Geri Dön

Spare parts inventory management with delivery lead times and rationing

Talep tedarik süresi ve kritik seviye politikası ile yedek parça envanter yönetimi

  1. Tez No: 184686
  2. Yazar: YAŞAR LEVENT KOÇAĞA
  3. Danışmanlar: Y.DOÇ.DR. ALPER ŞEN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Inventory models, spare parts planning, multiple demand classes, ra-tioning, demand lead time.iii
  7. Yıl: 2004
  8. Dil: İngilizce
  9. Üniversite: İhsan Doğramacı Bilkent Üniversitesi
  10. Enstitü: Mühendislik ve Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 84

Özet

üOZET˙ ü ˙ ˙˙ ˙TALEP TEDARIK SURESI VE KRITIK SEVIYE˙˙ ˙POLITIKASI ILE YEDEK PARCA ENVANTERşü ˙˙YONETIMIYaşar Levent Koşağas cgEndü stri Mü hendisliği, Yü ksek Lisansu u g uTez Yüneticisi: Yrd. Doş. Dr. Alper Seno c şMayıs, 2004Bu tez calışmasında iki tip talep sınıfının güzlemlendiği yarı-iletken ureten mak-şs o g üinaları imal eden bir firmanın yedek parşa envanter sistemi incelenmiştir. Buc ssistemde müşterilerdeki parşa arızalarından kaynaklanan acil siparişlerin anındaus c skarşılanmalısı zorunluluğu varken, daha az kritik olan ve müşterilerin dü zenlis g us ubakım aktivitelerinden kaynaklanan siparişler, sabit bir talep tedarik sü resi son-s urasında karşılanmaktadır. Bu sistemdeki envanter kontrolü işin müşterilerdekis uc usparşa arızalarından kaynaklanan siparişlerin kritik talep sınıfı olduğu bir kri-c s gtik seviye envanter kontrol politikasının kullanılması onerilmektedir. Her ikiütalep sınıfına ait talebin Poisson tipi rassal değişken olduğu ve zamanındags gkarşılanmayan talebin kaybedilmediği varsayımları altında ve envanter seviyesinins gbirebir sipariş verme ile kontrol edildiği durum işin her iki talep sınıfının serviss g cseviyeleri belirlenmiş ve bu seviyeler yapılan eniyileştirme calışmasında kul-s s şslanılmıştır. Yapılan bu eniyileştirme calışmasının sonucunda kritik seviye kontrols s şspolitikasının kullanılmadığı bir sisteme güre belirgin performans artışları sap-g o stanmıştır. Bu sonuşlar 64 parşanın kullanıldığı bir vaka analizi ile de destek-s c c glenmiştir.sAnahtar süzcükler : Envanter sistemleri, yedek parşa planlaması, coklu talepou c şsınıfları, kritik seviye kontrol politikası, talep tedarik sü resi.uiv

Özet (Çeviri)

ABSTRACTSPARE PARTS INVENTORY MANAGEMENT WITHDELIVERY LEAD TIMES AND RATIONINGYaşar Levent Koşağas cgM.S. in Industrial EngineeringSupervisor: Assist. Prof. Dr. Alper SenşMay, 2004We study the spare parts service system of a major semiconductor equipmentmanufacturer facing two kinds of orders of different criticality. The more criticaldown orders need to be supplied immediately, whereas the less critical mainte-nance orders allow a given demand lead time to be fulfilled. For this system,we propose a policy that rations the maintenance orders. Under a one-for-onereplenishment policy with backordering and for Poisson demand arrivals for bothclasses, we first derive expressions for the service levels of both classes and thenconduct a computational study to illustrate superior system performance com-pared to a system without rationing. We also conduct a case study with 64representative parts and show that significant savings are possible through incor-poration of demand lead times and rationing.

Benzer Tezler

  1. Malzeme ihtiyaç planlaması ve üretim kaynakları planlaması

    Material reouirements planning and manufacturing resource planning

    RASİM CÜNEYT GENÇ

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    İşletmeİstanbul Teknik Üniversitesi

    PROF. DR. AYHAN TOROMAN

  2. Üretim kaynakları planlaması

    Başlık çevirisi yok

    TOLGA EREN

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. MEHMET TANYAŞ

  3. Kurumsal kaynakların planlaması (ERP) ve çağdaş üretim-yönetim sistemleri ile ilişkiler

    Enterprise resources planning (ERP) and relationships among ERP and other computer aided systems and management information system

    BURÇİN ÇARDAK

    Yüksek Lisans

    Türkçe

    Türkçe

    2000

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. ALPASLAN FIĞLALI

    DOÇ.DR. MEHMET TANYAŞ

    DOÇ.DR. SEMRA BİRGÜN BARLA

  4. Tam zamanında üretim sistemi ve imalat kaynak planlaması (MRP II) sistemi ile ilişkileri

    Just-in-time productıon system and its relatıons with MRP II (Material Resource Plannıng)

    BAYBARS ELİÇİN

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. MEHMET TANYAŞ

  5. Tam zamanında üretim sistemi ve bir yan sanayi işletmesinde değerlendirilmesi

    Just in time production system and evaluation of fit

    DİLEK DEMİRDAĞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    Mühendislik Bilimleriİstanbul Teknik Üniversitesi

    İşletme Mühendisliği Ana Bilim Dalı

    PROF. DR. SITKI GÖZLÜ