Geri Dön

TBM tunnel excavation induced settlements and correlation with actual site measurements

TDM tüneli kazısı oluşan oturmalar ve gerçekleşen saha okumalarıyla karşılaştırılması

  1. Tez No: 363829
  2. Yazar: KORHAN DEMİR
  3. Danışmanlar: PROF. DR. SELAMET GÜRBÜZ ERÇELEBİ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Boğaz demiryolu tüp tünel geçişi, Bosphorus railway tupe tunnel crossing
  7. Yıl: 2015
  8. Dil: İngilizce
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Marmaray projesi Asya ile Avrupa'yı boğazın 60 m altından batırma tüp ile birbirine bağlayan 76.3 km'lik modern hızlı demiryolu taşımacılık sistemidir. Projenin amacı yolcu kapasitesini iki yönde saatte 150.000 yolcuya çıkarmak, toplam yolculuk süresini 185 dakikadan yaklaşık yarısına azaltmaktır. Marmaray projesinde 1 adet Toprak Basıncı Dengeleme (EPB) ve dört adet Bulamaç tipi Tünel Açma Makinesi (TBM) kullanılmıştır. Tünel açımı nedeniyle kaynaklanan yüzey oturmaları altyapılara, yollara, temellere ve binalara zarar vererek günlük hayatı etkilemektedir. Bu nedenle, hassas oturma analizi yaparak yapısal çevreyi korumak için gerekli önlemleri önceden planlamak gerekmektedir. Tünel kaynaklı oturmayı tahmin etmek mühendislik açısından önemli bir konu olmaktadır. Oturmaya sebep olan bir çok neden varolmakla beraber, iki ana grupta toplamak mümkündür. Bunlardan birincisi zemin suyu kaybı nedeniyle çökmesi, ikincisi ise zemin kaybı nedeniyle olan oturmadır. Literatürde, tünel kaynaklı oturmaların tahmininde üç ana metod kullanılmatadır. Bunlar, ampirik metod, analitik çözümler ve nümerik metodlardır. Bu üç yöntem de yaygın bir şekilde kullanılmaktadır. Şehir tünelciliğinde, özellikle zayıf yapısal çevrede, tahmin edilen oturmanın hassasiyeti önem arz etmektedir. Kompleks ve karışık yapının bulunduğu zeminlerde parametrelerin çeşitliliği oturma analizini karmaşıklaştırmaktadır. Şartların iyi modelize edilmesi ile nümerik hesaplamalarda diğer yöntemlere nazaran daha hassas ve gerçekleşen ile daha uyumlu sonuçlar elde edilmektedir.

Özet (Çeviri)

The Marmaray Project is a modern fast rail-track transportation scheme of 76.3 km connecting the European and Asian sides of the Istanbul City underneath the Bosphorus at a depth of 60 m. The objective of the Project is to establish a transportation capacity for about 150.000 passengers per hour in both directions and to reduce the present total travelling time of 185 minutes by nearly half. In Marmaray project, the tunnels were driven by one Earth Pressure Balance (EPB) and four Slurry Tunnel Boring Machine (TBM) under a shallow cover. The tunelling process induces surface settlements that can cause damage to underground utilities and foundations and buildings and/or disrupt daily life damaging roads and pavements. Because of that reason, the sensetive settlement analysis should be made to take protective and precautionary measure in order to prevent the damages to built environment. Estimation of ground settlement caused by the tunnel excavation is important engineering point. Although there are a large number of sources or causes of settlement, they can be conveniently lumped into two broad categories: those caused by ground water depression and those caused by lost ground. In literature, three methods are exist to estimate the settlements caused by tunnelling, Emprical Method, Analytical Solutions and Numerical Method. Each of these methods are widely used. Precision of the predicted settlements becomes a very crucial issue for urban tunneling in case of a vulnerable built environment. The diversity of the involved parameters particularly under complex and heterogeneous soil matrix may intricate the prediction process. With good modeling of the conditions, the numerical calculations provided much more reliable results compared empiricial methods.

Benzer Tezler

  1. Organizational variables, personal factors and performance: A study among first-league basketball players

    Başlık çevirisi yok

    GÜLER KURBANZADE

    Yüksek Lisans

    İngilizce

    İngilizce

    1988

    İşletmeBoğaziçi Üniversitesi

    YRD. DOÇ. DR. HAYAT E. KABASAKAL

  2. Ege bölgesi bazı teras alanlarında ileri eğimli basamak seki terasların şekil özellikleri üzerinde bir araştırma

    Başlık çevirisi yok

    HALİL BAKİ ÜNAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    ZiraatEge Üniversitesi

    Kültürteknik Ana Bilim Dalı

    DOÇ. DR. ALTAN ŞAHİN

  3. Bazı kompleks (koordinasyon) bileşiklerinin katı hal ısısal bozunma kinetiğinin termogravimetrik analiz yöntemleri ile araştırılması

    Başlık çevirisi yok

    ZEKİ YALÇINKAYA

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    KimyaEge Üniversitesi

    Kimya Ana Bilim Dalı

    PROF. DR. MEHMET YÜREKLİ

  4. İnce hiperelastik plakların asimptotik teorisi

    An asymptotic theory of thin hyperelastic plates

    HÜSNÜ ATA ERBAY

    Doktora

    Türkçe

    Türkçe

    1988

    Matematikİstanbul Teknik Üniversitesi

    PROF.DR. ERDOĞAN ŞUHUBİ