Geri Dön

Bir ilaç fabrikasında trijenerasyon sistemi kurulmasının termoekonomik analizi

Thermoeconomic analysis of installing a trigeneration system on a pharmaceutical plant

  1. Tez No: 243701
  2. Yazar: FERHAT HABERDAR
  3. Danışmanlar: YRD. DOÇ. DR. DERYA B. TÜMER ÖZKAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Enerji, Kimya Mühendisliği, Makine Mühendisliği, Energy, Chemical Engineering, Mechanical Engineering
  6. Anahtar Kelimeler: Trijenerasyon, termoekonomik analiz, enerji verimliliği, ekserji, Ekserjoekonomik analiz, Thermoeconomic analysis, trigeneration, energy efficiency, exergy, Exergoeconomical analysis
  7. Yıl: 2009
  8. Dil: Türkçe
  9. Üniversite: Yıldız Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Makine Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Bir sistemi mühendislik yaklaşımıyla irdelediğimizde, sadece termodinamik açıdan incelemek ve bu inceleme ışığında sistemleri birbirleriyle karşılaştırmak pek doğru olmaz. Termodinamik incelemede, maliyetler dikkate alınmaz. Sistemin performansını termodinamik açıdan iyileştirilirken, sistemin yatırım maliyeti çok artabilir. Aynı mantıkla sadece yatırım maliyeti göz önünde bulundurulursa, sistemin performansı düşer ve bu da sistemin işletme maliyetinin artmasına sebep olur. Bu nedenle termodinamik analiz ile maliyet etkisi birlikte düşünülerek optimum tasarım parametreleri belirlenmelidir. Bu tarife en uygun yöntemlerden biri de bu çalışmada uygulanan termoekonomik analizdir.Bu çalışmada ısıtma ihtiyacı buhar kazanından, soğutma ihtiyacı mekanik soğutma sisteminden, elektrik ihtiyacı şebekeden sağlanan, ilaç üretimi yapan bir tesiste, enerji tasarrufu yapmak amacıyla buhar kazanı, buhar türbini ve absorpsiyonlu soğutma sisteminden oluşan trijenerasyon sistemi tasarımı yapılmıştır.İlk aşamada trijenerasyon sistemi yatırımının fizibilitesi incelenmiştir. Fizibilite değerlendirmesi iki farklı durum için yapılmıştır. Birinci durum olarak sistemin ana ekipmanlarından olan buhar kazanı ve absorpsiyonlu soğutma sisteminin yedekli olarak kurularak, bir arıza halinde tesisin çalışmaya devam etmesini sağlayacak şekilde yapılacak yatırım fizibilitesi değerlendirilmiştir. İkinci durum olarak ise aynı ekipmanların yedeksiz kurularak bir arıza halinde tesis üretim kapasitesi yarıya düşürülecek şekilde yatırım fizibilitesi değerlendirilmiştir.İkinci aşamada ise parametreleri belirlenmiş olan trijenerasyon sisteminin termoekonomik analizi yapılarak akımlarda ekserji maliyetleri, ekserji kaybı maliyetleri, ekserji kaybı oranları ve ekipmanların eksergoekonomik faktör parametreleri bulunmuştur. Bu parametreler doğrultusunda sistem ekipmanları ve bu ekipmanlarda yapılabilecek iyileştirmeler konusunda değerlendirmeler yapılmıştır.

Özet (Çeviri)

When a system is studied from an engineering point of view, it is not enough to analyze the system for one thermodynamic parameter and to compare the system according to this analysis. In a thermodynamic examination, costs are not considered. While the thermodynamic performance of the system is getting better the investment costs can increase. On the other hand, if only investmen costs are considered, the system performance can decrease and it causes a higher operating cost. So, it is better to take notice both of thermodynamic analyse and cost effects, and determine the optimum design parameters. The most suitable method for this kind of optimization is the ?thermoeconomic analysis? which is used in this study.In this study, a trigeneration system which composed of a steam generator, a steam turbine and an absorption cooling system is designed for a pharmacy plant supplies its electricity from the grid, its cooling duty a mechanical cooling unit and its heating duty a steam generator.Firstly, the investment feasibility of the trigeneration system is analized. The feasibility study is made for two different cases. In the first case the investment feasibility is examined when a back up steam generator and an absorption cooling system is used to maintain the process when a problem occurs. In the second case the investment feasibility is examined when back up equipment is not used. In this situation, the production capacity of the plant decreases to half.Secondly, the thermodynamic calculations are done for the trigeneration system. The exergy costs, exergy lost costs, exergy lost rates and the exergoeconomic factor of the equipment are determined. According to these parameters, system equipment and the possible revisions which can be made on these pieces of equipment are examined.

Benzer Tezler

  1. Ovulasyon indüksiyonu tedavisinde folliküler gelişimin ultrasonografik takibi

    Başlık çevirisi yok

    MERİH BAYRAM

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    Kadın Hastalıkları ve Doğum Ana Bilim Dalı

    Yükleniyor...

  2. Bir ilaç fabrikasında personel gereksinmesinin belirmesi seçilmesi ve elde tutulmasına yönelik bir uygulama çalışması

    Başlık çevirisi yok

    EMİNE BOZBAĞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1989

    İstanbul Üniversitesi

    Çalışma Ekonomisi ve Endüstri İlişkileri Ana Bilim Dalı

    Yükleniyor...

  3. İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar

    Başlık çevirisi yok

    BAHAR TÜRKYILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    Yükleniyor...

  4. Atherosklerotik kalp hastalıklarında risk faktörleri

    Risk factors in the coronary artery disease

    MURAT SUHER

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    İç Hastalıkları Ana Bilim Dalı

    Yükleniyor...

  5. Diesel motorları yakıt püskürtme sistemlerinin dinamik simülasyonu

    Başlık çevirisi yok

    İRFAN KARAGÖZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...