Stokastik görev zamanlı dengelenmiş U tipi montaj hatlarının etkinliği'nin arttırılması için simülasyon modelleri

Simulation models for increasing the efficiency of balanced U-shaped assembly lines with stochastic task times

  1. Tez No: 153733
  2. Yazar: LEVKA TANACI
  3. Danışmanlar: PROF.DR. HADİ GÖKÇEN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: U Tipi Montaj Hatları, Stokastik Görev Süreleri, Simülasyon, Hat Etkinliği, Maliyet Bazlı Yaklaşım, U-Shaped Assembly Lines, Stochastic Task Times, Simulation, Line Effıciency, Cost-Based Approach
  7. Yıl: 2004
  8. Dil: Türkçe
  9. Üniversite: Selçuk Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 135

Özet

i ÖZET Yüksek Lisans Tezi STOKASTİK GÖREV ZAMANLI DENGELENMİŞ U TİPİ MONTAJ HATLARININ ETKİNLİĞİNİN ARTTIRILMASI İÇİN SİMÜLASYON MODELLERİ Levka TANACI Selçuk Üniversitesi Fen Bilimleri Enstitüsü Endüstri Mühendisliği Anabilim Dalı Danışman: Prof. Dr. Hadi GÖKÇEN 2004, 126 Sayfa Jüri: Prof. Dr. Hadi GÖKÇEN Prof. Dr. Ahmet PEKER Yrd. Doç. Dr. Orhan ENGİN Tam Zamanında Üretim sisteminin uygulanması için gerekli faktörlerden biri olarak ortaya çıkan U tipi montaj hattı uygulamaları, son dönemlerde giderek yaygınlaşmaktadır. Düz montaj hatlarına alternatif olarak uygulanan U tipi montaj hatları birçok açıdan düz hatlara göre daha iyi ve etkin sonuçlar vermektedir. U tipi montaj hatları ile ilgili ilk çalışma 1994'te yapılmıştır. O tarihten bugüne kadar U tipi montaj hatlarında tek ve karışık modelli, deterministik ve stokastik görev süreleri dikkate alınarak bazı dengeleme yöntemleri geliştirilmiştir. Ancak dengeleme sonrası hattın etkinliğini arttırmaya yönelik bir çalışma henüz yapılmamıştır. Bu çalışmada stokastik görev zamanlı dengelenmiş U tipi montaj hatlarının denge sonrası etkinliğini arttırmaya yönelik iki simüîasyon modeli geliştirilmiştir. Birinci modelde, herhangi bir istasyonda çevrim zamanı aşıldığında, birime ait kalan görevler, öncelik ilişkilerinin izin verdiği ölçüde, mümkün olduğu kadar hattaki istasyonlarda tamamlanmaktadır. Hatta yapılamayan görevler ise bir operatör tarafından yürütülen hat dışı istasyonda tamamlanmaktadır.İkinci modelde, U tipi montaj hattının çıkış tarafındaki istasyonlar arasında bir birim ara stok bulundurulmaktadır. Herhangi bir istasyonda çevrim zamanı aşıldığında, birim tamamlanmak üzere hat dışı istasyona gönderilmektedir. Bu arada, istasyon yeni bir birim üretene kadar takip eden istasyonun bir çevrim zamanı boyunca boş beklemesini önlemek amacıyla, istasyonlar arasındaki stoktan bir birim gönderilmektedir. Hat dışı istasyonda tamamlanan birim ise aynı stok alanına gönderilmektedir. Her iki model, esneklik oranı düşük ve yüksek iki farklı problem için çalıştırılmıştır. Her iki yöntem için birer maliyet modeli geliştirilmiştir. Maliyet modellerine göre, yöntemler analiz edilmiştir.

Özet (Çeviri)

İİİ ABSTRACT MSc Thesis SIMULATION MODELS FORINCREASÎNG THE EFFîCIENCY OF BALANCED U-SHAPED ASSEMBLY LINES WITH STOCHASTIC TASK TIMES Levka TANACI Selçuk University Graduate School of Natural and Applied Sciences Department of Industrial Engineering Supervisor: Prof. Dr. Hadi GÖKÇEN 2004, 126Pages Jury: Prof. Dr. Hadi GÖKÇEN Prof. Dr. Ahmet PEKER Asisi. Prof. Dr. Orhan ENGİN U-shaped assembly line applications which arised as a factor of obligation to Just în Time System has become more popular in recent years. U-shaped assembly lines that is applied as an alternative for serial assembly lines, provide better and more effective results with respect to many aspect. First study about U-shaped assembly lines was made in 1994. Up to date, some balancing procedures for single and mixed-model with determinisîic and stochastic task times in U-shaped assembly lines, have been developed. But any model for increasing the efficiency of balanced U-shaped assembly lines hasn't been developed yet. in this thesis, two simuîation models for increasing the efficîency of balanced U-shaped assembly lines with stochastic task times are developed. in the first model, when cycle time is exceeded in any workstaîion, the remaining tasks of the unit are completed as far as possible in the stations on the line with respect to the precedence relations. The tasks which can't be done on the line are completed on the off-line station which is carried out with öne operatör.iv Second model is based on using öne piece of buffer between the stations in the exit side of U-shaped assembly line. When cycle time is exceeded in any workstation, the unit is taken to the off-line station. At the same time, öne unit is pulled from the buffer storage that is placed between the sations in order to prevent idle waiting of the following sîation along a cycle time until the previous station produces a new unit. The fınished unit on off-line station is added to the same buffer storage. Both models are applied to two different problems öne of which has a low flexibility ratio and the other high. A cost model for both models is developed. According to the cost models, the methodologies are analysed.

Benzer Tezler

  1. Bir montaj hattının yeniden tasarımı ve tavşan kovalama yönteminin uygulaması

    Redesign of an assembly line and application of rabit chasing assembly method

    MEHMET TAYFUN DİKER

    Yüksek Lisans

    Türkçe

    Türkçe

    2015

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    PROF. DR. MEHMET BÜLENT DURMUŞOĞLU

  2. Fake news classification using machine learning and deep learning approaches

    Makine öğrenimi ve derin öğrenme yaklaşımlarını kullanarak sahte haber sınıflandırması

    SAJA ABDULHALEEM MAHMOOD AL-OBAIDI

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolGazi Üniversitesi

    Bilgisayar Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ TUBA ÇAĞLIKANTAR

  3. Stokastik U-tipi montaj hattı dengeleme problemleri için parçacık sürü optimizasyonu

    Particle swarm optimization for stochastic U-type assembly line balancing problems

    ÖZKAN BALİ

    Doktora

    Türkçe

    Türkçe

    2009

    Endüstri ve Endüstri MühendisliğiGazi Üniversitesi

    Endüstri Mühendisliği Bölümü

    PROF. DR. CEVRİYE GENCER

  4. Stokastik paralel montaj hattı dengeleme problemine üst sezgisel yaklaşım

    Hyper heuristic approach to stochastic parallel assembly line balancing problem

    GÖKHAN SEÇME

    Doktora

    İngilizce

    İngilizce

    2014

    Endüstri ve Endüstri MühendisliğiErciyes Üniversitesi

    İşletme Ana Bilim Dalı

    DOÇ. DR. LALE ÖZBAKIR

  5. Assembly line balancing problem with stochastic sequence-dependent setup times

    Stokastik sıra bağımlı hazırlık zamanlı montaj hattı dengeleme problemi

    ZÜLAL DİRİ

    Yüksek Lisans

    İngilizce

    İngilizce

    2015

    Endüstri ve Endüstri MühendisliğiGaziantep Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. KÜRŞAD AĞPAK