Paralel makinelerde iş yüküne yönelik üretim kontrolü ilkesi altında ürün tasarımı ile iş çizelgelemesinin bütünleştirilmesi
Integrating product design and job scheduling on parallel machines under the principle of load oriented manufacturing control
- Tez No: 293710
- Danışmanlar: PROF. DR. M. BÜLENT DURMUŞOĞLU, YRD. DOÇ. DR. MURAT BASKAK
- Tez Türü: Doktora
- Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
- Anahtar Kelimeler: Paralel makineler, Çizelgeleme, Ürün tasarımı, Parallel machines, Scheduling, Product design
- Yıl: 2010
- Dil: Türkçe
- Üniversite: İstanbul Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Müşterinin gerçekten istediği ürünleri, tam da istediği anda tasarlayabilme, çizelgeleme ve imal edebilme becerisini kazanmak, ürünün istenmeden itilmesi yerine, müşteri istediğinde ürünün üreticiden çekilmesi ile hızlanır. Bu şekilde bir anlayış, müşteri odaklılığın üretime yansımasıdır. Çekme sistemleri, küçük partili üretimine imkan veren düşük hazırlık süreleri ortamında uygulandığında üretim temin süresinde önemli kazançlar sağlayacaktır. İlgili yayınlar incelendiğinde, ürün tasarımı ile iş çizelgelemesinde ürün tasarım özelliklerini dikkate alan ve fazla üretim israfını önlemeye yönelik bilimsel temellere dayalı bir çalışma bulunmamaktadır. Yapılan tez çalışmasında paralel makinalarda iş çizelgelemesinde ürün tasarımından faydalanan ve Yüke Yönelik İş Gönderme prensibini taşıyan bütünsel bir yöntem geliştirilmiştir. Geliştirilen meodoloji gerçek bir kablo takımı üretim sisteminde uygulanmış ve hazırlık süreleri ve fazla üretim miktarlarının azaltılması açısından etkinlik sağlamıştır.
Özet (Çeviri)
To gain the ability of designing, scheduling, and manufacturing the products, which customers exactly demand, in time provides competitive advantage to companies. The above mentioned ability is provided by implementing pull system between the costumer and supplier as well as manufacturing processes instead of push system. Such an approach is the reflection of being costumer oriented in production. In addition, setup time constitutes an important part of production lead time. Pull systems lead to significant achievement in terms of lead time when applied in the environment of short setup times which allows production in small batches. When the relevant literature is reviewed, it is seen that there is not any scientific guiding work which not only considers product design in job scheduling, but also aims to prevent overproduction waste. In this thesis, an integrated methodology that uses product design specifications for job scheduling under the principle of Load Oriented Order Management is developed. The proposed methodology is applied in a real life wire harness production system and has provided effectiveness in terms of decreasing sequence dependent setup times and overproduction wastes.
Benzer Tezler
- İzmir'de Mustafa Kemal Bulvarı'nın peyzaj mimarlığı açısından etüdü ve peyzaj projesi
Başlık çevirisi yok
ENGİN ALPARSLAN
- Çocuklarda akut stres hiperglisemisinde hormonal değişikliklerin ve kısa süreli prognozun incelenmesi
Başlık çevirisi yok
AYGÜN DİNDAR
Tıpta Uzmanlık
Türkçe
1987
İstanbul ÜniversitesiÇocuk Sağlığı ve Hastalıkları Hemşireliği Ana Bilim Dalı
Yükleniyor...
- Değişik derim zamanı ve önsoğutmanın Bursa siyahı incir çeşidinin meyve kalitesi ve pazarlama süresi üzerine etkileri
Effects of haruest time and precooling on fruit quality and shelf-life of the fig variety“Bursa siyahı”
FÜSUN GÜRSEL ÇELİKEL
- Küçük Yamanlar tepesi örneğinde kent yakın çevresinde rekreasyon alanı düzenleme projesi
Başlık çevirisi yok
NİHAN BULGUN