Geri Dön

Analyses of serial production lines and assembly systems for throughtput and interdeparture time variability

Seri üretim hatları ve montaj sistemlerinin üretim hızı ve ürün çıkış zamanı farklarının varyansı açısından incelenmesi

  1. Tez No: 79315
  2. Yazar: ABDULLAH GÜRHAN KÖK
  3. Danışmanlar: DOÇ. DR. İHSAN SABUNCUOĞLU
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Throughput, Interdeparture Time Variability, Serial Production Lines, Assembly Systems, Performance Evaluation. m
  7. Yıl: 1998
  8. Dil: İngilizce
  9. Üniversite: İhsan Doğramacı Bilkent Üniversitesi
  10. Enstitü: Mühendislik ve Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 96

Özet

ÖZET SERİ ÜRETİM HATLARI VE MONTAJ SİSTEMLERİNİN ÜRETİM HIZI VE ÜRÜN ÇIKIŞ ZAMANI FARKLARININ VARYANSI AÇISINDAN İNCELENMESİ Abdullah Gürhan Kök Endüstri Mühendisliği, Yüksek Lisans Danışman: Doç. Dr. İhsan Sabuncuoğlu June 1998 Bu çalışmada üretim sistemi tasarım problemleri incelenmiştir. İlk olarak, seri üretim hatlarında istasyon sayısı, stok kapasitesi, stok tahsis biçimleri ve darboğaz istasyonun konumu gibi bir çok dizayn faktörünün ürün çıkış zamanı farklarının varyansı açısından performansı üzerindeki etkileri analiz edilmiştir. Çalışmanın ikinci kısmında, montaj sistemlerindeki parça istasyonu sayısı, işlem zamanı dağılımları, stok kapasitesi ve stok tahsis biçimleri gibi faktörlerin üretim hızı ve ürün çıkış zamanı farklarının varyansına etkileri incelenmiştir. İş transferine alternatif olarak değişkenlik transferi sunulmuş ve etkinliği değerlendirilmiştir. Daha önceki araştırmalar optimal üretim hızının bazı işlem zamanı dağılımları için anormal bir davranış sergilemekte olduğunu göstermiştir. Bu olgu derinlemesine incelenmiş ve sebepleri açıklanmıştır. Üçüncü kısımda ise, seri üretim hatları ve montaj sistemleri sabit iş yükü koşulu altında araştırılmıştır. Optimal sistem büyüklüğünün belirlenmesi probleminin yanı sıra bazı dizayn faktörlerinin üretim hızı, ürün çıkış zamanı farklarının varyansı ve maliyet ile ilgili ölçütler üzerine etkileri de çözümlenmiştir. Her aşamada bir çok yeni bulgu ve önemli pratik çıkarımlar da sunulmaktadır. Anahtar sözcükler. Üretim Hızı, Ürün Çıkış Zamanı Farklarının Varyansı, Seri Üretim Hatları, Montaj Sistemleri, Performans Değerlendirilmesi. iv

Özet (Çeviri)

ABSTRACT ANALYSES OF SERIAL PRODUCTION LINES AND ASSEMBLY SYSTEMS FOR THROUGHPUT AND INTERDEPARTURE TIME VARIABILITY Abdullah Gürhan Kök M.S. in Industrial Engineering Advisor: Assoc. Prof. îhsan Sabuncuoğlu June, 1998 In this thesis, we study three different but closely related production system design problems. First, we investigate the effects of various design factors such as number of stations, buffer capacity, allocation of buffers and location of a bottleneck on the interdeparture time variability of serial production lines. In the second part, we study the effects of number of component stations, processing time distributions, buffers and buffer allocation schemes on throughput and interdeparture time variability of assembly systems. As an alternative to work transfer, we introduce variability transfer and assess its effectiveness. We analyze the anomaly displayed by optimal throughput for some processing time distributions and uncover the underlying details of this behavior. In the third part, we analyze serial production lines and assembly systems under constant workload condition. In addition to investigating the problem of determining the optimal system size, we examine the effects of other design factors such as buffers and material handling time on throughput, interdeparture time variability and cost related measures. Each part reveals several important findings. We also discuss the managerial implications of these findings to present guidelines for the practitioners.

Benzer Tezler

  1. Takım çalışması esaslı demontaj hattı işgören atama ve dengeleme problemi için oyun teorisi odaklı yaklaşımlar

    Game theory-oriented approaches for multi-manned disassembly line worker assignment and balancing problem

    YILDIZ KÖSE

    Doktora

    Türkçe

    Türkçe

    2023

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    PROF. DR. EMRE ÇEVİKCAN

    DR. ÖĞR. ÜYESİ SİNAN ERTEMEL

  2. Comparison of maintenance policies in a serial production system with finite buffers

    Sonlu ara stoklu seri üretim sistemlerinde bakım politikalarının mukayesesi

    BAHA GÜNEY

    Doktora

    İngilizce

    İngilizce

    1998

    Mühendislik BilimleriMarmara Üniversitesi

    İşletme Mühendisliği Ana Bilim Dalı

    PROF. DR. NÜKET YETİŞ

  3. Bir dişli pompa grubunun imalatında eşzamanlı mühendislik ve grup teknolojisi

    The carrying out of group technology in the concurrent engineering concept on a factory which is manufacturing gear pomp

    ALPER ASLAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1997

    Makine Mühendisliğiİstanbul Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    PROF. DR. TEOMAN KURTAY

  4. Multiprose small helicopter concurrent engineering design

    GAP-4(sivil)-ÇAKAH(askeri) çok amaçlı 4-5 kişilik helikopter geliştirme ve seri üretim programı

    YUSUF UĞUR

    Yüksek Lisans

    İngilizce

    İngilizce

    1999

    Havacılık Mühendisliğiİstanbul Teknik Üniversitesi

    DOÇ.DR. Y. KEMAL YILLIKÇI

  5. Çok parçalı sac konstrüksiyonlarda kümülatif ölçü sapmalarının ölçme ve analizlere dayalı olarak belirlenmesi ve bir algoritma geliştirilmesi

    Determining of cumulative dimension deviations in multi – part sheet metal constructions by means of measurements and analyses and development of an algorithm

    CEM YURCİ

    Doktora

    Türkçe

    Türkçe

    2017

    Makine MühendisliğiYıldız Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ANIL AKDOĞAN

    PROF. DR. M. NUMAN DURAKBAŞA