Development of a BIM based delay analysis method in construction industry

İnşaat sektöründe BIM tabanlı gecikme analizi yönteminin geliştirilmesi

  1. Tez No: 713072
  2. Yazar: MURAT ÇEVİKBAŞ
  3. Danışmanlar: DOÇ. DR. ZEYNEP IŞIK
  4. Tez Türü: Doktora
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: Yıldız Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: İnşaat Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: 256

Özet

Bu tezde, gecikme analizleri ile ilgili inşaat sektöründeki mevcut sorunlar, literatürdeki boşluklar ve eğilimler bilgi toplama kapsamında iki araştırma altında tespit edildi ve bu, çalışmanın temel amacını belirledi. İlk olarak VOSviewer yazılımı ile Scientometric Analizi yapılmıştır. Mevcut gecikme analizi yöntemlerinin zorlukları ve sakıncaları nedeniyle literatürde yeni gecikme analizleri geliştirmeye yönelik boşluklar ve eğilimler olduğu sonucuna varılmıştır. İkinci olarak, gecikme analizi yöntemleri ile ilgili daha fazla sorunu tespit etmek için 7 uzmanla birlikte bir uzman inceleme toplantısı yapılmış ve katılımcıların görüşlerindeki ortak temalar bu çalışmada sunulmuştur. Sonuç olarak, bu çalışmada mevcut gecikme analizleri ile ilgili sorunlar vurgulanmıştır. Tespit edilen problemlerin üstesinden gelmeden güvenilir analizler yapmanın zor olduğu açıktır. Bu nedenle, bu çalışmada, proje gecikmelerini hesaplayabilmek ve proje gecikmelerini sözleşme taraflarına sistematik ve verimli bir şekilde bölüştürebilmek için, tespit edilen eksiklikleri gideren, Modified Schedule vs Modified Updated Schedule (MSvsMUS) adlı yeni bir gecikme analizi yönteminin geliştirilmesi amaçlanmıştır. Metodun geliştirilmesinin ardından, varsayımsal bir çalışma, gerçek bir vaka çalışması ve bir uzman paneli aracılığıyla yöntemin geçerliği sağlanmıştır. Genel olarak, MSvsMUS tüm katılımcılar tarafından uygulanabilir olarak kabul edildi. Daha sonra geliştirilen yöntem,“C++”programlama dili kullanılarak Bexel Manager adlı 4D-BIM yazılımına entegre edilmiştir. Geliştirilen yöntemin 4D-BIM yazılımına entegrasyonu vaka çalışması olarak gerçek bir konut projesi ile başarıyla test edilmiştir. Yeni bir gecikme analiz yöntemi geliştiren ve bu modeli BIM yazılımına entegre eden bu çalışmanın, mevcut gecikme analizi uygulamalarında karşılaşılan tespit edilen sorunlara çözüm sunarak inşaat sektöründe önemli bir gelişme sağlayacağına inanılmaktadır.

Özet (Çeviri)

In this thesis, as part of information gathering concerning delay analyses in the construction industry, the current problems, gaps and trends were detected under two researches, which enabled to set the core objective of this study. Firstly, Scientometric Analysis was conducted via VOSviewer software. It was concluded that there are gaps and trends in literature towards developing new delay analyses because of the challenges and drawbacks of the existing delay analysis methods. Secondly, an expert review meeting with 7 experts was conducted and common themes of the participants' views are presented in this study to detect further problems concerning delay analysis methods. All in all, in this study, the problems related to current delay analyses were highlighted. It is clear that it is difficult to conduct reliable analyses without overcoming the detected problems. Therefore, in this study, it is aimed to develop a new delay analysis method named Modified Schedule vs Modified Updated Schedule (MSvsMUS), which overcomes the detected drawbacks to be able to compute the project delays and apportion the project delays to the contracting parties systematically and efficiently. Following the development of the method, the method was validated through a hypothetical study, a real case study and an expert panel. On the whole, MSvsMUS was regarded as applicable by all of the participants. Afterwards, the developed method was integrated into 4D-BIM software, namely Bexel Manager by using the programing language of 'C++'. The integration of the method into 4D-BIM software was successfully tested with a real dwelling project as a case study. Developing a new delay analysis method and integrating it into BIM software, this study is believed to provide a significant improvement in the construction industry by presenting solutions for detected problems faced in the current delay analysis applications.

Benzer Tezler

  1. İnşaat projelerinde akıllı mobil cihazlarla desteklenen verimlilik kontrol sistemi önerisi ve kullanım deneyimleri hakkında inceleme

    Smart mobile devices integrated productivity control system proposal and analysis of user experiences in the construction projects

    ONUR KEREM ÖRENLİ

    Yüksek Lisans

    Türkçe

    Türkçe

    2022

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. DENİZ ARTAN

  2. Banka şube mimarisinin yeni teknolojilere adapte olabilme potansiyelinin ölçülmesine yönelik bir yaklaşım önerisi

    Measuring adaptability of the banking branchs to the new technologies: A new approach

    SEÇİL ÖZER

    Yüksek Lisans

    Türkçe

    Türkçe

    2018

    Mimarlıkİstanbul Teknik Üniversitesi

    Bilişim Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ ASLI KANAN

  3. Ulusal Yapı Enformasyon Modellemesi (YEM/BIM) Kütüphanesi içeriğinin sektörel ihtiyaçları karşılayacak şekilde geliştirilmesi için bir araştırma: kapı örneği

    A research for development of National Building Information Modelling (BIM) Library content in line with sectoral needs: The case of doors

    GONCA AKKÜÇ

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. FETHİYE ECEM EDİS

  4. Kıyı yapısı inşaatları için iş güvenliği risk yönetim sistemi

    Occupational safety risk management system for coastal structure construction

    DİNÇER İNANÇ YILMAZ

    Doktora

    Türkçe

    Türkçe

    2024

    Mühendislik Bilimleriİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. DENİZ ARTAN

  5. Analysis of consultant and employer risks in traditional design and BIM projects

    Geleneksel tasarım ve BIM projelerinde müşavir ve işverenin risklerinin değerlendirilmesi

    DENİZ ARDA UĞUR

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. DENİZ ARTAN