Bir üretim atölyesinde darboğaz problemlerinin benzetimle analizi

Analysis by simulation of bottleneck problems in a job shop production system

  1. Tez No: 170953
  2. Yazar: SERPİL ÜSTÜN
  3. Danışmanlar: Y.DOÇ.DR. EMRULLAH DEMİRCİ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Makine Mühendisliği, Mechanical Engineering
  6. Anahtar Kelimeler: Job shop, simulation, investment, machine bottleneck VI
  7. Yıl: 2005
  8. Dil: Türkçe
  9. Üniversite: Karadeniz Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Makine Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 74

Özet

ÖZET Bilgisayar teknolojisi hızla gelişmekte ve etkisini bir çok alanda göstermektedir. Özellikle endüstriyel alanlarda üretimi ve verimi arttırmak amacıyla darboğaz problemleri bilgisayar ortamına aktarılarak çözümler aranmaktadır. Bu amaçla piyasada bir çok benzetim programları mevcuttur. Günümüzde yaygın olarak kullanılan benzetim, karmaşık problemlerin çözümü için uygun bir araç olarak görülmektedir. Benzetim tekniğinin amaçlarından biri yatırım stratejisiyle yöneticiye karar vermede yardımcı olmaktadır. Büyük sistemlerin sorunlarının çözümünde analitik yöntemler zor ve pahalı olmaktadır. Bu durumlarda sistemin bilgisayarda modeli kurulmakta, bu model üzerinde çeşitli stratejiler denenerek yapılacak yeni yatırım stratejisinin atölyenin durumunu nasıl etkileyeceği görülebilmekte ve çözüm önerileri ortaya konulmaktadır. Çalışmamızda, bir fabrikadaki talaşlı imalat atölyesi ele alınarak benzetim modeli kurulmuştur. Sipariş üzerine üretim yapmakta olan bu atölyede yaklaşık 120 tezgah, 50 çeşit iş, 2 forklift, yaklaşık 13 arastok bölgesi, bir montaj atölyesi, bir kalite kontrol laboratuarı, bir bakım onarım atölyesi, bir mamul ve hammadde bölümü, bir ısıl işlem atölyesi ve ambalaj bölümü bulunmaktadır. Kurulan modelle, kapasitenin artırılması için gereken tezgah sayısı gibi yatırım konularında, mevcut darboğazların yanı sıra üretim hattında yapılacak değişikliklerde ve yeni yatırımlar sonucu oluşabilecek darboğazların belirlenmesi gibi konularda karar mekanizmasına destek verecek bilgilerin elde edilmesi amaçlanmıştır. Atölyenin benzetim modeli, SLAM II Benzetim dilinin geliştirilmiş şekli olan AWESIM benzetim dili kullanılarak yapılmıştır. Modelin temel verilerini oluşturan atölye bilgileri, işler (geliş aralıkları, işlem sıralan, işlendikleri tezgah ve tezgah gruplan, işlem süreleri, hazırlık süreleri gibi) ve tezgahlar (tezgah ad ve no lan) ile ilgili bilgilerdir. Veri toplama işlemi üretim hattı üzerinde kısmen geçmişe ait kayıtlardan alınmış, kısmen de atölyede gözlemleyerek gerçekleştirilmiştir. Bu bilgiler esas alınarak benzetim paketinin network modeli oluşturulmuş ve darboğaz oluşumunu önleyecek yatırım stratejileri incelenmiştir. Anahtar Kelime: Atölye tipi üretim, simülasyon, yatırım stratejileri, makina darboğazı

Özet (Çeviri)

SUMMARY Analysis by Simulation of Bottleneck Problems in a Job Shop Production System Development in computer and software technology fields has proved its effect on industrial field. Particularly, bottleneck problems in industrial can be transformed to computer by simulation programs to increase amount of production and productivity. Therefore, there are a lot of simulation programs. Currently, the simulation method is seemed to be suitable solution for complicated and large production line problems because analytical methods are more expensive or difficult than simulation technique for large systems. The most important aim of simulation technique is to help users to test investment strategies for investment decisions. Therefore, the model of system is constructed in computers and all strategies are tested to forecast how new investment strategies effect the job floor. In this study, job floor of a car spare parts manufacturing factory which works as job shop is considered for simulation model. There are 120 workbenches, 50 type jobs, 2 forklifts, 13 interval stock areas, an assembly line, a quality control laboratory, a maintenance shop, a heat treatment job, a product and raw material warehouse, and a packing department. The purpose of this model is to determine numbers of needed machine and to see the bottlenecks which may be constituted after new investment. AWESIM simulation language, improved model of SLAM II, is used to construct simulation model of job floor. Model was constructed by the data collected from job floor. The data, such as job name, job no, batch size, number of batches, route and operation knowledge, machine no, machine name, process time, preparation time, transport time, etc. collected from job floor by observing job floor and taking from entry. The presented case of job floor is investigated by simulation. The bottlenecks are determined and three strategies are tested to cope with bottleneck by model.

Benzer Tezler

  1. Hücresel üretim : Hücrelerin oluşturulmasında kullanılan yöntemlerin analizi ve bir vinç atölyesinde uygulama

    Cellular manufacturing: Analysis of the cell formation methods and an application in crane shop

    BÜLENT BAŞARAN

    Doktora

    Türkçe

    Türkçe

    2005

    İşletmeUludağ Üniversitesi

    İşletme Ana Bilim Dalı

    PROF.DR. FERAY ODMAN ÇELİKÇAPA

  2. Atölye tipi üretimde hata türü-etkileri analizi (HTEA) yönteminin ürün birim maliyetlerine etkisi

    The effect of the type of failure mode-effects analysis (FMEA) on product unit cost in jop shop production

    CEREN ARSLAN KAZAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2021

    Endüstri ve Endüstri MühendisliğiSüleyman Demirel Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. HALİL İBRAHİM KORUCA

  3. A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem

    Yeniden girişli iş atölyesi çizelgeleme problemi için önerilen darboğaz kaydırma sezgisel yöntemi

    GAMZE KILINÇLI

    Yüksek Lisans

    İngilizce

    İngilizce

    2007

    Endüstri ve Endüstri MühendisliğiDokuz Eylül Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    Y.DOÇ.DR. ŞEYDA TOPALOĞLU

  4. Üretim etkinliğinin arttırılmasında simülasyon yaklaşımı ve bir üretim atölyesinde uygulama

    Using simulation method to improve manufacturing efficiency and performing in a workshop

    SEMİH ÇÖREKÇİOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2010

    Endüstri ve Endüstri MühendisliğiGebze Yüksek Teknoloji Enstitüsü

    İşletme Bölümü

    DOÇ. DR. BÜLENT SEZEN

  5. An Optimal order release approach for make to order manufacturing with job anticipation

    Sipariş üzerine üretimde beklenen siparişleri gözeten optimal bir iş salma yöntemi

    CEM VARDAR

    Yüksek Lisans

    İngilizce

    İngilizce

    2001

    Endüstri ve Endüstri MühendisliğiOrta Doğu Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SİNAN KAYALIGİL