Dağlık arazide inşa edilen orman yollarında yaklaşık maliyet ve hakediş değerlerinin irdelenmesi

The investigation of approximated cost and progress payment values for forest roads to be built in on the mountainously region

  1. Tez No: 275682
  2. Yazar: FATMA DİLEK ERBAŞ
  3. Danışmanlar: PROF. DR. H. HULUSİ ACAR
  4. Tez Türü: Yüksek Lisans
  5. Konular: Ormancılık ve Orman Mühendisliği, Forestry and Forest Engineering
  6. Anahtar Kelimeler: Dağlık arazi, Doğu Karadeniz bölgesi, Hakediş ödemeleri, Orman yolları, Mountain land, Eastern Black Sea region, Progress payments, Forest roads
  7. Yıl: 2010
  8. Dil: Türkçe
  9. Üniversite: Karadeniz Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Orman Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Orman yolları, orman işletmeciliğinin (ormancılık uygulamalarının) gerçekleştirilmesini sağlayan pahalı alt yapı tesisleridir. Ormanlarının çoğu dağlık alanlarda yer alan ülkemizde orman yollarının rasyonel olarak planlanması, modern orman işletmeciliği bakımından büyük önem taşımaktadır. Orman yolları inşasında yol yapım maliyetini en fazla etkileyen aşama kazı işleridir. Orman yol inşaatında kazı maliyeti, zemin sınıflarına ve yapılacak kazı miktarına göre farklılıklar gösterir. Orman yolları inşasından önce zemin sınıflarının tahmini ve kazı miktarının doğru tespit edilmesi maliyet hesaplamalarının doğru yapılması açısından son derece önemlidir. Ülkemizdeki ormancılık uygulamalarında ihale öncesi zemin sınıflarının tespiti kişisel tecrübe ve deneyimlerle gözlemsel olarak yapılmaktadır. Yolların ihale edilmesi ise Kamu İhale Kanununca (KİK) belirlenen teklif birim fiyat usulü ile yapılmaktadır. Bu durum ihale öncesi belirlenen yaklaşık maliyet değerleri ile iş bitimindeki hakediş değerleri arasında büyük farklar oluşmasına neden olmaktadır.Bu çalışmada araştırma alanı olarak; Doğu Karadeniz Bölgesi'ndeki Artvin (36), Trabzon (23) ve Giresun (11) Orman Bölge Müdürlüklerinde 2003-2009 yılları arasında inşa edilen toplam 70 adet orman yolu seçilmiştir. Bu orman yollarına ait ihale öncesi ve sonrası evrakları incelenerek yolların yaklaşık maliyet ve hakediş değerleri karşılaştırılmıştır. Elde edilen verilerin değerlendirilmesinde Excel ve SPSS programlarından yararlanılmıştır. Çalışma sonucunda, özellikle yüksek eğimli alanlarda yaklaşık maliyet ile hakediş değerleri arasında önemli farklar olduğu tespit edilmiştir. Bu durum zemin sınıflarının gözlemsel metotlarla belirlenirken sağlıklı verilerin elde edilememesinden kaynaklanmıştır. Bu yüzden gözlem metodunun yerine jeofizik zemin etüdü yöntemlerinin kullanılması daha uygun olacaktır.

Özet (Çeviri)

Forest roads which provide the realization of forestry applications are expensive infrastructure facilities. The planning of forest roads as a rational has a great importance for modern forest management in Turkey which the majority of its forests in mountainous areas. The stage having the most important affect on the cost of forest road construction is excavation activities. The excavation costs of forest road change as the amount of excavated soil and determination of land categories. Determination of the amount of excavation correctly before the construction of forest roads is vital in terms of cost calculations correctly. Land classes in forestry practices in our country have determined with personal experience. The tender bid of forest roads is perfomed with the unit price procedure determined by the Public Procurement Act (PPA). This condition causes big differences between the estimated cost before tender and payment progress.In this study, 70 forest roads as the research areas were chosen which were built in the 2003-2009 in Artvin (36), Trabzon (23) and Giresun (11) Forest District Office in the Eastern Black Sea Region. Approximate cost and progress of forest roads were compared with examining documents before and after the tender. Excel and SPSS programs were used in the evaluation of the obtained data. In conclusion the differences have been identified between the estimated cost of the roads and the values of progress especially in the more sloping areas. For this reason, geophysical methods can be benefited from. In order to conduct effectively biddings for forest road construction, amount of excavation and its distribution to land classifications shall be most appropriately determined.

Benzer Tezler

  1. Ege bölgesi keçi liflerinin bazı önemli fiziksel, kimyasal özellikleri ve değerlendirme imkanları

    Başlık çevirisi yok

    NİLÜFER ERDEM

    Doktora

    Türkçe

    Türkçe

    1985

    Tekstil ve Tekstil MühendisliğiEge Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    PROF. DR. GÜLSEREN YAZICIOĞLU

  2. Çukur (Kayseri) bölgesi siyenitik kompleksinin petrolojik etüdü

    Başlık çevirisi yok

    ORHAN MEHMET SOLMAZ

    Doktora

    Türkçe

    Türkçe

    1983

    Jeoloji Mühendisliğiİstanbul Teknik Üniversitesi

    PROF. DR. YILMAZ BÜRKÜT

  3. Erzurum ve Erzincan yörelerindeki bazı bitkilerde bulunan eriophyoi dea (acarina:actinedida) akarları üzerinde çalışmalar

    Studies an eriophyoid mites (eriophyoidea:acarina) on some plants in Erzurum and Erzincan regions

    ÖZDEMİR ALAOĞLU

    Doktora

    Türkçe

    Türkçe

    1984

    BotanikAtatürk Üniversitesi

    Bitki Koruma Ana Bilim Dalı