Geri Dön

Numerical simulation of bi-directional osterberg load tests performed in limestone by using finite element analysis

Kireçtaşında yapılan çift yönlü osterberg kazık yükleme deneylerinin sonlu elemanlar yöntemi ile sayısal simülasyonu

  1. Tez No: 474376
  2. Yazar: NEJLA YILDIZ
  3. Danışmanlar: PROF. DR. FAZLI EROL GÜLER
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2017
  8. Dil: İngilizce
  9. Üniversite: Boğaziçi Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Geoteknik saha deneylerinin başında gelen kazık yükleme deneylerinde, kazıklar üstten yüklenir. Ancak özellikle yüksek taşıma gücüne sahip kazıklarda bu kuvvetin uygulanmasındaki güçlükler sebebiyle, statik basınç yükleme deneyi uygulama tekniklerinden biri olan ve Osterberg Cell yükleme testi olarak da adlandırılan çift yönlü kazık yükleme deneyi geliştirilmiştir. Bu tez kapsamında çift yönlü kazık yükleme testleri sonucu elde edilen yük-oturma davranışının, ideal üstten yüklenen kazık yük-oturma davranışına dönüştürülmesi sırasında kullanılan teorinin doğruluğunu ve iki yöntem arasındaki kazık davranışı farklılığını incelemek için Moskova'da kireçtaşına soketli büyük çaplı kazıklarda gerçekleştirilen üç adet çift yönlü kazık yükleme deneyi, sonlu elemanlar yöntemi ile geri analiz edilmiştir. Deney sırasında elde edilen yük-deplasman davranışı simule edilene ve gerinim ölçerler ile ölçülen birim çevre sürtünmeleri gözlemlenene kadar analiz modelindeki zemin parametreleri kalibre edilmiş ve bu parametrelerle oluşturulan ideal üstten yüklenen kazık hareketi incelenmiştir. Yapılan analizler sonucunda, gerinim ölçerlerin doğru konuma yerleştirilmemesi durumunda yükleme testinde yanlış verilerin ölçülebildiği ve değerlendirmeye katılması durumunda birim çevre sürtünmesi ve dolayısıyla uç direncinin yanlış hesaplanabileceği görülmüş; iki deney yöntemi karşılaştırıldığında birim çevre sürtünme değerlerinin büyüklüklerinin aynı; ancak oluştukları yerlerin farklı olduğu da gözlemlenmiştir. Analizler sonucunda kazık yükleme deneylerinde uygulanan yükün kazık kapasitesinin çok altında olduğu, dolayısıyla ölçülen deformasyonların da az bulunduğu durumlarda kazık taşıma kapasitesinin ve kazık davranışının doğru tahmin edilemeyeceği de görülmüştür.

Özet (Çeviri)

Pile load tests are one of the most important geotechnical field tests. Piles are loaded in practise by the structure from the top. However especially for piles with large load capacities, it is very difficult to simulate this loading method. To overcome this difficulty, bi-directional pile load test which is also called Osterberg Cell load test has been developed. Within the scope of this thesis, the theory which is used for converting load-settlement behaviour obtained during bi-directional pile load test into equivalent load-settlement behaviour in ideal top-down load test has been verified. To compare the pile behaviour during these two tests; test results of three large-diameter instrumented piles socketed in limestone and performed in Moscow are back-analysed by using finite element analysis. Until load-displacement behaviour obtained during the field test is simulated and unit shaft frictions measured via strain gauges are obtained, soil parameters of analysis model are calibrated and ideal top loaded pile behaviour generated by these parameters is investigated. As a result of the analyses, it is seen that if the strain gauges are not placed in the correct position, incorrect data can be measured during pile load test and participating this data in the evaluation could lead to miscalculation of the unit shaft friction and consequently the end bearing resistance. Comparing O-cell load test with the ideal top loading test, it is observed that the unit shaft friction values are the same but the locations where they are observed are different. It is also observed that the pile bearing capacity and pile behaviour could not be predicted correctly when the applied test load is much smaller than the pile bearing capacity and thus the settlements measured during the test are very small.

Benzer Tezler

  1. Diesel motorları yakıt püskürtme sistemlerinin dinamik simülasyonu

    Başlık çevirisi yok

    İRFAN KARAGÖZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. İki katlı pamuk ipliklerinden dokunan kumaşlarda örgüye bağlı olarak maksimum atkı sıklığının değişimi üzerinde bir araştırma

    Başlık çevirisi yok

    MELTEM ASLI NARTER

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  3. Barajların hacim-verim ilişkisi üzerine bir araştırma

    Başlık çevirisi yok

    MEHMET KILIÇARSLAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Çukurova Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. A Decision support system for planning standby garbage collection trucks

    Yedek çöp toplama kamyonlarının planlanması için bir karar destek sistemi

    GÜLSER HACISALİHOĞLU

    Yüksek Lisans

    İngilizce

    İngilizce

    1987

    Orta Doğu Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  5. Regresyon analizi ve Türkiye üzerine bir deneme buğday üretiminin tahmini

    Başlık çevirisi yok

    MACİT MESUT ÖZMEN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Gazi Üniversitesi

    Yükleniyor...