Geri Dön

Denizli Kızıldere jeotermal enerji sahasındaki kuyularda mekanik temizleme ve kuyu performansına etkileri

Mechanical cleaning of Denizli Kızıldere geothermal wells and its effect on well performance

  1. Tez No: 136774
  2. Yazar: HÜSEYİN DÜNYA
  3. Danışmanlar: YRD. DOÇ. DR. HAYATİ YENİCE
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2003
  8. Dil: Türkçe
  9. Üniversite: Dokuz Eylül Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Maden İşletme Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

ÖZET Denizli-Kızıldere Jeotennal sahasında MTA(Maden Tetkik Arama) Enstitüsü tarafından 1960'h yıllarda çalışmalara başlanmış ve araştırma sondajları neticesinde elektrik üretimine uygun bir saha olduğu görülmüştür. Günümüze kadar MTA tarafından sahada 108 gradyan ve 23 üretim kuyusu yapılmıştır. Bu üretim kuyularından 9 tanesi halen elektrik santraline buhar sağlamaktadır. 1984 yılında TEK(Türkiye Elektrik Kurumu) tarafından kurulu gücü 20,4 MWe Olan bir jeotennal elektrik santrali hizmete açılmış ve Halen elektrik üretimine devam etmektedir. Sahada üretilen akışkan miktarı ortalama 7,5-8 milyon ton/yıl ve elektrik enerjisi 80-90milyon KWe civarlarındadır. Üretim kuyularında zamanla karbonat kabuklaşması oluşarak kuyu çaplarım daraltmakta ve üretimleri doğal olarak düşürmektedir. Günümüze kadar sahadaki kuyularda oluşan karbonat kabuklaşmalarını temizlemek için birkaç yöntem denenmiştir. Günümüzde bu kabuklaşmalar, yılda bir kez sondajla mekanik olarak kuyu üretim halinde iken temizlenmekte ve kuyu üretimlerinin eski orijinal değerlerine ulaşması sağlanmaktadır. Bu çalışmada, Kızıldere Jeotennal Sahasındaki kuyuların sondajla mekanik temizliği ve üretimdeki performans değişimi irdelenmiştir. Sonuç olarak, sondajla mekanik temizliğin başansına rağmen ; inhibitor kullanılması durumunda üretim performansının olumlu artacağı kanısı ortaya çıkmıştır.

Özet (Çeviri)

ABSTRACT The studies in Denizli-Kızıldere geothermal field was started by MTA in the 1960's and it was concluded that the field was suitable for electricity generation. Totally 108 gradients and 23 production wells have been made by MTA up to date. Nine of these production wells still supply vapor to the power plant. A power plant, whose installed power is 20.4 MWe, has been put into service in 1984 by TEK and still operating. The fluid quantity produced at the field is averagely 7.5 -8 mio tons/year and electrical energy is 80-90 mio kWe per annum. Carbonate scaling occurs within the production wells in time making the diameter narrow and naturally decreasing the yield. Several methods have been applied up to now to prevent scaling in these wells. In our day, these scalings are mechanically cleansed once a year and the well production returns to its original values. In this study, mechanical cleaning of the wells by drilling and the performance change due to this change have been investigated. As a result, despite the success of mechanical cleaning by drilling; the concept, in which the production performance will rise more with the use of inhibitors, has become obvious.

Benzer Tezler

  1. Kızıldere jeotermal rezervuarının teknik ve ekonomik değerlendirilmesi

    Technical and economical evaluation of Kızıldere geothermal field

    UMRAN SERPEN

    Doktora

    Türkçe

    Türkçe

    2000

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  2. Ege bölgesi keçi liflerinin bazı önemli fiziksel, kimyasal özellikleri ve değerlendirme imkanları

    Başlık çevirisi yok

    NİLÜFER ERDEM

    Doktora

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  3. Maymun Dağı ve Beşparmak Dağlarının (Denizli - Afyon) florası

    A study of the flora of Maymun and Beşparmak Mountains (Denizli - Afyon)

    ZEKİ AYTAÇ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Yükleniyor...

  4. Buldun'da kasnak işinin bugünkü durumu

    Başlık çevirisi yok

    HÜRRİYE TURGUT

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Yükleniyor...