Geri Dön

Marmaray Projesi kapsamında gerçekleştirilen hidrografik ölçmeler

Marmaray Project realized in the hydrographic surveys

  1. Tez No: 243947
  2. Yazar: AHMET ÇELİKKIRAN
  3. Danışmanlar: DOÇ. DR. HALİL ERKAYA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Jeodezi ve Fotogrametri, Geodesy and Photogrammetry
  6. Anahtar Kelimeler: Hidrografik ölçmeler, batimetrik ölçüm, İstanbul Boğazı, akıntı hızı, sonar, ses hızı ölçümü, Hydrographic surveys, bathymetric survey, Bosphorus Strait, current velocity, sonar, sound velocity survey
  7. Yıl: 2009
  8. Dil: Türkçe
  9. Üniversite: Yıldız Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Harita Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 138

Özet

Ülkemizin üç tarafı denizlerle çevrili olup, yaklaşık 900 km²'yi geçen göllere, 7000 km'yi gecen kıyılara, yaklaşık 1200 adet gölet ve baraja sahip bulunmaktadır. Deniz projelerinin arttığı bu dönemde hidrografik ölçmeler değer kazanmıştır. Hidrografi; denizler, nehirler ve diğer sular ile bunları çevreleyen kıyı şeridindeki seyir emniyeti ve kolaylığı için bilinmesi gereken bütün temel unsurları ölçen, inceleyen ve bunları denizcilerin kullanmalarına elverişli bir şekilde yayınlayan bilim dalıdır (BKK, 1973). Ülkemizdeki tersane, tüp geçit inşaatları gibi mühendislik projelerinde aktif olarak hidrografik ölçmeler yapılmaktadır. Bunun dışında akıntı modellemesi, dalga boyu tespiti, deniz kirliliği, atık su deniz deşarjı, doğalgaz ve su boru hatları gibi birçok çalışmada çeşitli ölçümler yapılmaktadır.Ölçüm aletlerinin senkronize bir şekilde kullanılarak hidrografik ölçme yapılması ve sonuçların test edilmesi oldukça zordur. Gerekli hassasiyetin yakalanabilmesi için deniz tabanı, derinliği ve su özellikleri gibi birçok unsur göz önünde bulundurulmalıdır.Bu çalışmada amaçlanan; İstanbul Boğazı Marmaray Projesi çalışma bölgesinde yapılan hidrografik ölçme ham verilerinin ve sonuçlarının hassas bir şekilde elde edilmesidir. Çalışmalar yüksek akıntı hızına sahip ve dip topografyasının çok engebeli olduğu bir bölgede yapılmıştır.Çalışma bölgesinde sonar, akıntı hızı ve batimetri ölçümleri yapılmıştır. Bu ölçmelerde sonuçlara etki eden faktörler belirlenmiş ve hassasiyetleri araştırılmıştır. Tüm ölçüm çalışmalarının öncesinde ve sonrasında yapılan işlemler anlatılmıştır. Kurulum, ölçüm ve değerlendirme aşamalarında önemli adımlar belirlenmiştir. Batimetri ölçümlerine etki eden ses hızı ölçümleri farklı saat ve günlerde yapılarak kendi aralarında ve ölçüme etkisi konusunda karşılaştırılmıştır.Sonuç olarak; İstanbul Boğazı çalışma bölgesinde yapılan hidrografik ölçmelerde ölçüm öncesi ve sonrası yapılan adımlar incelenmiş, istenilen hassasiyetlerin elde edilebilmesi için yapılması gerekenler anlatılmıştır. Çalışma bölgesinde aynı konumda ama farklı saatte yapılan ölçümlerin sonuçlarının değiştiği görülmüştür.

