Geri Dön

Montaj hattı dengeleme performans göstergelerine dayalı bulanık AHP ve bulanık TOPSIS tabanlı montaj hattı modeli seçimi: Otomotiv sektöründe bir uygulama

Selection of an assembly line model based on assembly line balancing performance indicators using fuzzy AHP and fuzzy TOPSIS : A case study in the automotive industry

  1. Tez No: 1032897
  2. Yazar: NAZLICAN ÖNDER YILMAZ
  3. Danışmanlar: DOÇ. DR. HAMİD YILMAZ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Montaj hattı dengeleme, LINGO 21.0, Bulanık AHP, Bulanık TOPSIS, Çok kriterli karar verme, Otomotiv sektörü, Endüstri mühendisliği, Assembly line balancing, LINGO 21.0, Fuzzy AHP, Fuzzy TOPSIS, Multi-criteria decision-making, Automotive ındustry, Industrial engineering
  7. Yıl: 2026
  8. Dil: Türkçe
  9. Üniversite: Bursa Teknik Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Endüstri Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bu çalışmada, hat tipi üretim sistemine yeni geçen bir otomotiv işletmesindeki montaj hattının dengelenmesi ve alternatif hat konfigürasyonlarının çok kriterli bir karar verme yaklaşımıyla değerlendirilmesi amaçlanmıştır. Bu doğrultuda, üretim hattının mevcut yapısını iyileştirmeye ve karar vericilere sistematik bir değerlendirme imkânı sunmaya yönelik bütünleşik bir karar destek modeli geliştirilmiştir. Çalışmanın ilk aşamasında montaj hattında gerçekleştirilen iş elemanları ayrıntılı biçimde tanımlanmış, iş elemanları arasındaki öncelik ilişkileri belirlenmiş ve zaman etütleri sonucunda standart işlem süreleri hesaplanmıştır. Elde edilen veriler kullanılarak montaj hattı dengeleme problemi matematiksel programlama tabanlı bir yazılım aracılığıyla modellenmiştir. Model, farklı istasyon sayılarına sahip alternatif hat senaryoları için ayrı ayrı çözülmüş; her bir senaryoya ilişkin optimal iş–istasyon atamaları, çevrim süreleri ve istasyon yükleri belirlenmiştir. Ayrıca alternatiflerin karşılaştırılabilmesi amacıyla hat verimliliği, düzgünlük indeksi, çevrim süresi, istasyon sayısı, boş zaman ve iş yükü dağılımı gibi performans göstergeleri hesaplanmıştır. Çalışmanın ikinci aşamasında, matematiksel model sonucunda elde edilen alternatif hat konfigürasyonları bulanık çok kriterli karar verme yaklaşımı kullanılarak değerlendirilmiştir. Öncelikle değerlendirme kriterlerinin önem ağırlıkları, alanında deneyimli uzmanların görüşleri doğrultusunda Bulanık Analitik Hiyerarşi Prosesi (Bulanık AHP) yöntemiyle belirlenmiştir. Uzman değerlendirmelerinde yer alan belirsizlik ve sözel yargılar, üçgensel bulanık sayılar yardımıyla sayısallaştırılmıştır. Daha sonra alternatif hat konfigürasyonları, Bulanık İdeal Çözüme Benzerliğe Göre Tercih Sıralama Tekniği (Bulanık TOPSIS) kullanılarak pozitif ideal ve negatif ideal çözümlere olan yakınlıklarına göre sıralanmıştır. Böylece alternatifler yalnızca sayısal performans değerlerine göre değil, karar vericilerin öncelikleri ve uzman görüşleri de dikkate alınarak bütüncül biçimde incelenmiştir. Analiz sonuçları, oluşturulan alternatifler arasında belirli bir hat kurgusunun iş yükü dengesi, hat verimliliği, çevrim süresi ve genel performans açısından daha uygun olduğunu göstermiştir. Çalışma sonucunda önerilen bütünleşik yaklaşımın, özellikle hat tipi üretime yeni geçen işletmelerde alternatif üretim hattı tasarımlarının karşılaştırılması, kaynakların daha etkin kullanılması, darboğazların azaltılması ve uygulanabilir kararların geliştirilmesi açısından yararlı olduğu değerlendirilmiştir. Elde edilen bulgular, optimizasyon teknikleri ile bulanık çok kriterli karar verme yöntemlerinin birlikte kullanılmasının montaj hattı tasarımında etkin, esnek ve karar vericileri destekleyen sonuçlar ürettiğini ortaya koymaktadır. Bu yönüyle çalışma, literatürde çoğunlukla ayrı ele alınan montaj hattı dengeleme ve bulanık karar verme süreçlerini tek bir uygulama çerçevesinde birleştirmekte; işletmenin üretim yapısına özgü veriler üzerinden yönetsel ve teknik açıdan uygulanabilir bir çözüm önerisi sunmaktadır ve gelecekteki iyileştirmelere temel oluşturmaktadır. Önerilen modelin, benzer üretim yapısına sahip işletmelerde farklı ürün, talep ve kaynak koşullarına uyarlanabileceği düşünülmektedir. Bununla birlikte model, üretim yöneticilerinin alternatif senaryoları uygulama öncesinde karşılaştırmasına, olası kapasite kayıplarını görmesine ve iyileştirme alanlarını belirlemesine olanak sağlamaktadır. Gelecek çalışmalarda ergonomi, maliyet ve çalışan becerisi gibi ek kriterler modele başarılı biçimde dâhil edilebilir.

