Geri Dön

Bir açık ocak maden işletmesindeki delme-patlatma faaliyetlerinin iki farklı risk değerlendirme yöntemiyle analiz edilmesi

Analysis of drilling and blasting activities in an open pit mine with two different risk assessment method

  1. Tez No: 798944
  2. Yazar: BEYZA KILIÇ
  3. Danışmanlar: PROF. DR. GÜZİN GÜLSEV UYAR AKSOY
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2023
  8. Dil: Türkçe
  9. Üniversite: Hacettepe Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Madencilik, ülkemizde çalışan sayısı bakımından en fazla ölümlü iş kazasının olduğu sektörlerden birisi olup madencilik faaliyetlerinin neredeyse her aşaması az veya çok oranda risk barındırmaktadır. Bu yüzden öncelikle çalışan sağlığı daha sonra işletmenin güvenliği bakımından iş sağlığı ve güvenliği (İSG) çalışmaları yapmak oldukça önemlidir. Bu çalışmalar içerisinde risk değerlendirmesi önemli bir yer tutmaktadır. Risk değerlendirmesi, bir yerde var olan ya da dış kaynaklarla meydana gelebilecek olan tehlikelerin belirlenmesi ve tespit edilen tehlikelerin risk haline gelmesine yol açacak faktörlerin analiz edilmesidir. Bu analizlerin derecelendirilmesi ve kontrollerinin yapılması sonucu alınabilecek tedbirlerin belirlenmesi konusunda yardımcı olur. Literatürde madencilik faaliyetleri ile ilgili birçok risk analizi bulunmakta olup, delme- patlatma faaliyetlerine bağlı risk analizi azdır. Delme-patlatma faaliyetinde yaşanacak aksaklıklar sadece iş sağlığı ve güvenliği açısından değil aynı zamanda operasyonel açıdan da riskler barındırmaktadır. Tez kapsamında yapılan çalışmada ise delme-patlatma faaliyetleri sırasında meydana gelebilecek olası riskler belirlenmiş olup, bu risklerin operasyonel ve iş sağlığı güvenliği ve çevre bakımından sonuçları değerlendirilmiştir. Bu çalışmada bir maden işletmesinde, patlayıcıların sahaya nakledilmesinden delme ve patlatma işlemi tamamlanana kadar geçen süreçteki her bir adım incelenmiş ve risk analizi yapılmıştır. Açık ocak üretim yöntemiyle işletilen bir altın madeninde risk değerlendirmesi iki farklı risk analiz yöntemiyle yapılmış ve sonuçları karşılaştırılmıştır. L tipi matris ve Fine-Kinney metotları ile risk analizleri yapılmış olup uygulanabilir önlemler ortaya çıkarılmıştır. Tez çalışmasının yapıldığı sahada konu ile ilgili alınan mevcut önlemler üzerinde çalışılmış aynı zamanda önceden belirlenmeyen riskler ve bunların önlemleri üzerinde çalışmalar yapılmıştır. Sahada mevcutta bulunan prosedür ve talimatlar incelenmiştir. Madencilik sektöründeki risklerin en aza indirilebilmesi için delme-patlatma risk analizi, prosedür ve talimat dokümanları oluşturulması gerekmektedir. İki farklı yöntemle yapılan risk analizinde yöntem farklılığından kaynaklı sınıflandırmanın ne kadar değiştiği gözlenmiştir. Böylece hem operasyonel hem de iş sağlığı güvenliği açısından oluşan riskler ve bu risklerin kategorisi daha belirgin bir şekilde ayrılabilmiştir. Bu kapsamda çalışma yapılan sahada çıkan analiz sonuçlarına göre prosedür oluşturulmuş ve sahada uygulamaya konulması için çalışmalar yapılmıştır.

Özet (Çeviri)

Mining is among the sectors with the highest number of work-related fatal injuries in terms of ratio among total personnel in Turkey, and almost every stage of mining activities has high risk. Therefore, it is very important to carry out occupational health and safety (OHS) studies in terms of personnel health and safety at the workplace. Risk assessments have an important place in these studies regarding health and safety. Risk assessment is the determination of the hazards that exist in a place or that may occur with external sources, and the analysis of the risks arising from the factors and hazards that will cause the identified hazards to become a risk. The classification and control of these hazards and risks gives us information about the comparison of the measures that can be taken. There are many risk analyzes related to mining activities in the literature, but there are very few risk analysis related to drilling and blasting activities. Failures to be experienced in drilling and blasting activities involve risks not only in terms of occupational health and safety, but also in terms of operational efficiency. In the study conducted within the scope of the thesis, possible risks that may occur during drilling and blasting activities were determined and the results of these risks in terms of operational and occupational health and safety and environment were evaluated. In this study, each step in the process from the transportation of the explosives to the site to the completion of the drilling and blasting process in a mining operation was carefully examined and a risk analysis was made. The risk assessment made in a gold mine operated with the open pit method and this assessment were made with two different risk analysis methods and compared. Risk analyzes were made with L-type matrix and Fine-Kenney methods and applicable controls are established. At the mine site where the thesis study was carried out, the current risk management measures applied on the drilling and blasting were studied, and at the same time, studies were carried out on the risks that were not determined beforehand and their mitigating actions were evaluated. The procedures and guidelines available at the mine site were examined. In order to minimize the OHS risks in the mining sector, drilling and blasting risk analysis procedures and guidelines should be created. In the risk analysis conducted with two different methods, it was observed how much the classification changes due to the methodological differences. Thus, the risks that occur in terms of both operational and occupational health and safety and the category of these risks can be identified with more precision. In this context, a procedure was created according to the results of the analysis in the mine site where the study was conducted and studies were carried out to put it into practice.

Benzer Tezler

  1. Ovulasyon indüksiyonu tedavisinde folliküler gelişimin ultrasonografik takibi

    Başlık çevirisi yok

    MERİH BAYRAM

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    Kadın Hastalıkları ve Doğum Ana Bilim Dalı

    Yükleniyor...

  2. Bir ilaç fabrikasında personel gereksinmesinin belirmesi seçilmesi ve elde tutulmasına yönelik bir uygulama çalışması

    Başlık çevirisi yok

    EMİNE BOZBAĞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1989

    İstanbul Üniversitesi

    Çalışma Ekonomisi ve Endüstri İlişkileri Ana Bilim Dalı

    Yükleniyor...

  3. İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar

    Başlık çevirisi yok

    BAHAR TÜRKYILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    Yükleniyor...

  4. Atherosklerotik kalp hastalıklarında risk faktörleri

    Risk factors in the coronary artery disease

    MURAT SUHER

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    İç Hastalıkları Ana Bilim Dalı

    Yükleniyor...

  5. Diesel motorları yakıt püskürtme sistemlerinin dinamik simülasyonu

    Başlık çevirisi yok

    İRFAN KARAGÖZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...