Geri Dön

Manufacturing/production improvement using manufacturing systems approach

Başlık çevirisi mevcut değil.

  1. Tez No: 645351
  2. Yazar: Mürsel DARICI
  3. Danışmanlar: Belirtilmemiş.
  4. Tez Türü: Yüksek Lisans
  5. Konular: İşletme, Business Administration
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2017
  8. Dil: İngilizce
  9. Üniversite: Unıversıty Of Warwıck
  10. Enstitü: Yurtdışı Enstitü
  11. Ana Bilim Dalı: Belirtilmemiş.
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Özet yok.

Özet (Çeviri)

This study is conducted to apply lean manufacturing principles and tools to a die casting company's selected production line with the purpose of eliminating wastes and increasing the efficiency in the shop floor. A research methodology study is conducted in furtherance to choose the right research method for the project and its tools. Afterwards, a review of lean manufacturing was carried out in order to develop a background knowledge on lean manufacturing. This process enable the critical thinking and critical analysing ability on the topic of the study. The selected production line of the organization was analysed using value stream mapping tool in order to identify wastes and other problems such as long die changeover times and excess number of operators. Improvements are then proposed to address these waste and other problems. Improvements are subsequently proposed, such as cellular layout, automation and reduction of workforce. Proposed improvements, which worth 2,825,495₺, are clearly explained in the suggestion part regarding the reasons of offering them as well as the outcomes of these improvements. As a result of these improvements; 78% of the wastes occurring in the shop floor is eliminated, value adding ratio is increased by 26% and die changeover time decreased by 62%. Other effects of these improvements are decreased costs, increased capacity, profits, quality, reliability and competitiveness. Finally, an implementation plan is proposed by taking into account delivery notice periods and necessary movements of the machines. It is expected to 16 weeks to complete the implementation process for a cell, two years for fully implementing to whole production line

Benzer Tezler

  1. Grup teknolojisi imalat sistemi ve bu sistemin tasarımına yönelik yeni bir metot

    Group technology manufacturing systems and a new method oriented to the design of these systems

    M. BÜLENT DURMUŞOĞLU

    Doktora

    Türkçe

    Türkçe

    1986

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  2. Esnek üretim sistemleri için bir etkin üretim denetleme modeli

    An Effective supervisory control model for flexible manufacturing systems

    BAHAR KORKUSUZ

    Doktora

    Türkçe

    Türkçe

    1989

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  3. Grup teknolojisi imalat sistemi ve sezgisel bir kümelendirme yöntemi

    Group technology manufacturing system and a heuristic clustering method

    A. KAMİL ATALAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  4. İhracaat rejiminin yasal çerçevesi ile ihracatı teşvik tedbirlerinin esasları

    Priciples of encouragement precautions of export together with the legal frame of the export regime

    FİLİZ ALADAĞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1989

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  5. Üretim planlama ve kontrol ile uygulama sonuçlarının değerlendirilmesi

    A Tentative study on applied production planning and control

    ULVİYE ÜNAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  6. IEEE 1149.1 standardı kullanarak test edilebilir lojik devre tasarımı

    Testable lojik circit design by using IEEE 1149.1 standard

    A.BETÜL TUNCER

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    İstanbul Teknik Üniversitesi

    Yükleniyor...