Özet (Çeviri)

This study aims to balance the assembly line of an automotive company that has recently transitioned to a flow-line production system and to evaluate alternative line configurations through a multi-criteria decision-making approach. Accordingly, an integrated decision support model was developed to improve the existing structure of the production line and provide decision-makers with a systematic evaluation framework. In the first stage of the study, the work elements performed on the assembly line were defined in detail, the precedence relationships among the work elements were identified, and standard operation times were calculated based on time studies. Using the data obtained, the assembly line balancing problem was modeled through mathematical programming-based software. The model was solved separately for alternative line scenarios with different numbers of workstations, and the optimal task-to-workstation assignments, cycle times, and workstation loads were determined for each scenario. In addition, performance indicators such as line efficiency, smoothness index, cycle time, number of workstations, idle time, and workload distribution were calculated to enable the comparison of the alternatives. In the second stage of the study, the alternative line configurations obtained from the mathematical model were evaluated using a fuzzy multi-criteria decision-making approach. First, the importance weights of the evaluation criteria were determined using the Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method based on the opinions of experienced experts in the relevant field. The uncertainty and linguistic judgments included in the expert evaluations were quantified using triangular fuzzy numbers. Subsequently, the alternative line configurations were ranked according to their closeness to the positive ideal and negative ideal solutions using the Fuzzy Technique for Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Thus, the alternatives were evaluated holistically by considering not only their numerical performance values but also the priorities of decision-makers and expert opinions. The analysis results demonstrated that a particular line configuration among the alternatives provided a more suitable solution in terms of workload balance, line efficiency, cycle time, and overall performance. The integrated approach proposed in this study was considered beneficial, particularly for companies that have recently transitioned to flow-line production, in terms of comparing alternative production line designs, using resources more effectively, reducing bottlenecks, and developing applicable decisions. The findings reveal that the combined use of optimization techniques and fuzzy multi-criteria decision-making methods produces effective, flexible, and decision-supportive results in assembly line design. In this respect, the study integrates assembly line balancing and fuzzy decision-making processes, which are generally addressed separately in the literature, within a single application framework. It also presents a technically and managerially applicable solution based on data specific to the production structure of the company and provides a basis for future improvement activities. The proposed model is considered adaptable to different product, demand, and resource conditions in companies with similar production structures. Furthermore, the model enables production managers to compare alternative scenarios before implementation, identify potential capacity losses, and determine areas requiring improvement. In future studies, additional criteria such as ergonomics, cost, and employee skills may be successfully incorporated into the model.

Benzer Tezler

  1. Helisel yayların statik karakteristiklerini ölçme ve kontrol etme cihazının tasarımı ve imalatı

    Design and manufacture of a device measuringand controlling the static characteristics of helical springs

    MUAMMER MUSULLUOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Montaj hatlarının dengelenmesi

    Başlık çevirisi yok

    ABBAS NAZARİ MONFARED

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Gazi Üniversitesi

    Yükleniyor...

  3. Hat dengeleme modelleri

    Başlık çevirisi yok

    MEHMET M. ERGÜN

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. Gayri nakdi kredi işlemleri

    Başlık çevirisi yok

    ESİN BAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    İstanbul Üniversitesi

    Uluslararası İşletmecilik Ana Bilim Dalı

    Yükleniyor...

  5. Gelişme sürecinde İran ekonomisi

    Başlık çevirisi yok

    M.HOSSEİN YAHYAİ

    Doktora

    Türkçe

    Türkçe

    1985

    Gazi Üniversitesi

    Yükleniyor...

  6. Radyoda canlı yayından bant yayına geçiş

    Başlık çevirisi yok

    SEDAT CERECİ

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    İstanbul Üniversitesi

    Yükleniyor...