Geri Dön

Yapı işlerinde yüksekte çalışmalarda iş sağlığı ve güvenliği risk değerlendirmesi performanslarının ölçülmesi için model geliştirilmesi

Developing a model for measuring occupational health and safety risk assessment performances in work at height in construction works

  1. Tez No: 795959
  2. Yazar: AHMET ESAT KORKUT
  3. Danışmanlar: PROF. DR. MÜRSEL ERDAL
  4. Tez Türü: Doktora
  5. Konular: İnşaat Mühendisliği, Kazalar, Civil Engineering, Accidents
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2023
  8. Dil: Türkçe
  9. Üniversite: Gazi Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Kazaların Çevresel ve Teknik Araştırması Ana Bilim Dalı (disiplinlerarası)
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

İnşaatlar çok tehlikeli sınıfta yer alan çalışma ortamlarıdır ve ülkemizde en fazla ölümlü iş kazası inşaat sektöründe gerçekleşmektedir. İşyerlerinde; kazaların azaltılmasında risk değerlendirilmesi yapılmasının önemli rol oynadığı bilinmektedir. Bu çalışmada, risk değerlendirmesi performanslarının ölçülmesi, risk değerlendirmesi adımlarının işyerlerinde uygulanma düzeylerinin belirlenmesi ve risk değerlendirmesi adımları ile risk değerlendirmesi performansı arasındaki ilişkinin belirlenmesi amaçlanmıştır. Bu amaçla, mevzuat ve literatür taraması yoluyla risk değerlendirmesi uygulama adımları öğeleri listesi hazırlanmış ve risk değerlendirmesi performansını belirlemek için puanlama yapabilen sistematik bir model geliştirilmiştir. Modelde, yapı işlerinde yüksekte çalışma konusunda kontrol listesi hazırlanmış, kontrol listesinde yer alan kriterlerin ağırlıklandırılması için Delphi yöntemi, konu başlıklarının ağırlıklandırılması için ise Analitik Hiyerarşi Prosesi (AHP) yöntemi kullanılmıştır. Bu çalışmanın etkinliğini ve verimliliğini doğrulamak için hazırlanan anket, Ankara ilinde faaliyet gösteren 43 adet inşaat işyerine uygulanmış ve bu işyerlerinin hazırladıkları risk değerlendirmelerinin analizleri gerçekleştirilmiştir. Yapılan anket ve analizler sonucunda; işyerlerinde genel olarak risk değerlendirme adımlarının uygulanma düzeylerinin düşük olduğu, risk değerlendirmesi performanslarının 100 üzerinden 11,3 ila 81,7 değerleri arasında değiştiği ve risk değerlendirmelerinin niteliklerinin tehlike tanımlama seviyeleri bağlamında oldukça düşük olduğu tespit edilmiştir. Bununla birlikte bu çalışmada, doğrusal regresyon analizi kullanılarak risk değerlendirme uygulama adımları ile risk değerlendirmesi performansı arasındaki ilişkinin varlığı ve derecesi belirlenmiştir. Sonuç olarak, bu çalışma ile işverenler ve iş güvenliği profesyonelleri, belirlenen adımları takip ederek ideal bir risk değerlendirmesi dokümanı hazırlayabilecek, risk değerlendirmesinin niteliği ile kapsamını ölçebilecek ve risk değerlendirmesinde geliştirilmesi gereken alanları belirleyebilecektir.

Özet (Çeviri)

Constructions are working environments in the very dangerous class and the highest number of fatal occupational accidents occur in the construction sector in our country. In workplaces; it is known that performing risk assessment play an important role in reducing accidents. In this study, it is aimed to measure the performances of risk assessment, to detect the level of application of risk assessment steps in workplaces and to determine the relationship between risk assessment steps and risk assessment performance. To this end, a list of risk assessment implementation steps items was prepared through legislation and literature review and a systematic model that can score was developed to determine the performance of risk assessment. In the model, a checklist was prepared for working at height in construction works, the Delphi method was used to weight the criteria in the checklist and the Analytical Hierarchy Process (AHP) method was used to weight the titles. The questionnaire prepared to verify the effectiveness and efficiency of this study was applied to 43 construction workplaces operating in the province of Ankara and analyzes of the risk assessments prepared by these workplaces were carried out. In order to verify the effectiveness and efficiency of this study, a questionnaire was applied to 43 construction workplaces in the province of Ankara and the analysis of the risk assessments they prepared was carried out. As a result of the surveys and analyzes, it has been determined that the general level of implementation of risk assessment steps in workplaces is low, risk assessment performances vary between 11.3 and 81.7 out of 100, and the quality of risk assessments is quite low in terms of hazard definition levels. Furthermore, in this study, the existence and degree of the relationship between risk assessment application steps and risk assessment performance were determined using lineer regression analysis. As a result, with this study, employers and occupational safety professionals will be able to prepare an ideal risk assessment document by following the determined steps, measure the quality and scope of risk assessment and identify areas that need improvement in risk assessment.

Benzer Tezler

  1. Health and safety cost evaluation in construction projects case study: Oman DMIA project

    İnşaat projelerinde işçi sağlığı ve iş güvenliği maliyet incelemesi örnek olay: Umman Uluslararası Havalimanı Projesi

    ŞAFAK CINGILLIOĞLU

    Yüksek Lisans

    İngilizce

    İngilizce

    2012

    İstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Bazı esterlerin kinetik incelenmesi ve termodinamik parametrelerin belirlenmesi

    Kinetic study and detesmination of thermodnamic parameters of some esters

    İBRAHİM TAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Kimya Ana Bilim Dalı

    Yükleniyor...

  3. Dokuma kumaşlarda örgü tipinin ham kumaşın boyutları ve geometrik özellikleri üzerindeki etkilerinin araştırılması

    Başlık çevirisi yok

    EMEL ÖNDER

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. Vecihi Bey'in hikayelerinde fiktif yapı

    Başlık çevirisi yok

    MEHMET ÖNAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Gazi Üniversitesi

    Türk Dili ve Edebiyatı Ana Bilim Dalı

    Yükleniyor...

  5. Ege bölgesi keçi liflerinin bazı önemli fiziksel, kimyasal özellikleri ve değerlendirme imkanları

    Başlık çevirisi yok

    NİLÜFER ERDEM

    Doktora

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...