Proje planlama ve çizelgelemede genetik algoritma ile kritik yolun-proje tamamlanma zamanının tespiti ve zaman-maliyet analizi

The evaluation of the critical path-the project completion time and time-cost analysis with genetic algorithm in project planning and scheduling

  1. Tez No: 362480
  2. Yazar: HAKAN ÖZKÖSE
  3. Danışmanlar: PROF. DR. CEVRİYE GENCER
  4. Tez Türü: Yüksek Lisans
  5. Konular: Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve Kontrol, Bilim ve Teknoloji, Computer Engineering and Computer Science and Control, Science and Technology
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2014
  8. Dil: Türkçe
  9. Üniversite: Gazi Üniversitesi
  10. Enstitü: Bilişim Enstitüsü
  11. Ana Bilim Dalı: Yönetim Bilişim Sistemleri Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 147

Özet

Proje yönetimi içerisinde proje planlama ve çizelgeleme en karmaşık konulardan biridir. Günümüz şartlarındaki rekabet ortamında, faaliyetlerin öncüllük veya ardıllık ilişkisine bağlı olarak hazırlanmış şebeke üzerinde kritik yol/yolların, kritik faaliyetlerin ve proje tamamlanma zamanının elde edilmesi proje planlama ve çizelgeleme için önemlidir. Ayrıca proje planlama ve çizelgelemede, zaman maliyet analizi zamandan tasarruf sağlarken maliyeti de en küçük hale getirmeyi hedefleyerek firmalara rekabet avantajı sağlamaktadır. Bu yüzden, optimizasyon işlemi gerektiren bir konudur ve matematiksel modeli oluşturularak en iyi çözümü bulunabilmektedir. Sezgisel/meta sezgisel algoritmaların ortaya çıkması ile birlikte optimizasyon problemlerinin çözümü daha kolay hale gelmiştir. Tavlama benzetimi, tepe tırmanışı, karınca kolonisi, yapay sinir ağları, genetik algoritmalar gibi birçok meta sezgisel yaklaşım bulunmaktadır. Bu çalışmada, genetik algoritma kullanılarak şebeke üzerindeki kritik yol/yolları, kritik faaliyetleri ve proje tamamlanma zamanını bulan bir proje planlama ve çizelgeleme programı tasarlanmıştır. Ayrıca tasarlanan bu program sayesinde istenen tamamlanma zamanı için zaman maliyet analizi de yapılabilmektedir. Tasarlanan programın etkinliği örnek problemlerle test edilmiş ve karşılaştırılmıştır.

Özet (Çeviri)

Project Planning and Project Scheduling are the most sophisticated subjects of Project Management. At today's competitive environment; determining the critical path, critical activities and the completion time of the project expressed as a network having precedence relationships between activities are highly vital for the Project Planning and Scheduling. Besides the time-cost analysis at Project Planning and Scheduling offers a competitive edge to the firms by saving time and minimizing costs. Therefore it requires optimization and the best solution can be found with mathematical model. The solution of optimization problems have become easier with the occurrence of heuristic / meta heuristic algorithms. There are a lot of meta heuristic approaches like simulated annealing, hill climbing, ant colony, artificial neural networks and genetic algorithm. In this study a Project Planning and Scheduling program was designed which uses genetic algorithm to find the critical path, the critical activities and the time of completion on the network. Moreover by means of the program, the time-cost analysis can be performed within the desired completion time. The effectiveness of the program was also compared and tested with any other examples.

Benzer Tezler

  1. Kısıtlı kaynak koşullarında yapı projelerinin genetik algoritma ile programlanması

    Scheduling of a construction project under constrained-resources condition with genetic algorithm

    MÜRSEL ERDAL

    Doktora

    Türkçe

    Türkçe

    2007

    İnşaat MühendisliğiGazi Üniversitesi

    Yapı Eğitimi Ana Bilim Dalı

    PROF. DR. RECEP KANIT

  2. Bulanık çok modlu kaynak kısıtlı proje çizelgeleme problemlerinin çözümü için matematiksel bir model

    A mathematical model for the solution of the fuzzy multi mode resource-constrained project scheduling problems

    ÖMER ATLI

    Doktora

    Türkçe

    Türkçe

    2012

    Endüstri ve Endüstri MühendisliğiHava Harp Okulu Komutanlığı

    Endüstri Mühendisliği Ana Bilim Dalı

    PROF. DR. CENGİZ KAHRAMAN

  3. Tersanelerde gemi üretim yönetimi modeli: Marmara Bölgesinde bir uygulama

    Model of ship production management in shipyard: A case study in Marmara Region

    ERCAN AKAN

    Doktora

    Türkçe

    Türkçe

    2017

    Denizcilikİstanbul Üniversitesi

    Deniz Ulaştırma İşletme Mühendisliği Ana Bilim Dalı

    PROF. DR. GÜLER ALKAN

  4. Les applications des algorithmes genetiques dans les modüles d'Optimisation des prologiciels de Gestion integre

    İşletme kaynakları planlaması yazılımlarının optimizasyon modüllerinde genetik algoritma uygulamaları

    MELİKE ORHON

    Yüksek Lisans

    Fransızca

    Fransızca

    2001

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    PROF. DR. ETHEM TOLGA

  5. Metasezgisel yöntemlerle proje çizelgeleme optimizasyonu

    Project Scheduling Optimization With Metaheuristic Methods

    TUNCAY SARI

    Doktora

    Türkçe

    Türkçe

    2008

    EkonometriMarmara Üniversitesi

    Ekonometri Ana Bilim Dalı

    PROF. DR. HÜSEYİN BESİM AKIN