Geri Dön

Küçük ölçekli yapılar için yapı bilgi modelleme (YBM) tabanlı yapımsüreci (4D) ve maliyeti (5D) tahmini: Bir vaka çalışması

Building information modelling (BİM) based time (4D) and cost (5D)estimation for small scale buildings: A case study

  1. Tez No: 810611
  2. Yazar: FURKAN CANPOLAT
  3. Danışmanlar: DR. ÖĞR. ÜYESİ HASAN POLAT
  4. Tez Türü: Yüksek Lisans
  5. Konular: Mimarlık, Architecture
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2023
  8. Dil: Türkçe
  9. Üniversite: Fırat Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Mimarlık Ana Bilim Dalı
  12. Bilim Dalı: Mimarlık Bilim Dalı
  13. Sayfa Sayısı: 118

Özet

Günümüz mimarlık, mühendislik ve inşaat (AEC) sektörlerinde yapım süreci ve maliyeti optimizasyonu, ulaşılması hedeflenen bir ideali yansıtmaktadır. Güvenilir metraj verilerinin elde edilmesi hedefe ulaşmak için gerekli ilk adımdır. Yapı Bilgi Modelleme (YBM); nesne tabanlı çalışması, öznitelik verilerinin eklenebilmesi vb. özellikleriyle geleneksel yöntemler ve aynı prensiplerle mimari çizim temsilleri oluşturan Bilgisayar Destekli Tasarım (BDT) sistemleri yerine tercih edilmektedir. Ancak YBM yazılımları yapım yönetimine bulunduğu önemli katkılara rağmen; iklim koşulları, konum özellikleri ve yapı türü/büyüklüğü farklılıklarına uyum sağlamakta hâlâ yetersiz kalmaktadır. Ayrıca öznitelik verileriyle tasarım evresinde gerçekleştirilen yapım süreci ve maliyeti tahminleri güçlenmiş olsa da yapım yönetimi tahmincisinin profesyonel müdahalesi kaçınılmazdır. Bu tez çalışmasında, YBM teknolojisinin Türkiye'deki küçük ölçekli yapılar için gerçekleştirilen yapım süreci ve maliyeti tahminlerinin güvenilirliği sınanmaktadır. Örnek olarak seçilen Fertek Evi'nin proje müellifi tarafından BDT sistemleriyle tasarım evresi; proje müteahhidi tarafından geleneksel yöntemlerle süre ve metraj tahminleri tamamlanmıştır. YBM yazılımı olan Autodesk Revit (AR) aracıyla 3D modeli oluşturulan Fertek Evi için başka bir YBM yazılımı olan Autodesk Navisworks (AN) aracıyla süre (4D) ve maliyet (5D) verileri girilerek uygulama evresinin sanal simülasyonu gerçekleştirilmiştir. Gerçek uygulama evresinin takibiyle ulaşılan sonuçlar sanal uygulama evresi ve geleneksel yöntem tahminleriyle karşılaştırılmıştır. YBM yazılımlarında gerçekleştirilen tahminler, geleneksel yöntem tahminleriyle kıyaslandığında %15,34 daha az süre ve %2,5 daha az maliyet sonucuna ulaşılmıştır. Fertek Evi'nin gerçek uygulama evresi sonuçları ile metraj tahminleri kıyaslandığında YBM yazılımlarının %96, geleneksel yöntem tahminlerinin %44 güvenilir sonuç verdiği tespit edilmiştir. Gerçek uygulama evresi sonuçları ile beton metrajı tahminleri karşılaştırıldıklarında YBM yazılımlarının %1,12 daha az, geleneksel yöntemin %6,79 daha fazla olduğu belirlenmiştir.

Özet (Çeviri)

In today's architecture, engineering, and construction (AEC) industry, the optimization of construction process and cost reflects an ideal to be achieved. Reliable quantity takeoff is the first step to achieve this goal. Building Information Modelling (BIM) is preferred over traditional methods and Computer-Aided Design (CAD) systems that create architectural drawing representations with the same principles thanks to its objectbased operation, ability to add attribute data, etc. However, despite its significant contribution to construction management, BIM software is still insufficient to adapt to climate conditions, location characteristics, and building type/size differences. In addition, although the construction process and cost estimations made during the design phase with attribute data have been strengthened, the professional intervention of a construction management estimator is inevitable. In this thesis, the reliability of the construction process and cost estimations for small-scale buildings in Turkey was tested using BIM technology. The design phase of the Fertek House, which was selected as an illustration, was carried out by the project author with CAD systems, and the quantity estimations were completed by the project contractor using traditional methods. For Fertek House, for which a 3D model was created via the Autodesk Revit (AR) tool, which is a BIM software, a virtual simulation of the application phase was performed by entering time (4D) and cost (5D) data via the Autodesk Navisworks (AN) tool, which is another BIM software. The results obtained following the real application phase were compared with the virtual application phase and traditional method estimates. When the estimations performed using BIM software were compared with the traditional method estimations, 15.34% less time and 2.5% less cost were obtained. When the Fertek House's actual application phase results were compared to the amount estimates, it was found that the BIM software's calculations provided 96% reliable results, whereas the estimates from the traditional approach provided 56% reliable results. When the concrete quantity estimates were compared with the results obtained from the application phase, it was determined that BIM software was 1.12% less and the traditional method was 6.79% more.

Benzer Tezler

  1. Türkiye için yapı bilgi modelleri hazırlık göstergesinin ölçülmesi: Mekansal verilerin rolü

    Measuring building information modelling readiness index for Turkey: The role of spatial information

    CEM KUMOVA

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    Jeodezi ve Fotogrametriİstanbul Teknik Üniversitesi

    Geomatik Mühendisliği Ana Bilim Dalı

    PROF. DR. HANDE DEMİREL

  2. Mekânsal dijital ikizlere yönelik yapı modeli üretiminde prosedürel modelleme yönteminin tasarımı ve geliştirilmesi

    Design and development of procedural modeling method in generating structure models for spatial digital twins

    GÜÇLÜ ŞENYURDUSEV

    Doktora

    Türkçe

    Türkçe

    2024

    Bilim ve Teknolojiİstanbul Teknik Üniversitesi

    Geomatik Mühendisliği Ana Bilim Dalı

    DOÇ. DR. AHMET ÖZGÜR DOĞRU

  3. Building information modelling in facilities management

    Tesis yönetiminde yapı bilgi modellemesinin kullanılması

    BEHLÜL KULA

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ESİN ERGEN PEHLEVAN

  4. Assessing the impact of promotions on sales: A quantitative approach for a large-scale retailer's sales performance

    Promosyonların satışlar üzerindeki etkisinin değerlendirilmesi: Büyük ölçekli bir perakendecinin satış performansına ilişkin kantitatif bir yaklaşım

    ÖMER ZEYBEK

    Doktora

    İngilizce

    İngilizce

    2022

    Ekonometriİstanbul Teknik Üniversitesi

    İşletme Ana Bilim Dalı

    PROF. DR. KEMAL BURÇ ÜLENGİN

    PROF. DR. TOLGA KAYA