Rısk assessment of the ıntegrated health campus projects carrıed out wıth the publıc-prıvate partnershıp (PPP) model ın turkey
Türkiyede kamu-özel işbirliği modeli ile yürütülen entegre sağlık kampüsü projelerinin risk değerlendirmesi
- Tez No: 967274
- Danışmanlar: PROF. DR. SOOFIA TAHIRA ELIAS OZKAN
- Tez Türü: Yüksek Lisans
- Konular: Mimarlık, Architecture
- Anahtar Kelimeler: Hastane binaları, Risk analizi, Hospital buildings, Risk analysis
- Yıl: 2025
- Dil: İngilizce
- Üniversite: Orta Doğu Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Mimarlık Ana Bilim Dalı
- Bilim Dalı: Yapı Bilimleri Bilim Dalı
- Sayfa Sayısı: Belirtilmemiş.
Özet
1980'lerin başından bu yana öne çıkan bir proje tedarik yöntemi olarak benimsenen kamu-özel iş birliği (KÖİ) modeli, 2009 yılından itibaren Türkiye genelinde ülkenin sağlık altyapısına kazandırılan entegre sağlık kampüsü (ESK) yatırımlarının hayata geçirilmesinde Sağlık Bakanlığı tarafından da tercih edilmiştir. KÖİ projelerinin objektif, güvenilir ve uygulanabilir bir risk değerlendirme sürecine tabi tutulması, proje yaşam döngüsü boyunca en önemli başarı kriterlerinden biri olarak kabul edilmektedir. Bu gereklilik doğrultusunda, çalışma kapsamında Sağlık Bakanlığı tarafından gerçekleştirilen on sekiz ESK projesine ilişkin olarak; risklerin tanımlanması, değerlendirilmesi, tahsisi ve yönetimi aşamalarını içeren kapsamlı bir risk değerlendirme süreci yürütülmüştür. Bu amaçla, literatür taraması sonucunda belirlenen otuz altı risk faktörü kullanılarak, söz konusu KÖİ projelerinde farklı kademelerde görev almış altmış uzmanın katılımıyla gerçekleştirilen bir anket çalışması gerçekleştirilmiştir. Çalışma sonucunda, projelerin gerek inşaat gerekse işletme dönemlerinde risklerin meydana gelme olasılıkları ile etkilerinin büyüklük dereceleri ortaya konulmuştur. Ayrıca, Türkiye'de sağlık tesisi yatırımlarının KÖİ çerçevesinde gerçekleştirilmesini düzenleyen mevzuat ve tip proje anlaşmalarının detaylı biçimde incelenmesi yoluyla, belirlenen risklerin gerçekleşmesi halinde ortaya çıkabilecek olumsuz sonuçlarının yönetilmesinden hangi proje paydaşının sorumlu olacağı tespit edilmiştir. Sistematik ve makroekonomik temelli olan yatırım dönemi ve işletme dönemi döviz kuru riski, finansman riski ve iş değişikliği risklerinin ESK projelerinin zamanında ve maliyet etkin biçimde sürdürülebilmesi açısından yüksek düzeyde tehdit oluşturduğu tespit edilmiştir. Bu doğrultuda, söz konusu risklerin etkili bir şekilde yönetilebilmesini sağlamak amacıyla, literatürde ve sektörde genel kabul görmüş risk yönetim araçlarına yönelik öneriler geliştirilmiştir.
Özet (Çeviri)
The public-private partnership (PPP) model, which has emerged as a prominent approach among project delivery methods in the construction of large-scale infrastructure projects since the 1980s, has been adopted by the Turkish Ministry of Health to realize the integrated health campus (IHC) projects nationwide since 2009. The requirement that PPP projects possess an objective, reliable, and applicable risk assessment process is considered one of the most critical success criteria during the project's life cycle. In line with this objective, a comprehensive risk assessment is carried out in the case of eighteen IHCs implemented by the MoH, encompassing the steps of identification, evaluation, allocation, and management of risks. For this purpose, a structured questionnaire survey was conducted among sixty professionals involved in these PPP projects, and it was used to reveal the probability of occurrence and magnitude of impact of the thirty-six risk factors – regarding both the construction and operation periods of the investments – identified through a comprehensive literature review. The stakeholders responsible for addressing the adverse consequences of such risks are determined through an in-depth review of a typical project agreement and the relevant legislation governing the implementation of PPP healthcare investments in Turkey. Eventually, effective risk mitigation strategies widely acknowledged in the literature and the industry have been proposed to manage systematic risks of macroeconomic origin – i.e., construction and operation period currency risk, financing risk, variation order risk – which have been identified as posing a high level of threat for the timely and cost-effective implementation of IHC projects.
Benzer Tezler
- Risk identification and assessment for ppp integrated health campus projects in Turkey a case study: Kayseri integrated health campus
Türkiye'deki kamu özel ortaklığı sağlık kampüsü proje risklerinin belirlenmesi ve değerlendirilmesi örnek olay: Kayseri Entegre Sağlık Kampüsü
ÇAĞATAY ARSLAN
Yüksek Lisans
İngilizce
2019
İnşaat MühendisliğiOrta Doğu Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
PROF. DR. MUSTAFA TALAT BİRGÖNÜL
DR. ÖĞR. ÜYESİ ONUR BEHZAT TOKDEMİR
- ÇORUM İLİ ÇEVRESEL RADYOAKTİVİTE ANALİZİ VE DOZİMETRİK YÖNDEN DEĞERLENDİRİLMESİ
ENVIRONMENTAL RADIOACTIVITY ANALYSIS AND DOSIMETRIC EVALUATION OF ÇORUM PROVINCE
İLAYDA YILMAZKAYA
Yüksek Lisans
Türkçe
2025
Nükleer Mühendislikİstanbul Teknik ÜniversitesiNükleer Araştırmalar Ana Bilim Dalı
PROF. DR. NESRİN ALTINSOY
DR. VOLKAN ŞİMŞEK
- İş sağlığı ve güvenliği risk değerlendirme metodlarından Fine Kinney ve Matris metodlarının entegre biçimde bir boya fabrikasına uygulanması
Integrated application of the Finsney and Matrix methods of occupational health and safety risk assessment to a paint factory
HATİCE BABİER TEMEL
Yüksek Lisans
Türkçe
2025
Sağlık YönetimiVan Yüzüncü Yıl Üniversitesiİş Sağlığı ve Güvenliği Ana Bilim Dalı
PROF. DR. ESVET AKBAŞ
- İş sağlığı ve güvenliği risk değerlendirme metodlarından kontrol listesi ve matris metodlarının entegre biçimde bir inşaat şantiyesinde uygulanması
Implementation of integrated occupational health and safety risk assessment methods, checklist and matrix methods, to a construction site
MEHMET BURAK SAAT
Yüksek Lisans
Türkçe
2009
Endüstri ve Endüstri MühendisliğiGazi ÜniversitesiKazaların Çevresel ve Teknik Araştırması Ana Bilim Dalı (disiplinlerarası)
PROF. DR. HADİ GÖKÇEN
- Entegre et tesislerinde fine-kinney metodu ile iş sağlığı ve güvenliği kapsamında bir risk değerlendirmesi
A risk assesment within the scope of occupational health and safety with fine-kinney method in an integrated meat facility
AHMET GÖKOĞLU
Yüksek Lisans
Türkçe
2021
Çalışma Ekonomisi ve Endüstri İlişkileriİstanbul Rumeli Üniversitesiİş Sağlığı ve Güvenliği Ana Bilim Dalı
ÖĞR. GÖR. ALİ RIZA GÜNER