Determination of nitrogen and phosphorus removal of İzmir municipal wastewater treatment plant by batch tests
İzmir kentsel atık su arıtma tesisinin azot ve fosfor gideriminin kesikli testlerle belirlenmesi
- Tez No: 119656
- Danışmanlar: PROF. DR. AYŞEGÜL PALA
- Tez Türü: Yüksek Lisans
- Konular: Çevre Mühendisliği, Environmental Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2002
- Dil: İngilizce
- Üniversite: Dokuz Eylül Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Çevre Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 177
Özet
IV ÖZET Atıksulardan biyolojik karbon, azot ve fosfor giderimi, atıksu arıtma uygulamalarında yeni yapılanan bir metottur. Genel bilgiler ve uygulama deneyimleri son yıllarda artmakla birlikte Nitrifikasyon-Denitrifikasyon-Biyolojik Fosfor Giderimi (NDBFG) hala daha fazla araştırma gerektirmektedir. Bu çalışmada, belediye atıksu arıtma tesisinde biyolojik karbon, azot ve fosfor giderimi kesikli deneyler kullanılarak incelenmiştir. Bu testler anaerobik fosfor salimim, aerobik ve anoksik koşullarda salınan fosforun geri alınımı, nitrifikasyon, denitriflkasyon v bünyesel fosforun salınımı deneylerini içermektedir. Anaerobik fosfor salimim deneylerinde iki farklı substrat kullanılmıştır: asetat ve glikoz. Ortalama fosfor salınım hızı glikoz ilavesinde 0.019mgP/mgVSS.dak ve maksimum anaerobik fosfor salınım hızı asetat ilavesinde 1.63 mgP/mgVSS.dak bulunmuştur.anaerobik fosfor salınımı deneyini takip eden fosfor alınımı deneyleri aerobik ve anoksik koşullarda gerçeüeş^irilmiştir. Ortalama fosfor alınım hızlan sırasıyla 0.0031 mgP/mgVSS.dak ve 0:0046 mgP/mgVSS.dak' dır. Nitrifikasyon deneylerinde ortalama NO3-N oluşum hızı 0.034 mgN/mgVSS.dak olarak hesaplanmıştır. Denitrifikasyon deneylerinde, asetat ilavesinde ortalama NO3-N tüketim hızı 0.026 mgN/mgVSS.dak ve glikoz ilavesinde NQj-N tüketim hızı 0.020 mgN/mgVSS.dak olarak bulunmuştur. Bünyese fosfor salınım deneylerinde ortalama fosfor salınım hızı 0.0025 mgP/mgVSS.dak olarak hesaplanmıştır. NDBFG proseslerinin dizayn edilmesinde önemli yer tutan Y, kj, iw ve Ks kinetik parametrelerinin hesaplanmasında basit kesikli metotlar kullanılmıştır. Monod modeline göre yapılan biyolojik kinetik parametre hesaplarında Y ve kd katsayıları sırasıyla 0.70 mgVSS/mgKOİ ve 0.0022 s“1 bulunmuştur. Spesifik nitrifikasyon hızı fan) ve spesifik denitrifikasyon hızı (qD) sırasıyla 6.87*10”* mg N03-N/mgVSS.s ve SM^O4 mg N03-N/mgVSS.s olarak hesaplanmıştır. Buçalışmada hesaplanan kinetik parametreler arıtma tesislerinin dizayn ve işletilmesinde değerlendirilebilirler.
Özet (Çeviri)
n ABSTRACT Biological carbon, nitrogen and phosphorus removal from wastewater has become an established process in wastewater treatment practice. Despite the broad knowledge and practical experience that has been accumulated in previous years, there are still certain aspects of Nitrification-Denitrification-Biological Enhanced Phosphorus Removal (NDBPR) which require further research. In this study, biological carbon, nitrogen and phosphorous removal in a municipal wastewater treatment plant MWWTP was investigated using batch tests. These tests include : anaerobic phosphorus release, released phosphorus uptake in aerobic and anoxic conditions, nitrification, denitrification and endogenous phosphorus release. Two different substrates; acetate and glucose were used in anaerobic P release tests. Average phosphorus release rate was 0.019 mg P/gVSS.min for glucose addition and maximal anaerobic P release rate was 1.63 mgP/gVSS.min as an average for acetate addition. Following the anaerobic P release test, P uptake tests were conducted for aerobic and anoxic conditions. The average P uptake rates were 0.003 lmgP/g VSS.min and 0.0046 mgP/gVSS.min respectively. In nitrification tests average NO3- N production rate was determined as 0.034 mgN/gVSS.min. In denitrification tests with the addition of acetate, average NO3-N consuming rate was 0.026 mg N/g VSS.min and with the addition of glucose NO3-N consuming rate was 0.020mg N/g VSS.min. In endogenous P release tests average P release rate was determined as 0.0025 mgP/gVSS.min. Simple batch methods were proposed to determine Y, kj, Umax and Kg, which are important for NDBPR process design. In biological kinetic parameter estimation according to Monod model, Y and k* coefficients were found 0.70 mg VSS/mg COD and 0.0022 h“1 respectively. The specific nitrification rate (qn) and the specific denitrification rate (qo) were determined Ö.87*!©”4 mg N03-N/mgVSS/h andm 3. 36*1 0"4 mg N03-N/mgVSS/h. The kinetic parameters determined in this study can be used to improve the design and operation of wastewater treatment plants.
Benzer Tezler
- Determination of quality changes in treated wastewater during percolation through the soil media
Arıtılmış atıksuların toprak ortamından süzülmesi sırasındaki kalite değişimlerinin belirlenmesi
MESUT AK
Doktora
İngilizce
2013
Çevre MühendisliğiDokuz Eylül ÜniversitesiÇevre Mühendisliği Ana Bilim Dalı
YRD. DOÇ. DR. ORHAN GÜNDÜZ
- Klinoptilolit ile evsel atık sulardan gübre etkin maddelerin giderim ve geri kazanım olanağının incelenmesi
An investigation on removal and recovery of plant nutrients from domestic wastewater through ion exchange with clinoptilolite
BÜŞRA SARI
Yüksek Lisans
Türkçe
2010
Çevre Mühendisliğiİstanbul Teknik ÜniversitesiÇevre Mühendisliği Ana Bilim Dalı
PROF. DR. BİLSEN BELER BAYKAL
- Pumis, kireç taşı ve kum karışımının atık sulardaki azot ve fosfor giderim performansının belirlenmesi
Determination of nitrogen and phosphorus removal performance of pumis limestone and sand mixture in wastewater
SEMİH SAMET KESKİN
Yüksek Lisans
Türkçe
2023
ZiraatErciyes ÜniversitesiBiyosistem Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ HASAN ALİ İRİK
- Zeolit ve talaşın atık sulardan azot ve fosfor giderim performansının belirlenmesi
Determination of the nitrogen and phosphorus removal performance of zeolite and sawdust in wastewater
GENAR ATICI
Yüksek Lisans
Türkçe
2023
ZiraatErciyes ÜniversitesiBiyosistem Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ HASAN ALİ İRİK