Geri Dön

Orta kapasiteli hidroelektrik santrallerinde fizibiliteye göre verilen enerji üretimi etki faktörlerinin incelenmesi ve analizi

Investigation and analysis of energy production effect faactors given according to feasibility study in the medium capacity hydroelectric power plants

  1. Tez No: 578181
  2. Yazar: BETÜL DEMİR
  3. Danışmanlar: DOÇ. DR. ATILGAN ALTINKÖK
  4. Tez Türü: Yüksek Lisans
  5. Konular: Enerji, Energy
  6. Anahtar Kelimeler: Orta kapasiteli hidroelektrik santral, enerji üretimi, enerji verimliliği, kapasite faktörü, Yumrutepe HES, Medium capacity Hydroelectric power plant, hydropower enegry production, energy efficiency, capacity factor, Yumrutepe HES
  7. Yıl: 2019
  8. Dil: Türkçe
  9. Üniversite: Giresun Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Enerji Sistemleri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 78

Özet

Bu çalışmada, orta kapasiteli hidroelektrik santral sınıfında inceleme yapılmış olup bu santral sınıfında yer alan Yumrutepe HES örneği üzerinde çalışıldı. Bu amaçla, 2018-2019 yılları arasında Yumrutepe hidroelektrik santralinin gerçekleşen enerji üretimi, aylık ortalama aktüel basınç, sıcaklık, nispi nem, yağış miktarı ve türbinlerden geçen debi miktarı gibi parametrelerin bu hidroelektrik santralin üzerindeki üretimine etkileri, verimliliği ve kapasite faktörünün hesaplanması yapıldı. Kullanılan bu parametreler yardımıyla üretilen veriler Yumrutepe hidroelektrik santralin fizibilite raporundaki veriler ile karşılaştırılarak incelendi. Söz konusu parametrelerin oldukça etkili olduğu görülmüş olup ve bu sonuçlara göre en yüksek gerçekleşen enerji üretimi 5932 MWh ile Mart ayında ve en düşük 782 MWh ile Eylül ayında gerçekleşti. Enerji üretiminin verimliliğine bakıldığında 2018 yılı içerisinde en fazla üretimin olduğu Mart ayında değil Aralık ayında olduğu hesaplandı. Bu sonuca göre, HES'te enerji üretiminin fazla olmasının çok verimlilik oluşturmadığı sonucuna varıldı. Artışı ile kWh başına üretim maliyetini düşürdüğü bilinen kapasite faktörünün en yüksek değeri %55 ile Mart ayında aldığı ve en düşük %7 ile Eylül ayında olduğu yapılan hesaplamalar sonucu bulundu. Böylece enerji üretimi ile kapasite faktörü değişiminin doğru orantılı olduğu ispatlandı.

Özet (Çeviri)

In this study, medium capacity hydroelectric power plant class was investigated and Yumrutepe HES case was studied in this power plant class. For this purpose, the effects of parameters, such as energy generation realized of Yumrutepe hydroelectric power plant, monthly average partial pressure, temperature, relative humidity, rainfall and the mass flow rate of water passing through turbines, on the efficiency and capacity factor of the Hydroelectric power plant was calculated between 2018-2019 years. The data produced by these parameters were compared with the data in the feasibility study of the Yumrutepe hydroelectric power plant and investigated. These parameters were found to be very effective, and according to these results the highest real energy production was achieved in March with 5932 MW and the lowest actual energy production was in September with 782 MW. When the efficiency of energy production is analyzed, it is calculated that the most production is in December, not in March in 2018. Thus, it was concluded that high energy production in the hydroelectric power plant generally does not create much efficiency. It was found that the capacity factor, which is known to decrease the production cost per kWh with the increase, has the highest value in March with 55% and the lowest in September with 7%. Thus, it has been proved that energy factor and change of capacity factor is directly proportional.

Benzer Tezler

  1. Elektrik üreticileri perspektifinden uzun dönem elektrik üretimi yatırımlarının planlanmasına yönelik bir karar destek modeli

    A decision support model for long-term investment planning of electricity generation from the perspective of generation companies

    BERNA TEKTAŞ SİVRİKAYA

    Doktora

    Türkçe

    Türkçe

    2016

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    İşletme Mühendisliği Ana Bilim Dalı

    PROF. DR. FERHAN ÇEBİ

  2. Küçük ve orta kapasiteli hidroelektrik santrallerde gün içi ve gün öncesi üretim tahmini için matematiksel modelin oluşturulması

    Establishment of mathemati̇cal models for short-term energy producti̇on forecasti̇ng i̇n hydroelectri̇c power plants

    MUSTAFA İRİŞİK

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    EnerjiDüzce Üniversitesi

    Elektrik-Elektronik Mühendisliği Ana Bilim Dalı

    PROF. DR. ALİ ÖZTÜRK

  3. Yenilenebilir enerji santrallerinde yapay sinir ağları yöntemiyle enerji üretiminin modellenmesi ve planlanması

    Modeling and planning of energy production in renewable energy stations with artificial neural networks

    MUSTAFA ALPER ÖZPINAR

    Doktora

    Türkçe

    Türkçe

    2007

    EnerjiYıldız Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    PROF.DR. DÜRRİYE BİLGE

    PROF.DR. ERALP ÖZİL

  4. Küçük hidroelektrik santrallerde türbin tasarımı

    Design of hyrolic turbins at small hyroelectrical power plants

    AHMET YASİN DEMİRHAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2006

    Makine MühendisliğiYıldız Teknik Üniversitesi

    Makine Ana Bilim Dalı

    DOÇ.DR. ÖZGEN ÜMİT ÇOLAK

  5. Balkusan Dam and HEPP: Investigation of better alternatives to EIEI formulation

    Balkusan Barajı ve Hidroelektrik Santrali: EIEI (Elektrik İşleri Etüt İdaresi) önerisine kıyasla daha iyi alternatiflerin araştırılması

    MEHMET AKIN ÇETİNKAYA

    Yüksek Lisans

    İngilizce

    İngilizce

    2013

    İnşaat MühendisliğiOrta Doğu Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. ELÇİN KENTEL