Proje gerçekleştirilmesi sürecinde temel amaçların dinamik simülasyon tabanlı optimizasyonu

Dynamic simulation-based optimization of project principle goals through realization

  1. Tez No: 282808
  2. Yazar: YUSUF SAİT TÜRKAN
  3. Danışmanlar: PROF. DR. EKREM MANİSALI
  4. Tez Türü: Doktora
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Proje Planlama ve Çizelgeleme, Kaynak Kısıtlı Proje Çizelgeleme, Kaynak Atama, Kesikli Olay Simülasyonu, Simülasyon Tabanlı Optimizasyon, Benzetim, Proje kontrol, Proje yönetimi, Sezgisel yöntemler, Çizelgeleme, Project Planning and Scheduling, Resource Constraint Project Scheduling, Resource Allocation, Discrete Event Simulation, Simulation Based Optimization, Simulation, Project control, Project management, Heuristic methods, Scheduling
  7. Yıl: 2008
  8. Dil: Türkçe
  9. Üniversite: İstanbul Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Proje planlama ve çizelgeleme, proje yönetimi içerisindeki en karmaşık konulardan biridir. Projelerin, kaynak kısıtları ve proje elemanlarının stokastik yapıları dikkate alınarak modellenmesi oldukça zordur. Geleneksel proje yönetimi metotları, projenin gerçeğe yakın modellenmesi konusunda yetersiz kalırken, matematiksel ve sezgisel çizelgeleme metotları pek çok varsayım yardımıyla problemi tanımlayabilmektedir. Fazla varsayım kullanılması modellemeyi kolaylaştırmakta fakat problemi sahte bir problem haline getirmektedir.Proje çizelgelemede, problemin gerçeğe uygun modellenmesinin yanında, en iyi ya da en iyiye yakın çözümlerin elde edilebilmesi de diğer bir önemli problemdir. Diğer taraftan proje çizelgeleme problemlerinin birçoğunun, çok sayıda alternatif çözüme sahip olması, bu problemleri çözümü çok zor (NP-hard) problemler yapmıştır. Matematiksel çizelgeleme metotları birçok proje çizelgeleme probleminde uygun bir çözüm elde edemezken, sezgisel yöntemler daha çok özel problemlerde çözüm üretebilmekte, gerçek proje çizelgeleme problemlerinde etkili olamamaktadır.Bu çalışmada proje planlama ve çizelgeleme konusunda simülasyon tabanlı bir model önerilmiştir. Modelimizde, projelerdeki kaynak kısıtlarının yanında, belirsiz faaliyet süreleri ile değişken kaynak bulunabilirlikleri de problemde tanımlanabilmektedir. Simülasyon modeli içerisine yerleştirilen sezgisel algoritma yardımıyla, farklı proje çizelgeleme problemleri için en iyi ya da en iyiye yakın çizelge çözümleri üretilebilmektedir. Simülasyon tabanlı çizelgeleme modeli, üretilen alternatif çözümlerin değerlendirmesi ve farklı proje senaryolarının gözden geçirilmesine de izin vermektedir. Model ayrıca, proje süresi, faaliyetler ve kaynak kullanımı konusunda farklı raporlar da üretebilmektedir.

Özet (Çeviri)

Project planning and scheduling is one of the most complicated subject in project management. Modeling projects in due consideration of resource constraints and stochastic structure of project elements is quite difficult. Traditional project management techniques may fail in terms of modeling the project close to reality, while mathematical and heuristic scheduling methods can define the problem by means of numerous assumptions. Using more assumptions simplifies modeling, yet transforms the problem into a fictive one.Besides realistic modeling of the problem, developing an optimal or near optimal solution is another important problem in project scheduling. On the other hand, because of many project scheduling problems have too many alternative solutions, these problems become NP-hard. For many project scheduling problems, the mathematical scheduling methods fail to obtain a feasible solution, while heuristic methods can provide a solution more in special problems and prove less than effective in different real-life project scheduling problems.In this study a simulation based scheduling model is proposed for project planning and scheduling. In our model, other than resource constraints of the project, the uncertain activity durations and uncertain resource availabilities can be defined into the problem. With the help of heuristic algorithm incorporated into the simulation model, optimal or near optimal scheduling solutions can be developed for different project scheduling problems. The simulation based project scheduling model permits assessment of alternative solutions created and review of different project scenarios. The model also able to create different reports on project duration, activities and resource utilization.

Benzer Tezler

  1. Konfeksiyon işletmelerinde performans ölçümleri ve işgücü planlanmasına katkıları

    Başlık çevirisi yok

    SEVİN BRAV

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    İşletmeEge Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    DOÇ. DR. M. NAZMİ ERCAN

  2. Hidrolik sistemli bir lizimetrenin kurulması ve toprak su bütçesinin belirlenmesinde kullanılma olanaklarının araştırılması

    Başlık çevirisi yok

    BEYRAMALİ AZİZİ

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    ZiraatÇukurova Üniversitesi

    Toprak Ana Bilim Dalı

    DOÇ. DR. AYTEKİN BERKMAN

  3. Mevcut kaplıca yerleşmelerinin iyileştirilmesini etkileyen faktörler ve Yeni Kaplıca örneği

    Adjustment principles of spas in Turkey, Yeni Kaplıca being the sample

    DOĞAN ÜMİT YÜCEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    İşletmeGazi Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. YÜKSEL ERDEMİR

  4. Etilalkol-su karışımının reftifikasyonu

    Başlık çevirisi yok

    MELSA YILDIZDOĞAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Kimya MühendisliğiEge Üniversitesi

    Kimya Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ERDEN ALPAY