Geri Dön

Comparison of time slice windows analysis with the delay analysis methods frequently used in the construction industry: A case study

Zaman dilimi pencere analizinin inşaat sektöründe sıkça kullanılan gecikme analizi metodları ile karşılaştırılması: Vaka analizi

  1. Tez No: 869638
  2. Yazar: TOLGAHAN ÖZKAN
  3. Danışmanlar: PROF. DR. MUSTAFA TALAT BİRGÖNÜL, PROF. DR. İREM DİKMEN TOKER
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2024
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

İnşaat projelerinde gecikmelerin yaşanması sıkça karşılaşılan bir olay olup, projenin tamamlanma tarihini etkilemesi nedeniyle yüklenici ve işveren arasında anlaşmazlıklara yol açmakta, bu da süre uzatımına, parasal hak taleplerine veya gecikme cezasına maruz kalınmasına yol açabilmektedir. Bu nedenle gecikmelerin doğru analizi, kritik gecikmelerin nedenlerinin ve sorumlu tarafın belirlenmesi açısından önem taşımaktadır. İnşaat sektöründe süre uzatımı ve parasal hak talepleri veya gecikme cezalarının doğru bir şekilde hesaplanması amacıyla kritik gecikmelerin nedenlerinin belirlenmesi amacıyla gecikme analizi yöntemleri kullanılmaktadır. Ancak bu yöntemlerin her birinin güçlü ve zayıf yönleri vardır. İnşaat Hukuku Derneği'nin (SCL), Great Delay Analysis Debate isimli yayınında sıklıkla kullanılan gecikme analizi yöntemleri kullanılarak bir gecikme senaryosu analiz edilmiştir. Bu tezde aynı gecikme senaryosu, zaman dilimi pencereleri analiz yöntemi kullanılarak analiz edilmiştir. Zaman dilimi pencereleri analizinin sonuçları, diğer gecikme analizi yöntemlerinin (planlanan üzerinden etkilenen, planlanan vs. gerçekleşen, gerçekleşenden çıkarılan ve zaman etkisi analizi) sonuçlarıyla kıyaslanmıştır ve her bir gecikme analizi yönteminin güçlü ve zayıf yönleri belirlenmiştir. Bulgular, zaman dilimi pencereleri analizinin, proje boyunca eşzamanlı gecikmeler, hızlanmalar veya kritik yoldaki değişiklikler gibi diğer yöntemlerle kolayca tespit edilemeyen önemli sorunları tespit edebildiğini göstermektedir. Bu araştırmada aynı zamanda zaman dilimi pencereleri analiz yönteminin yalnızca bir gecikme analizi yöntemi olmadığı, ve bir projenin yürütülmesi sırasında daha iyi bir proje ve sözleşme yönetimi için önemli bir yöntem olduğu sonucuna varılmıştır. Bununla birlikte, zaman dilimi pencere analizinin uygulanması zor ve zaman alıcı olması nedeniyle, güncellenmiş iş programları veya ilerleme verilerinin yanı sıra proje kayıtlarının kapsamlı olarak tutulmasını gerektirmektedir.

Özet (Çeviri)

Delays are inevitable in construction projects, and they mostly result in disputes between contractor and employer because they impact the project completion date, which could lead to extension of time and monetary compensation claims or exposure to liquidated damages. Therefore, proper analysis of delays is crucial to determining the causes of critical delays and the responsible party. Multiple delay analysis methods are used in the construction industry to determine the causes of critical delays in order to calculate the extension of time and monetary compensation or liquidated damages accurately. However, each of these methods has strengths and weaknesses. The Society of Construction Law (SCL) analyzed a delay scenario using commonly used delay analysis methods in the Great Delay Analysis Debate. In this thesis, the same delay scenario was analyzed using the time slice windows analysis method. The results of the time slice windows analysis were compared with the results of other delay analysis methods, namely impacted as-planned, as-planned vs. as-built, collapsed as-built, and time impact analysis. The strengths and weaknesses of each delay analysis method were determined. The findings show that time slice windows analysis can identify important issues that are not easily identified by other methods, such as concurrent delays, accelerations, or changes in critical path throughout the course of the project. This research also concluded that the time slice windows analysis method is not only a delay analysis method, but also a key method for improved project and contract management during the execution of a project. However, time slice window analysis is also difficult and time-consuming to perform, and it requires as-planned and updated programs or physical progress data along with extensive as-built record-keeping.

Benzer Tezler

  1. Cam ve plastik seraların sonbahar domates üretimi yönünden karşılaştırılması

    Başlık çevirisi yok

    ERGUN DURAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Bahçe Bitkileri Ana Bilim Dalı

    Yükleniyor...

  2. Konut bölgelerinde parsel düzeni uygulamasının kent topraklarının rasyonel kullanımı çerçevesinde mimari açıdan değerlendirilmesi

    An Architeet's Criticism of the Currently Practised method of plot formation in residential areas from the point of View of rational utilization of urban deatories

    SUZAN ESİRGEN

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    Yükleniyor...

  3. Bölünüme bağlı olmayan varyans çözümlemesi çoklu karşılaştırmalar ve tarımda uygulamaları

    Distiribution-free analyis of variance multiple comparisons and applications in agriculture

    HAMZA GAMGAM

    Doktora

    Türkçe

    Türkçe

    1985

    Gazi Üniversitesi

    Yükleniyor...

  4. Çeşitli rib örgülerin boyutsal özellikleri üzerine bazı araştırmalar

    Başlık çevirisi yok

    ARZU YAĞCI

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  5. Pamuk ipliklerinde istatiksel bir hata analiz yönteminin geliştirilmesi üzerinde araştırmalar

    Başlık çevirisi yok

    AYŞE KARAKOR

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  6. Türkiye'de üretilen dikiş ipliklerinin incelenmesi ve konfeksiyon endüstrisinde kullanım uygunluklarının araştırılması

    Başlık çevirisi yok

    CUMHUR ÇAKMAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...