Geri Dön

İstanbul evsel atıksuları için kimyasal arıtmanın fizibilitesi

Feasibility of chemical treatment for İstanbul domestic wastewater

  1. Tez No: 19421
  2. Yazar: Z.BANU ÖZCAN
  3. Danışmanlar: PROF.DR. DERİN ORHON
  4. Tez Türü: Yüksek Lisans
  5. Konular: Çevre Mühendisliği, Environmental Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 1991
  8. Dil: Türkçe
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 100

Özet

substances removal In Istanbul. Enhanced nutrient removal can be only achived by applying advanced biological treatment systems. However, chemical treatment methods can also provide efficient nutrient removal beside the COD, BOD and SS removal in accordance with the chemical treatment method chosen. In the third chapter, typical data on the individual pollutants found in domestic wastewater are reported and depending on the concentrations of these pollutants, wastewater is classified as strong, medium or weak. The classifications of contaminants In municipal wastewater in terms of the particle size that they appear is also shown according to BaLmat and Munck. In these classifications, the organic contaminants in wastewater are seperated into four size fractions as settleable,supracolloi dal, colloidal and soluble. In the fourth chapter, Yenikapx Pretreatment Plant and the interceptors and the tunnels which transport the sewage to the pretreatment plant are described. The operation of this plant is explained. In the same chapter, characterization of the raw wastewater coming to the pretreatmant plant is made on the 6 samples taken from the effluent of grit chamber. hours compos i t samples collected interval. Also, classifications of particle size distribution is also in this chapter.lt can be seen from the characterization made on these 6 samples that concentrations of the parameters vary in a very wide range. For example, COD value in the sample with the date of 4 th. 1.1991 is 280 mg/lt, whereas this value in the sample with the data of 3th. 11. 1990 is 1430 mg/lt. The reason of this varibllity is that the leather industry wastewaster sometimes contaminates to the plant. The maximum and the minimum concentrations of some parameters from Yeni kapı Pretreatment Plant are shown in Table 1. These samples are 4 with half and hour pollutants in terms of shown for each sample Table 1. Minimum and Maximum Values of Some Parameters of Samples belong to Yeni kapı. Pretreatment Plant xvl

Özet (Çeviri)

SUMMARY FEASIBİLİTY OF CHEMICAL TREATMENT FOR İSTANBUL DOMESTIC WASTEWATER istanbul is öne of the oldest cltles in the world,housing 12 percent of Turkey's population and a great majorita of its industrial actlvities. The migration from Anatolia to istanbul brought rapid population increase together with unhealtg construction. Excess population, unplanned developments of industries caused infrastructure problem in istanbul Metropol i tan Area. Severai studies have been conducted to solve istanbul sewerage problem f ör ma. n y years. Some of these studies conducted ba Wild. Kehr, DAMOC and CAMP - TEKSER are explained in the second chapter. istanbul Metropol i tan Sewerage Project is also explalned İn the same chapter. in this project, settlement areas are divided into eleven seperate sevage collection zones. A complete netvork of sewer and interceptors endlng at 15 different treatment and discharge points are planned. Eight of these involve full biological treatment plants prior to marine discharges, while the remaining seven include only pretreatment consisting of coarse and fine screens and grit removal, then deep marine outfall into lower stream of Bhosphorus. The areas where wastewater are formed, sevage flows,pollution loads, the flow and load fraction of industrial wastewaters and infiltration rates are calculated för each of the drainage areas in istanbul.Tak ing into account these data, the total flow and pollution loads of wastewater för each area in istanbul are given för the gears of 1990 and 2020. The source and quantitity of nutrient and removal methods for phosphorus and nitrogen are given in the.same chapter. Also, importance of nitrogen and phosphorus control for istanbul is pointed out. Excess pollution in Bhosphorus and Bhosphorus/Marmara mixing zone is caused by nutrient loads discharged from lands. Some Studies ' have shovm that phosphorus and nitrogen loads sourced from istanbul are 1.03 and 1.6 respectively times the load soarced from Blacksea vhile TOC load sourced from Blacksea 16 times than the load souerced from istanbul. So, nutrient removal is mora important than the carbonaceus XVsubstances removal In Istanbul. Enhanced nutrient removal can be only achived by applying advanced biological treatment systems. However, chemical treatment methods can also provide efficient nutrient removal beside the COD, BOD and SS removal in accordance with the chemical treatment method chosen. In the third chapter, typical data on the individual pollutants found in domestic wastewater are reported and depending on the concentrations of these pollutants, wastewater is classified as strong, medium or weak. The classifications of contaminants In municipal wastewater in terms of the particle size that they appear is also shown according to BaLmat and Munck. In these classifications, the organic contaminants in wastewater are seperated into four size fractions as settleable,supracolloi dal, colloidal and soluble. In the fourth chapter, Yenikapx Pretreatment Plant and the interceptors and the tunnels which transport the sewage to the pretreatment plant are described. The operation of this plant is explained. In the same chapter, characterization of the raw wastewater coming to the pretreatmant plant is made on the 6 samples taken from the effluent of grit chamber. hours compos i t samples collected interval. Also, classifications of particle size distribution is also in this chapter.lt can be seen from the characterization made on these 6 samples that concentrations of the parameters vary in a very wide range. For example, COD value in the sample with the date of 4 th. 1.1991 is 280 mg/lt, whereas this value in the sample with the data of 3th. 11. 1990 is 1430 mg/lt. The reason of this varibllity is that the leather industry wastewaster sometimes contaminates to the plant. The maximum and the minimum concentrations of some parameters from Yeni kapı Pretreatment Plant are shown in Table 1. These samples are 4 with half and hour pollutants in terms of shown for each sample Table 1. Minimum and Maximum Values of Some Parameters of Samples belong to Yeni kapı. Pretreatment Plant xvlIn this study, the classification of parameters in terms of the particulate size distribution is different from the classification made by Munck. It is shown in Table 2. Table 2. In the fifth chapter, history of the chemical treatment of sewage in England and United States is illustrated. The chemical coagulation is described. Chemical coagulation and chemical used for phosphorus removal are reported in this chapter. During this study alum, ferric chloride, ferrous sulphate, ferric chloride and lime were used to precipitate phosphate in Yenikapi sewage. In the sixth chapter, experimental approaches of the study are described. The equipment required to define the optimum operating conditions for coagulation and Jar test are explained. In the Jar test experiments, coagulant solutions were added to the six beakers and mixed rapidly at 100 rpm for one minute. Then, it was flocculated at 20-25 rpm for 20 minutes and after f locculation, paddles were removed and it was allowed to settle for 30 mi nutes. Instruments and instrumental techniques which are available for measuring the parameters used in this study are pointed out. In the seventh chapter, experimental results are given and evaluated. In experiments, i n which several coagulants were used both the optimum dosage of chemicals and optimum pH were investigated. Firstly, alum was used for chemical coagulation. To determine the optimum pH for coagulation with alum, 100 mg /l and 200 mg /l alum were added into the different samples taken from Yeni kapı sewage and pH was adjusted to 3, 4. 5, 6, 7, 8 in each sample. When 200 mg/1 alum was added, COD and SS were measured in the supernanant. In addition of these parameters TKN and TP were measured in xvil

