Geri Dön

Göller bölgesinde inşa edilen orman yollarında yaklaşık maliyet ve hakediş değerlerinin irdelenmesi

The investigation of approximate cost and progress payment for forest roads to be built in lakes region of Turkey

  1. Tez No: 259858
  2. Yazar: MEHMET KARABACAK
  3. Danışmanlar: PROF. DR. HAFIZ HULUSİ ACAR
  4. Tez Türü: Yüksek Lisans
  5. Konular: Ormancılık ve Orman Mühendisliği, Forestry and Forest Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2010
  8. Dil: Türkçe
  9. Üniversite: Karadeniz Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Orman Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 100

Özet

Orman yolları; ormanların ekonomik, ekolojik ve sosyal fonksiyonlarının yerine getirilmesi için kullanılan yüksek maliyetli alt yapı tesisleridir. Yol yapım maliyetini etkileyen en önemli iş kalemi kazı işleri olduğundan; kazı miktarları ve zemin klasları ihale sürecinde isabetli tespit edilmelidir. Uygulamada, orman yolu yapım ihalesi için gerekli olan yaklaşık maliyet cetvelindeki iş miktarları gözlemsel metotlarla tespit edilerek, proje hazırlanmadan 4734 Sayılı Kamu İhale Kanunu kapsamında ihaleye çıkılmaktadır. Teklif cetvelinde belirtilen iş miktarlarına göre müteahhitler tekliflerini sunmaktadır. İşin sonunda teklif cetvelindeki iş miktarlarında değişikliğin olması; yüklenicinin az kazanç yada haksız kazanç elde ettiği yönünde ciddi şüphelerin doğmasına neden olmaktadır.Göller Bölgesinde (Isparta Orman Bölge Müdürlüğü) 2003-2008 yıllarında yapılan 43 adet orman yolunun yaklaşık maliyet, ihale ve ödeme evrakı temin edilerek bu çalışmaya başlanılmıştır. Çalışmamıza ait yolların ihale sürecinde tespit edilen iş miktarları ve maliyeti ile hakediş aşamasında tespit edilen iş miktarları ve maliyeti karşılaştırılmıştır. Bu karşılaştırmalarda tablolar, grafikler ve istatistiksel yöntemler kullanılarak irdeleme yapılmıştır. Yürürlükteki KİK kapsamındaki ihale dosyaları incelenerek mevcut uygulamanın aksayan yönleri tespit edilmiş ve çözüm yolları sunulmuştur.İhale sürecinde tespit edilen maliyet ve kazı miktarları ile ödeme anındaki maliyet ve kazı miktarları arasında farkların olduğu tespit edilmiştir. Yol yapımı ile ilgili olarak teklif cetvellerinde yer alan iş miktarlarını sadece gözlemsel arazi keşifleri ile belirlemenin yeterli olamayacağı belirlenmiştir. İhale sürecinde tespit edilen kazı miktarları ve kazı miktarlarının zemin klaslarına dağılımı ile ödeme esnasında belirlenen kazı miktarları ve kazı miktarlarının zemin klaslarına dağılımı arasında farklılık bulunmuştur.Yol yapımında zemin derinliğine ilişkin strüktürü belirleyecek modern yöntemler kullanılarak daha isabetli sonuçlar elde edilmelidir. Bunun için jeofizik yöntemlerden yararlanılabilir. Orman yolları yapımında proje ve ihalenin başarılı sonuçlanabilmesi için; kazı miktarları ve zemin klaslarına dağılımı isabetli olmalıdır.

Özet (Çeviri)

Forest Roads are high-cost basic facilities allowing economic, ecological and social functions of forests to be fulfilled. Because the most essential work item affecting road construction cost is excavation works, amount of excavation and land classifications have to be most appropriately determined within bidding process. In regard to application, the amount of work given in approximate cost sheet required for bidding for forest road construction is determined by means of observational methods and the bidding is conducted within the scope of Public Procurement Law No:4734 before the project is made. Building contractors submit their bids in accordance with amount of work given in bid sheet. If the amount of work given in bid sheet before seems to be different after completion of work, it leads to serious doubts that contractor acquires light profits or acquires illegally.After the documents including approximate cost, bidding and payment for 43 forest roads built in The Lakes Region of Turkey (Isparta Regional Directorate of Forestry) during the period (2003*2008) were obtained, the project started. The amount and cost of work determined in the bidding process for the roads involved in the research have been compared with those determined in the progress payment process. Within these comparisons, a consideration has been carried out by using tables, graphics and statistical methods. After the bidding files in the scope of Public Procurement Law in force were inspected, faulting components of the current application have been determined and solutions are suggested.It has been detected that the cost and amount of excavation determined in the bidding process differ from those determined in the payment process. It has been found out that it is not sufficient to determine amount of work given in bidding sheets related to road construction only by means of observation-based field reconnaissance. It has been also detected that the amount of excavation and distribution of excavation amount to land classifications determined in the bidding process are different from those determined in the payment process.Projects providing better results as a result of using modern methods which can specify structure of land depth while conducting a road construction shall be designed. For this reason, geophysical methods can be benefited from. In order to conduct effectively biddings for forest road construction, amount of excavation and its distribution to land classifications shall be most appropriately determined.

Benzer Tezler

  1. Low impact development (LID) practices in flood control of urban areas using SWMM (storm water management model)

    Kentsel alanlarda taşkın kontrolündeki düşük etkili gelişme uygulamaları (SWMM kullanarak)

    SAEİD SADEGHINAZHAD

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. ERCAN KAHYA

  2. Yeşilırmak deltasının (Çarşamba Ovası) kumul vejetasyonu: Ekolojisi ve çevresel değerlendirilmesi

    Yeşilırmak Delta (Çarşamba Plain) dune vegetation: Ecology and environmental assessment

    ÖZLEM AKYEL

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    CoğrafyaKarabük Üniversitesi

    Coğrafya Ana Bilim Dalı

    PROF. DR. MÜCAHİT COŞKUN

  3. Mübadil konutları ve kentsel gelişime etkisi: Vize örneği

    Immigrant housings and influence's to urban development: Example of Vize

    HİLAL BİYİK

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    MimarlıkTrakya Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. SENNUR AKANSEL

  4. Standart altı yapılar için malzeme mekanik özelliği dağılımının kırılganlık üzerine etkisi

    Effect of distribution of material mechanical properties on seismic vulnerability for substandard buildings

    BÜŞRANUR KARAKAYA

    Yüksek Lisans

    Türkçe

    Türkçe

    2020

    Deprem Mühendisliğiİstanbul Teknik Üniversitesi

    Deprem Mühendisliği Ana Bilim Dalı

    PROF. DR. ALPER İLKİ

  5. 1851 Londra Uluslararası Sergisi'ne Osmanlı İmparatorluğu'nun katılımı

    Participation of Ottoman Empire to 1851 London International Exhibition

    NİLGÜN ÖZİLHAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2020

    TarihAnkara Üniversitesi

    Tarih Ana Bilim Dalı

    PROF. DR. BEKİR KOÇ