Optimum selection of contracting methods and implementation to the underground infrastructure rehabilitation project
Başlık çevirisi mevcut değil.
- Tez No: 402850
- Danışmanlar: PROF. ILAN JURAN
- Tez Türü: Yüksek Lisans
- Konular: İnşaat Mühendisliği, Endüstri ve Endüstri Mühendisliği, Civil Engineering, Industrial and Industrial Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2011
- Dil: İngilizce
- Üniversite: Polytechnıc Instıtute Of New York Unıversıty
- Enstitü: Yurtdışı Enstitü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Özet yok.
Özet (Çeviri)
This research project presents selected contracting methods for the utility rehabilitation projects by integrating social costs as well as construction methods such as trenchless techniques. Compared with the previous studies, it was seen that social cost are slightly considered in the bidding process. Whereas, inclusion of the social costs in contracting methods may become highly valuable to prevent all negative impacts of the work zone as well as reduction project completion time and construction cost. With respect to this aim, each method was evaluated based on the data of the utility rehabilitation project incorporating the different rehabilitation scenario and different work schedule. Several methods have been implemented in order to select the most appropriate method for the Madison Avenue Water Main Rehabilitation Project. The determination of the optimum contracting method was taken into consideration through the cost-benefit analysis of the project.
Benzer Tezler
- Deprem etkisindeki yapıların aktif kontrolü
Active control of structures under seismic excitation
BEKİR BORA GÖZÜKIZIL
- Metro projelerinde kamu-özel işbirliğinin değerlendirilmesi
Assessment of public-private partnerships in metro projects
HAMDULLAH KARA
- İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar
Başlık çevirisi yok
BAHAR TÜRKYILMAZ