Geri Dön

Özel geliştirilen bir kalıp takip sisteminin hızlı veri toplama için kullanılması ve kalıp miktar ve durumuna bağlı iş çizelgeleme

Use of a specifically developed mold tracking system for fast data collection and job scheduling with mold quantity level

  1. Tez No: 540661
  2. Yazar: FURKAN DIRMIKCI
  3. Danışmanlar: DR. ÖĞR. ÜYESİ KADRİYE ERGÜN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2018
  8. Dil: Türkçe
  9. Üniversite: Balıkesir Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Endüstri Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: 83

Özet

Rekabetçi piyasa ortamında hayatta kalmak isteyen firmalar her bir üretim biriminde etkin, verimli ve ekonomik bir operasyon gerçekleştirebilmek için, üretim planlama ve kontrol sistemlerini entegre etmek ve kullanmak zorundadırlar. Üretim planlama ise üretim sürecinin gerçekleşmesinden önce yapılan bir faaliyettir. Üretim planı, operasyon sırasını, personel sayısını ve işlerin sıralanması için gönderim önceliklerini belirlemeyi içerir. Çalışmanın yapıldığı işletmede gerçekleştirilmek istenen bu hedef doğrultusunda üretim yapabilmek için kullanılan kalıpların sayısının artmasından dolayı elde tutma maliyetlerinde büyük artışlara ulaşılacağı gözlenmiştir. Etkin ve verimli çalışmak isteyen bu firmada elde tutma maliyetlerini optimize edebilecek olan üretim ve stok miktarlarına ait senaryoları uygun kısıtlar altında gözlemleyebilecek ve karar desteği sağlayacak teknikleri kullanmayı amaçlamıştır. Bu yaklaşım üretimde, maliyet ve teslim süresi avantajı elde etmeleri için daha ölçülebilir ve kolay bir yol oluşturmuştur. İş çizelgeleme, gelecek dönemler için malzeme ve zaman faktörü açısından birbiri ile bağlantılı ve bağlayıcı kararlara varılan çok aşamalı bir süreçtir. Katkı sağlayıcı bir çizelgeleme için, eldeki kısıtlı kaynaklara göre üretim süreci ve bu süreçte kullanılacak kaynakları güncel teknolojiler ile takip edebilmeli ve hızlı aksiyon alabilme durumuna ulaşılmalıdır. Çalışmada, Türkiye' nin en büyük yerli sermaye ile trafo üreticisi olan firmanın kuru tip transformatör üretim tesislerinde kritik rol alan kalıpların takibi ve üretim çizelgeleme problemine bir çözüm önerisi sunulmuştur. Bu hedef doğrultusunda kalıp bilgisine ve durumuna ihtiyaç duyan tüm personelin erişebilmesi için bir masaüstü yazılım geliştirilmiş ve sahadan anlık olarak veri toplayabilmek için mobil el terminali kullanılmıştır. Firmada bulunan tüm kalıplar ısı ve ısığa dayanıklı barkod etiketleri yapıştırılmıştır. Planlama işlemini gerçekleştirmek için bir sıralama algoritması geliştirilmiştir. Geliştirilen algoritma ve takip sistemi ile hem iş çizelgeleme senaryoları hem de takip edilmesi zor olan kalıplar hakkındaki tüm bilgiler tek bir noktada toplanmıştır.

Özet (Çeviri)

Companies that want to survive in a competitive market environment have to integrate and use production planning and control systems in order to be able to perform efficient, productive and economical operations in each production unit. Production planning is an activity carried out before the production process takes place. The production plan includes determining the order of operations, the number of staff and the priorities for sorting jobs. It has been observed that large increases in the holding costs can be achieved due to the increase in the number of molds used for production in the direction of this target which is to be realized in the operation of the worker. This company which wants to work effectively and efficiently aims to use techniques that can observe the scenarios of production and stock quantities that can optimize the holding costs under suitable constraints and provide decision support. This approach has created a way to be more measurable and easy to achieve in production, cost and delivery time advantages. Job scheduling is a multi-stage process that reaches interconnected and binding decisions in terms of material and time factors for the coming periods. For contributory scheduling, it is necessary to follow the production process and the resources to be used in this process with current technologies according to the limited sources available and to be able to take action quickly. In the study, Turkey's largest domestic capital firm with dry-type transformer manufacturer follow the pattern of areas critical role in the production facilities and production scheduling suggest a solution to the problem is presented. For this purpose, a desktop software was developed for all workers in need of mold information and status, and a mobile hand terminal was used to collect data instantly from the production site. Heat and light resistant barcode labels are attached to all molds in the company. The sorting algorithm has been developed to carry out the planning process. With the developed algorithm and tracking system, all the information about the work scheduling scenarios and the molds which are difficult to follow are gathered in a single point.

Benzer Tezler

  1. Yeni Cami'nin akustik açıdan performans değerlendirmesi

    Evaluation of the acoustical performance of the New Mosque

    EVREN YILDIRIM

    Yüksek Lisans

    Türkçe

    Türkçe

    2003

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    PROF. DR. SEVTAP YILMAZ DEMİRKALE

  2. Implementation of a lightweight trusted platform module

    Gömülü sistemler için güvenilir platform modülü tasarımı

    MEHMET AKİF ÖZKAN

    Yüksek Lisans

    İngilizce

    İngilizce

    2014

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Elektronik ve Haberleşme Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SIDDIKA BERNA ÖRS

  3. Fake news classification using machine learning and deep learning approaches

    Makine öğrenimi ve derin öğrenme yaklaşımlarını kullanarak sahte haber sınıflandırması

    SAJA ABDULHALEEM MAHMOOD AL-OBAIDI

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolGazi Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ TUBA ÇAĞLIKANTAR

  4. Performans testleri ve antrenman uygulamaları için geliştirilmiş modüler hız kontrol ve takip ünitesinin geçerlik ve güvenirlik çalışması

    Validity and reliability study of modular speed control and tracking unit developed for performance tests and training applications

    ABDULLAH ÇETİNDEMİR

    Doktora

    Türkçe

    Türkçe

    2024

    SporTrabzon Üniversitesi

    Beden Eğitimi ve Spor Ana Bilim Dalı

    PROF. DR. HAMİT CİHAN

  5. Numerical simulation of transient sandface and wellbore temperature behaviors of wells in multilayer single-phase oil and geothermal reservoirs

    Çok tabakalı, tek-fazlı petrol ve jeotermal rezervuarlardaki kuyuların kararsız kuyu cidarı ve kuyu içi sıcaklık davranışlarının sayısal simülasyonu

    CİHAN ALAN

    Doktora

    İngilizce

    İngilizce

    2022

    Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik Üniversitesi

    Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı

    DOÇ. DR. MURAT ÇINAR