Şebeke bağlantılı bir fotovoltaik güç üretim santralinin tasarım aşamaları ve güç boyutlandırma faktörünün önemi
Design stages of a grid-connected photovoltaic power plant and the importance of the power sizing factor
- Tez No: 729379
- Danışmanlar: ÖĞR. GÖR. GÖKSU GÖREL
- Tez Türü: Yüksek Lisans
- Konular: Elektrik ve Elektronik Mühendisliği, Electrical and Electronics Engineering
- Anahtar Kelimeler: Boyutlandırma, Fotovoltaik sistemler, Güneş enerjisi sistemleri, Dimensioning, Photovoltaic systems, Solar energy systems
- Yıl: 2022
- Dil: Türkçe
- Üniversite: Çankırı Karatekin Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Elektrik-Elektronik Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Bu tez çalışmasında, fotovoltaik güç üretim santrallerinin kurulum aşamaları ile ilgili bilgiler verilip, evirici güç boyutlandırma faktörünün üretime olan etkisi kurulu olan iki farklı santral üzerinden incelenmiştir. Evirici güç boyutlandırma faktörünün belirlenmesi için benzetim programı üzerinde çalışma yapılıp optimum evirici boyutlandırma faktörü belirlenerek bu faktörün üretime olan etkisi gerçek üretim verileri ile değerlendirilmiştir. Çalışmada öncelikle yenilenebilir enerji kaynakları ve Türkiye'deki durumu hakkında bilgiler verilmiştir. Güneşten enerji üretimi yapan sistemler kısaca açıklanarak fotovoltaik sistemlere ve kurulum aşamalarına ilişkin bilgiler verilmiştir. Yenilenebilir enerji mevzuatına dair kanunlar ve değişiklikler hakkında bilgiler verilmiştir. Evirici güç boyutlandırma faktörü değeri açıklanarak belirlenme sürecine ilişkin bir algoritma oluşturulmuştur. Çalışmada evirici güç boyutlandırma değerinin incelendiği aynı özelliklere sahip iki santralin özelliklerine ilişkin bilgiler verilip, yapılan hesaplamalar ve izlenilen adımlar anlatılmıştır. PV*SOL benzetim programı üzerinde farklı evirici güç boyutlandırma değerlerinde çalışmalar yapılıp bu değerlerin oluşturacağı sistem maliyetleri sunulmuştur. Sistem maliyetine ve enerji üretimine bakılarak yeni güç boyutlandırma faktör değeri belirlenmiştir. Sistemin ilk kurulumu yapıldığında güç boyutlandırma faktör değeri 1,166 iken yapılan benzetim sonucunda 1,40305 olarak belirlenmiştir. Sistem 1'e belirlenen bu değer doğrultusunda %20,33 değerinde güç artışı yapılmıştır. Sistem 1 ve Sistem 2'nin üretim değerleri karşılaştırılıp üretimde %13,83 değerinde artış olduğu gözlemlenmiştir.
Özet (Çeviri)
In this thesis, information about the installation stages of photovoltaic power generation plants is given and the effect of the inverter power sizing factor on production is examined over two different installed power plants. In order to determine the inverter power sizing factor, a study was carried out on the simulation program and the optimum inverter sizing factor was determined, and the effect of this factor on production was evaluated with real production data. In the study, first of all, information about renewable energy sources and their situation in Turkey is given. The systems that produce energy from the sun are briefly explained and the photovoltaic systems and the installation stages are given. Information about the laws and amendments regarding the renewable energy legislation is given. An algorithm for the determination process was created by explaining the inverter power sizing factor value. In the study, information about the characteristics of two power plants with the same characteristics in which the inverter power dimensioning value is examined is given, the calculations made and the steps followed are explained. Studies have been made on the PV*SOL simulation program with different inverter power dimensioning values and the system costs that these values will create are presented. The new power sizing factor value was determined by looking at the system cost and energy production. While the power sizing factor value was 1.166 when the system was first installed, it was determined as 1.40305 as a result of the simulation. In line with this value determined for System 1, a power increase of 20.33% was made. The production values of System 1 and System 2 were compared and it was observed that there was an increase of 13.83% in production.
Benzer Tezler
- Kesikli üretim sistemlerinde simülasyon ile programlama
Başlık çevirisi yok
ERTAN KANDEMİR
Yüksek Lisans
Türkçe
1987
İşletmeİstanbul ÜniversitesiÜretim Yönetimi Ana Bilim Dalı
DOÇ. DR. MEHMET GÜNEŞ GENÇYILMAZ
- HgCl2'ün nükleer kuvadrupol rezonansla incelenmesi
Başlık çevirisi yok
NESLİHAN DELİKTAŞ
Yüksek Lisans
Türkçe
1985
Fizik ve Fizik Mühendisliğiİstanbul ÜniversitesiFizik Ana Bilim Dalı
DOÇ. DR. AYNUR ERGİNSAV
- Alçak basınçlı borulu sulama şebekeleri projelendirme kriterleri
Design criteria the low pressure pipe irrigation network
RECEP KANIT
Yüksek Lisans
Türkçe
1987
İnşaat MühendisliğiGazi ÜniversitesiYapı Eğitimi Ana Bilim Dalı
Y.DOÇ.DR. M. HALUK ÇELİK
- Design of canalet irrigation systems by discrete differential dynamic programming
Başlık çevirisi yok
UFUK ESİN
- Evaluation of two computer aided storm water system design models
Başlık çevirisi yok
MEHMET ALİ ÖZMENEK