: 723970
  2. Yazar: HANDE BOĞAZLIYAN
  3. Danışmanlar: Belirtilmemiş.
  4. Tez Türü: Yüksek Lisans
  5. Konular: Yönetim Bilişim Sistemleri, Management Information Systems
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2018
  8. Dil: İngilizce
  9. Üniversite: The Unıversıty Of Sheffıeld
  10. Enstitü: Yurtdışı Enstitü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Özet yok.

Özet (Çeviri)

Background: The government Information System (IS) projects involve more obstacles than the private ones. The delay is one of the most important challenges and regarded as criteria for the evaluation of success or failure of a project. However, the studies exploring the reasons of delay and examining the link between the time management and project failure are inadequate in the literature. Aims: The study aims to explore the reasons for the delays and explain the link between time management and the success or failure of a project. To achieve this target National Programme for IT (NPfIT) is analysed and the factors which have moved the project to failure are identified. Methods: The inductive approach was followed to answer the research questions of the study. The secondary data collection method was used to gather the required data. In order to analyse the link, the case study of NPfIT was constructed and the qualitative method was preferred to observe the reasons for the delay. Also, the gathered data were analysed with the thematic analysis. Results: The study revealed that complexity of the project, fast rotation and long-term absence of the project managers, resignation of the suppliers, opponent of end users, an absence of a clear plan from the beginning of the project, and the limitations on the controlling stage of a project are important issues which might have led to delays. The delays do not only influence the length of the project but also can move a project to the failure since the problems naturally reduced the possibility to obtain the desired output in line. Conclusions: Finally, there are various reasons influencing negatively the time management. Besides, the problems may lead the project failures because the failure of the time management is regarded as the failure of the project.

Benzer Tezler

  1. PC ler arasında veri iletişimini sağlayan bir yazılım

    A Software about data communication between PCs

    OSMAN NURİ ÖZPINAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  2. Şirketlerde birleşme ve devir işlemleri

    Başlık çevirisi yok

    YUSUF CEMİL SATOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1994

    Marmara Üniversitesi

    Bankacılık ve Sigortacılık Ana Bilim Dalı

    Yükleniyor...

  3. FDDI ve FDDI şebekeleri performans analizi

    Başlık çevirisi yok

    HİLMİ ŞENER

    Yüksek Lisans

    Türkçe

    Türkçe

    1995

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  4. Teknoloji yönetimi

    Technology and strategy

    DEVRİM YÜCEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1995

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  5. Bağ dağıtılmış dosya sistemi

    Başlık çevirisi yok

    GÜRHAN MENDERES

    Yüksek Lisans

    Türkçe

    Türkçe

    1996

    İstanbul Teknik Üniversitesi

    Yükleniyor...