Simulation and optimization of scheduling policiesin dynamic stochastic resource-constrainedmulti-project environments

Başlık çevirisi mevcut değil.

  1. Tez No: 767687
  2. Yazar: UGUR SATİC
  3. Danışmanlar: DR. PETER JACKO, DR. CHRİSTOPHER KİRKBRİDE
  4. Tez Türü: Doktora
  5. Konular: İşletme, Business Administration
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: Lancaster University
  10. Enstitü: Yurtdışı Enstitü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 126

Özet

Özet yok.

Özet (Çeviri)

The goal of the Project Management is to organise project schedules to complete projects before their completion dates, specified in their contract. When a project is beyond its completion date, organisations may lose the rewards from project completion as well as their organisational prestige. Project Management involves many uncertain factors such as unknown new project arrival dates and unreliable task duration predictions, which may affect project schedules that lead to delivery overruns. Successful Project Management could be done by considering these uncertainties. In this PhD study, we aim to create a more comprehensive model which considers a system where projects (of multiple types) arrive at random to the resource-constrained environment for which rewards for project delivery are impacted by fees for late project completion and tasks may complete sooner or later than expected task duration. In this thesis, we considered two extensions of the resource-constrained multiproject scheduling problem (RCMPSP) in dynamic environments. RCMPSP requires scheduling tasks of multiple projects simultaneously using a pool of limited renewable resources, and its goal usually is the shortest make-span or the highest profit. The first extension of RCMPSP is the dynamic resource-constrained multi-project scheduling problem. Dynamic in this problem refers that new projects arrive randomly during the ongoing project execution, which disturbs the existing project scheduling plan. The second extension of RCMPSP is the dynamic and stochastic resource-constrained multi-project scheduling problem. Dynamic and stochastic represent that both random new projects arrivals and stochastic task durations. In these problems, we assumed that projects generate rewards at their completion; completions later than a due date cause tardiness costs, and we seek to maximise average profits per unit time or the expected discounted long-run profit. We model these problems as infinite-horizon discrete-time Markov decision processes

Benzer Tezler

  1. Esnek üretim sistemleri için bir etkin üretim denetleme modeli

    An Effective supervisory control model for flexible manufacturing systems

    BAHAR KORKUSUZ

  2. Yatırım fizibiliteleri üzerinde hedef programlamasının uygulanması

    Linear goal programming applications on investment projects

    E.ŞEBNEM SOYDAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. MEHMET TANYAŞ

  3. Dağıtık üretim sistemleri içeren dağıtım şebekelerinde akıllı gerilim kontrol yöntemi geliştirilmesi

    Development of an intelligent voltage control method in distribution networks including distributed generation systems

    MERVE GÜLERYÜZ HALAÇLI

    Doktora

    Türkçe

    Türkçe

    2021

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Elektrik Mühendisliği Ana Bilim Dalı

    PROF. DR. AYŞEN DEMİRÖREN

  4. An algorithm to generate alternative train schedules on single trace railroads

    Tek hatlı demiryollarında alternatif tren tarifeleri üreten bir algoritma

    HİKMET BAYIRTEPE

    Doktora

    İngilizce

    İngilizce

    1995

    İnşaat MühendisliğiOrta Doğu Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF.DR. ÖZDEMİR AKYILMAZ

  5. Deterministic and stochastic models for practical scheduling problems

    Uygulamalı çizelgeleme problemleri için deterministik ve stokastik modeller

    ELVİN ÇOBAN GÖKTÜRK

    Doktora

    İngilizce

    İngilizce

    2012

    Endüstri ve Endüstri MühendisliğiCarnegie Mellon University

    İşletme Yönetimi Ana Bilim Dalı

    PROF. DR. ALAN SCHELLER-WOLF