Geri Dön

Tersane verimliliğinin iyileştirilmesi: Gemi inşaatında modern endüstri mühendisliği ve belirsizlik süreçlerinin uygulanması

Improvement of shipyard efficiency: Application of modern industrial engineering and delay processes in shipbuilding

  1. Tez No: 293700
  2. Yazar: MURAT ÖZKÖK
  3. Danışmanlar: PROF. DR. METİN TAYLAN, DOÇ. DR. İSMAİL H. HELVACIOĞLU
  4. Tez Türü: Doktora
  5. Konular: Gemi Mühendisliği, Marine Engineering
  6. Anahtar Kelimeler: Benzetim, Darboğaz, Gemi inşaat sektörü, Gemi inşaatı endüstrisi, Süreç iyileştirme, İyileştirme, İş akışı, İş istasyonları, Simulation, Bottleneck, Shipbuilding sector, Shipbuilding industry, Process improvement, Improvement, Workflow, Work stations
  7. Yıl: 2010
  8. Dil: Türkçe
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Gemi İnşaatı ve Gemi Makineleri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Günümüzde, rekabet ortamının oldukça zor olması, üretim yapan firmaların özellikle de tersanelerin üretim süreçlerini yeniden gözden geçirmesini ve belirli bir sürede daha fazla ürünü üretmesini zorunlu kılmıştır. Tersanelerin, özellikle de uzak doğulu rakipleriyle başa çıkmasının yolu bundan geçmektedir. Üretim süreçleri detaylı bir şekilde incelenip, iş istasyonlarının iş akış şemaları belirlenerek, iyileştirilmesi gereken süreçler belirlenmeli ve verimlilik artırılmalıdır. Böylece, daha fazla üretim hedeflenebilir ve bu yapıldığında, tersaneler önemli bir rekabet avantajı elde edebilir. Bu çalışmada, belirli bir blok ele alınarak bu bloğun üretim süreçlerinin oluşturulan bir modelle iyileştirilmesi ve çıktının artırılması amaçlanmıştır. Oluşturulan bu iyileştirme süreci modeli, sürekli iyileştirme (Kaizen), darboğaz teorisi ve Arena simülasyon gibi süreçleri içermektedir. İyileştirme süreci modelinde, ele alınan bloğun her iş istasyonu için detaylı bir şekilde üretim süreçleri belirlenmiştir. Elde edilen üretim süreçleri Arena simülasyon programında modellenerek sistemin belirli bir sürede ürettiği blok sayısı ve darboğaz istasyonları belirlenmiştir. Daha sonra, darboğaza neden olan istasyon baz alınarak belirlenen süreçler üzerinde çeşitli değişiklikler yapılmış ve yapılan bu değişiklikler her defasında bir önceki duruma yansıtılarak, yeni üretim süreçleri elde edilmiştir. Bu çevrim tekrarlanarak sistemin belirli bir sürede ürettiği blok sayısı artırılmıştır. Bunun yanısıra, arıza açısından kritik istasyonlar da belirlenerek, başlangıçta belirlenen üretim hedeflerine ulaşabilmek için planlamacıların önceden almaları gereken tedbirler araştırılmıştır. Elde edilen sonuçlar, endüstrinin kullanımına sunulacak şekilde değerlendirilmiştir.

Özet (Çeviri)

The competition in production industry is becoming harder in recent years. The shipyards just like the other industrial companies should investigate their own production processes and increase the system throughput in order to cope with the far eastern competitors. By determining the work flows of all the work stations, they should identify the processes to be improved and increase the efficiency. So, the shipyards may target more products. By doing this, they may also have an important competitive advantage. In this study, by considering a specific double bottom block, it?s aimed to increase the throughput and improve the production processes with a new developed model. The model consists of the continuous improvement (Kaizen), the bottleneck theory and process simulation. In the improvement process, the detail work flows of the all the work stations were identified. By modeling the production processes in Arena simulation program, the quantity of the block manufactured in a given period and the bottleneck stations were determined. Then, the changes and improvements were carried out in accordance to the bottleneck stations. Whole changes were applied on the earlier cases and as a result of this, the new cases were obtained. By repeating this cycle, the quantity of the block manufactured in a given period increased. Moreover, the critical work stations in accordance to the delay were determined. So, the focus in here is that the production planners have some data of critical stations in delay to take precautions in advance. The obtained results were evaluated and proposed to the industry applications.

Benzer Tezler

  1. Tersane yerleşimi optimizasyonu ve simülasyonu

    Shipyard layout optimization and simulation

    SALİM TAMER

    Doktora

    Türkçe

    Türkçe

    2023

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Gemi İnşaatı ve Gemi Makineleri Mühendisliği Ana Bilim Dalı

    PROF. DR. BARIŞ BARLAS

  2. Contribution a la recherche d'un cadre juridique pour un droit international de laconcurrence plus efficace

    Daha etkin bir uluslararası rekabet için hukuki çerçeve arayışı

    ALİ CENK KESKİN

    Doktora

    Fransızca

    Fransızca

    2009

    HukukGalatasaray Üniversitesi

    Kamu Hukuku Ana Bilim Dalı

    PROF. DR. JEAN MARC SOREL

    PROF. DR. HALİL ERCÜMENT ERDEM

  3. Modeling of a closed-loop lubrication system for a turbofan engine and active control of bearing temperatures

    Turbofan motorda kapalı döngü yağlama sisteminin modellenmesi ve rulman sıcaklıklarının aktif kontrolü

    YASİN İNCE

    Yüksek Lisans

    İngilizce

    İngilizce

    2026

    Havacılık ve Uzay Mühendisliğiİstanbul Teknik Üniversitesi

    Enerji Bilimi ve Teknolojileri Ana Bilim Dalı

    PROF. DR. İLHAN KOCAARSLAN

  4. Improving the thermal conductivity of fiber-reinforced concrete panels for exterior facades with phase change materials

    Diş cepheler için elyaf takviyeli beton panellerin ısı ı̇letkenliğinin faz değiştiren malzemelerle ı̇yileştirilmesi

    YALDA SAFARALIPOUR

    Doktora

    İngilizce

    İngilizce

    2023

    Enerjiİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    PROF. DR. MUSTAFA ERKAN KARAGÜLER

  5. Sürdürülebilir çok amaçlı atölye tipi çizelgeleme problemi için çözüm yaklaşımları

    Solution approaches for multi-objective sustainable job shop scheduling problem

    SADDAM HOCINE BOUZEGAG

    Doktora

    Türkçe

    Türkçe

    2025

    Endüstri ve Endüstri MühendisliğiKonya Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    PROF. DR. SAADETTİN ERHAN KESEN