A Case study on interaction between time and cost constituents of a mass-housing construction project

Toplu konut inşaatı projelerinde zaman ve maliyet bileşenlerinin etkileşimi üzerine bir çalışma

  1. Tez No: 33597
  2. Yazar: ARZU BARÇIN YILMAZ
  3. Danışmanlar: DOÇ. DR. MUSTAFA TALAT BİRGÖNÜL
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Proje Planlama, Programlama, Maliyet Kontrolü, Kümülatif İlerleme“S”Grafikleri, Yüklenici Hakedişleri, Yüklenici Maliyetleri, Fiyat Endeksleri, Paranın Zaman Değeri, Project Planning, Scheduling, Cost Control, Cumulative Progress“S”Curves, Progress Payments, Costs to Contractor, Price Indexes, Time Value of Money
  7. Yıl: 1993
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 129

Özet

öz TOPLU KONUT İNŞAATI PROJELERİNDE ZAMAN VE MALİYET BİLEŞENLERİNİN ETKİLEŞİMİ ÜZERİNE BİR ÇALIŞMA YILMAZ, Arzu Barçın Yüksek Lisans Tezi, İnşaat Mühendisliği Anabilim Dalı Tez Yöneticisi : Y. Doç. Dr. Talat BİRGÖNÜL Yardımcı Tez Yöneticisi : Ek. Öğr. Gör. Erkan ŞAHMALI Eylül, 1993, 115 sayfa İnşaat sektörü, Türkiye'nin önde gelen endüstrilerinden biridir. Ülkemizdeki konut açığı, toplu konut inşaatlarının bu sektörde büyük yer almasına yol açmıştır. Bu noktada, proje planlama ve maliyet kontrol teknikleri ekonomik ve hızlı konut üretimi açısından önem kazanmaktadır. Aktivite bazlı planlama, uygulama aşamasında hem maliyet hem de program kontrolü sağlamaktadır. Planlamanın ilk aşaması, aktivitelerin, kaynak ve maliyetlerin belirlenerek planın oluşturulmasıdır. Daha sonra, programlama yapılır ve nakit akışları elde edilir. Güncelleme periyodik olarak sahadan elde edilen bilgilerle yapılır. Bu çalışmada, bir toplu konut projesinin güncellenmiş proje planlan kullanılmıştır. İş miktarı ya da maliyet bazında kümülatif iş akışını gösteren tipik“S”grafikleri ile yapılan analizlerle, projenin planlanan ve gerçekleşen aylık nakit giriş ve çıkışları incelenmiştir. Diğer biranalizde ise, nakit akışları projenin ilk gününe taşınarak karşılaştırma yapılmıştır. Sonuç olarak, proje planlama ve maliyet kontrol tekniklerinin doğru uygulanıldıklarıı zaman, hem yüklenici hem de İşverene yarar sağladığı ortaya koyulmuştur. Aslında, burada önemli olan yüksek karlar sağlamak değil, Türkiye koşullarında herkes tarafından satın alınabilir, kaliteli konutlar üretmektir.

Özet (Çeviri)

ABSTRACT A CASE STUDY ON INTERACTION BETWEEN TIME AND COST CONSTITUENTS OF A MASS-HOUSING CONSTRUCTION PROJECT YILMAZ, Arzu Barçın M.S. in Civil Engineering Supervisor: Asst. Prof.Dr. Talat BİRGÖNÜL Co-supervisor: Part-Time Instr. Erkan ŞAHMALI September, 1993, 115 pages. The construction industry is one of the leading sectors of Turkey. Mass-housing constructions have a great part in this sector, because of deficit of housing units. At this point, planning and cost control gain importance to make economic houses. Activity based planning provides both cost and schedule control during implementation. Initial stage of planning is to develop a project plan by determining the activities, resources and assigning costs. Then, scheduling is done and cash flow of project is determined. Updates are done periodically by capturing data from field. This study makes use of the updated project plans of a mass-housing construction project. Planned and realized monthly cash inflows and outflows of project are analyzed, with the use of typical“S”curves that show cumulative progress of production in mterms of work units or cost. Further analysis is done by computing present values of cash inflows and outflows to make an equitable comparison between them. It is concluded that project planning and cost control, if applied properly by both contractors and clients, produce beneficial results for both parties. In fact, the main point is not to make high levels of profit but to construct affordable, good quality houses for Turkey.

Benzer Tezler

  1. Zeolit ZSM-S katkılı silikon kauçuk membranlarda N-parafin/i-parafin ayrımı

    Separation of n-paraffin/1 -paraffin mixtures by zeolite ZSM-S filled membranes

    NİSO KALAONRA

    Yüksek Lisans

    Türkçe

    Türkçe

    1995

    Kimya Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. BİRGÜL ERSOLMAZ TANTEKİN

  2. Kesiti kademeli değişen plakların titreşimi

    Vibration of plates with stepped thickness

    GÖKAY YAY

    Yüksek Lisans

    Türkçe

    Türkçe

    1994

    Makine Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. ALAEDDİN ARPACI

  3. Isıl işlem koşullarının düşük alaşımlı Ni-Cr-Mo çeliğinin mekanik özelliklerine ve aşınma direncine etkisi

    The Effect of heat treatment on mechanical properties and wear resistance of low alloy Ni-Cr-Mo steel

    CEM ERHAZAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    Metalurji Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ. DR. HÜSEYİN ÇİMENOĞLU

  4. Rethinking agricultural communication in the context of power/knowledge: Socialization of digital agriculture in Geyve

    Tarımsal ı̇letı̇şı̇mı̇ bilgi/iktidar bağlamında yenı̇den düşünmek: Geyve'de dı̇jı̇tal tarımın sosyalleşmesı̇

    KÜBRA SULTAN YÜZÜNCÜYIL

    Doktora

    İngilizce

    İngilizce

    2024

    İletişim BilimleriGalatasaray Üniversitesi

    Radyo Televizyon ve Sinema Ana Bilim Dalı

    PROF. DR. HALİME YÜCEL BOURSE

  5. Fuel oil ile çalışan endüstriyel tip skoç kazanların doğalgaza dönüştürülmesinin bilgisayar simulasyonu

    Computer simulation of converting industrial scotch type boilers working with fuel oil into natural gas

    ARİF LEVENT KUZAY

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    Makine Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. AHMET KARAKAŞ