Geri Dön

Boztepe tüneli (Ordu çevre yolu projesi) kazı çalışmaları sırasında meydana gelen aşırı sökülmelere süreksizlik düzlemlerinin etkisi

The effect of discontinuity planes on the overbreaks occured during the excavation works of Boztepe tunnel (Ordu peripheral highway)

  1. Tez No: 463707
  2. Yazar: ZAFER YILMAZ
  3. Danışmanlar: YRD. DOÇ. DR. ALİ ÖZVAN, DOÇ. DR. MÜCİP TAPAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Jeoloji Mühendisliği, Geological Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2017
  8. Dil: Türkçe
  9. Üniversite: Yüzüncü Yıl Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Jeoloji Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Tünel kazılarında karşılaşılan en önemli problemlerden biri aşırı sökülmedir. Tez çalışması kapsamında Ordu Çevre Yolu Projesi bünyesinde yapılan Boztepe Tünelinde meydana gelen aşırı sökülmeler incelenmiştir. Kazı çalışmaları sırasında oluşan aşırı sökülmelere süreksizlik düzlemlerinin etkileri kinematik ve analitik analizler yoluyla değerlendirilmiştir. Problemin çözümüne yönelik tünel kazı çalışmaları ile eş zamanlı olarak veri alımı gerçekleştirilmiştir. Aglomeradan oluşan birim içerisindeki süreksizlik düzlemlerinden alınan ölçümler, bu düzlemin kesme dayanımının düşük olduğu değerlendirilmiştir. Yenilmelerin bu düzlemler boyunca geometrik olarak tünel aynası ile kesişen süreksizlikler boyunca kama türü yenilmeler şeklinde geliştiğini ortaya çıkarılmıştır. Aşırı sökülme meydana gelen bölgelerde gözlemler yoğunlaştırılmış, geriye dönük analiz yoluyla bu sökülmelerin sebepleri araştırılmıştır.

Özet (Çeviri)

Determination of characteristics of rock mass in the design of tunnels which are among the main elements of transportation is the key for a safe tunneling. The position, spacing, spanning, the status of underground water and roughness of plenary units in the rock mass directly affect its stability. One of the most important stability problems encountered in tunnel excavation is overbreak. Within the scope of this thesis, overbreaks occurred in Boztepe Tunnel of the Ordu Peripheral Highway located in northeast Turkey. When investi gated. The major part of double tubed Boztepe tunnel goes over from volcanic units. For solution of the problem the data were gathered concurrently with the tunnel boring studies. The position of discontinuity planes where overbreaks occurred was determined and the shear strength on these discontinuity planes was calculated. The data gathered from discontinuity planes in the agglomerate units showed that the overbreaks in this unit were occurred where the shear strength is low and at the discontinuity planes that is geometrically intersecting with the tunnel face.

Benzer Tezler

  1. Gen transferinden hayvancılıkta yararlanma yolları

    The Ways of using the gene transfer in animal breeding

    SAİM BOZTEPE

    Yüksek Lisans

    Türkçe

    Türkçe

    1988

    Ankara Üniversitesi

    Zootekni Ana Bilim Dalı

    Yükleniyor...

  2. Maçka (Trabzon) yöresinin jeolojisi ve piroklastik kayaçlarının incelenmesi

    Başlık çevirisi yok

    ABDURRAHMAN DOKUZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    Karadeniz Teknik Üniversitesi

    Jeoloji Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  3. Halil Nihad Boztepe'nin hayatı, eserleri ve fikirleri

    Başlık çevirisi yok

    ZEMAİ ÇETİNKAYA

    Yüksek Lisans

    Türkçe

    Türkçe

    1990

    Selçuk Üniversitesi

    Yükleniyor...

  4. İşletmelerde verimliliğin ölçülmesi, değerlendirilmesi ve arttırılmasına sistematik yaklaşım

    A Systematic approach for productivity measurement, evaluation and improvement

    RASİH BOZTEPE

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    İstanbul Teknik Üniversitesi

    Yükleniyor...