Benzer Tezler

  1. Evsel atıksuların fiziko-kimyasal arıtılabilirliğinin tam ölçekli bir tesiste araştırılması

    Investigation of phsico-chemical treatability of domestic wastewater in a full scale size

    EYYÜP DEBİK

    Doktora

    Türkçe

    Türkçe

    1999

    Çevre MühendisliğiYıldız Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    DOÇ. DR. AHMET DEMİR

  2. Kimyasal arıtma işlemi görmüş evsel atıksuların membran proseslerle arıtmaya uygunluğunun araştırılması

    Chemically enhanced primary treatment of domestic wastewater and investigation of treatability with membrane processes

    MELİS KONUK

    Yüksek Lisans

    Türkçe

    Türkçe

    2014

    Çevre Mühendisliğiİstanbul Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    DOÇ. DR. NEVİN YAĞCI

  3. Evsel atıksıların doğal ortam sıcaklıklarında havasız çamur yataklı reaktörde arıtımı ve ilave kimyasal arıtma uygulamaları

    Anaerobic treatment of domestic wastewaters in upflow anaerobic sludge bed (UASB) reactor at a temperate conditions and chemical post-treatment applications

    ELİS GÜNEŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    2008

    Çevre Mühendisliğiİstanbul Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ÇİĞDEM YANGIN GÖMEÇ

  4. Integrated membrane filtration enhanced with chemical conditioning and biological treatability of olive mill wastewater

    Zeytin karasuyunun kimyasal şartlandırma destekli entegre membran filtrasyonu sonrasında biyolojik arıtılabilirliğinin araştırılması

    SUDE SALİMİ

    Yüksek Lisans

    İngilizce

    İngilizce

    2015

    Çevre Mühendisliğiİstanbul Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    PROF. DR. SEVAL SÖZEN

  5. Evaluation of wastewater treatment technologies using renewable energy for dispersed settlements: Storm valley Ardesen– Camlihemsin pilot region application

    Dağınık yerleşimler için yenilenebilir enerji kullanan atıksu arıtma teknolojilerinin değerlendirilmesi: Fırtına vadisi Ardesen–Camlıhemsin pilot bölge uygulaması

    ORÇUN LEBLEBİCİ

    Yüksek Lisans

    İngilizce

    İngilizce

    2017

    Çevre Mühendisliğiİstanbul Teknik Üniversitesi

    Çevre Mühendisliği Ana Bilim Dalı

    PROF. DR. ORHAN İNCE