Özet (Çeviri)

Our country has got lakes approximate over than 900 km2 as per area, coasts over than 7000 km as per length, barrages, bonds about 1200 pieces and also is surrounded with seas of its three side. The hydrographic surveys are gained value because of increasing marine projects. Hydrography is a science that surveys and examines all the necessary basic items and issues these basic items practical using by mariners for cruising safety and easiness at the seas, rivers and other water sources together with surrounding these coastlines (BKK, 1973). In our country, within engineering projects such as shipyard, tube constructions etc., hydrographic surveys are performed actively. Other than this, in various studies such as current modeling, wave height computation, sea pollution, waste water sea discharging, natural gas and water pipe lines, various surveys are also carried out.Hydrographic survey application with synchronized using of all related equipments and testing of results are considerably difficult. For necessary accuracy, many components such as sea bed, sea depth and sea water conditions have to be considered.The purpose of this study is accurate obtaining of committed hydrographic survey raw datas and results at the working region of Marmaray Project at Bosphorus Strait. The studies were performed at the region which has got high surface current and rough sea bed topography.At the working region; the sonar, current velocity and bathymetric surveys were performed. In these surveys; factors which effect the results, were determined and their accuracies were seeked. Before and after all related surveys, performed processes were explained. The basic steps were clarified during installation, survey and processing operations. Sound velocity surveys which affect the bathymetric survey results directly, were performed at different times and were compared each other and regarding the effects to the survey.As a result; performed hydrographic surveys at the Bosphorus Strait, the steps was analyzed before and after surveys and for obtaining accuracies, the necessities was explained. At the working region, changing of survey results which were performed at the same position but different hours was appeared.

Benzer Tezler

  1. Yenikapı 16 batığının 3 boyutlu dijital modelleme çalışması

    3D digital modeling of Yenikapı 16 shipwreck

    HİLAL SÜMEYYE GÜLER

    Yüksek Lisans

    Türkçe

    Türkçe

    2022

    Arkeolojiİstanbul Üniversitesi

    Taşınabilir Kültür Varlıklarını Koruma ve Onarım Ana Bilim Dalı

    DOÇ. DR. IŞIL ÖZSAİT-KOCABAŞ

  2. Çok taraflı inşaat projelerinde kalite yönetim sistemi kurulumu önerisi

    Quality management system deployment propose for contracting firms to implement medium/large scale construction projects

    MERT YANAŞIK

    Yüksek Lisans

    Türkçe

    Türkçe

    2015

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DR. FEYZİ HAZNEDAROĞLU

  3. Yenikapi, A Late Antique and Byzantine harbor in Constantinople: A historical, archaeological and architectural study of the newly discovered remains

    Yenikapı, Konstantinopolis?de bir geç Antik Çağ limanı: Yeni buluntular üzerine tarihsel, arkeolojik ve mimari bir calışma

    AYŞE ERCAN

    Yüksek Lisans

    İngilizce

    İngilizce

    2010

    ArkeolojiKoç Üniversitesi

    Arkeoloji ve Sanat Tarihi Ana Bilim Dalı

    DOÇ. DR. ALESSANDRA RİCCİ

  4. Kocaeli tramvay projesi şehir hastanesi uzatma hattının kısmen katenerden kısmen araçüstü enerji depolama sisteminden beslenmesi çözümünün incelenmesi

    Investigation of supply problem solution of the city hospital extension line of Kocaeli tramvay project with partially from catenary or partially from on-board energy storage system

    ENES MALİK AYSEL

    Yüksek Lisans

    Türkçe

    Türkçe

    2021

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Raylı Sistemler Mühendisliği Ana Bilim Dalı

    PROF. DR. ÖZCAN KALENDERLİ

  5. Marmara denizi orta sırtı ve kumburgaz baseninde sığ gaz birikimlerinin sismik analizleri

    Seismic analaysis af shallow gas accumulations on the central ridge and kumburgaz basin in the marmara sea

    SİNEM OĞUZ

    Yüksek Lisans

    Türkçe

    Türkçe

    2012

    Deniz BilimleriDokuz Eylül Üniversitesi

    Deniz Jeolojisi ve Jeofiziği Ana Bilim Dalı

    DOÇ. DR. DERMAN DONDURUR