Geri Dön

Uluslararası inşaat projelerinde finansman temin eden kuruluşların ihale süreçleri

The tendering procedures of multilateral banks and organizations who finance international construction projects

  1. Tez No: 295438
  2. Yazar: HANDE ÖZÇİN KIRANT
  3. Danışmanlar: YRD. DOÇ. DR. HAKAN YAMAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Mimarlık, İnşaat Mühendisliği, Architecture, Civil Engineering
  6. Anahtar Kelimeler: Uluslararası inşaat projeleri, Proje finansmanı, İnşaat proje döngüsü, İhale prosedürleri, Dünya Bankası, Avrupa Birliği, Japon Uluslararası İşbirliği Bankası, KİK, FIDIC, Uluslararası kredili ihale, Uluslar arası rekabetçi ihale, International construction projects, Project financing, Project Cycle, Tender procedures, The World Bank, The European Union, Japan Bank for International Cooperation, KİK, FIDIC, International tender for foreign-financed projects, International competitive bidding
  7. Yıl: 2011
  8. Dil: Türkçe
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Mimarlık Ana Bilim Dalı
  12. Bilim Dalı: Proje ve Yapım Yönetimi Bilim Dalı
  13. Sayfa Sayısı: 121

Özet

Tez çalışmasında inşaat projeleri finansmanı konusu, başta FIDIC Pembe Kitap'ta isimleri geçen finansman kurumlar tanıtılmakta ve finansman sağlayan kurumların finanse ettikleri inşaat projelerinde öngördükleri uluslararası ihale prosedürleri incelenerek, aralarındaki fark ve benzerlikleri ortaya konulmaktadır. , Dünya Bankası ve Avrupa Birliği inşaat projesi döngüleri ve inşaat ihale prosedürleri, ihale kılavuzları ve standart ihale belgelerine dayanılarak incelenmiş, Türkiye'de dış finansmanlı uluslararası inşaat projelerinin ihalesinde hangi mevzuatın uygulandığı, Kamu İhale Kurumu açısından bu tür ihalelerin nasıl ele alındığı incelenmiştir. Bu bölümde aynı zamanda, incelenen uluslararası inşaat ihale prosedürlerine bir örnek vermek amacıyla Japon Uluslararası İşbirliği Bankası (JBIC) tarafından bir bölümü finanse edilen ve JBIC ihale kılavuzuna göre ihale edilen örnek bir Uluslararası Havaalanı Geliştirme Projesi ihale süreci anlatılmıştır. İncelenen finansman kurumların ihale prosedürleri hem kendi aralarında hem de KİK açık ihale usulü ile karşılaştırılmış, aradaki fark ve benzerlikler ortaya konulmuştur. Yapılan karşılaştırma i baz alınarak KİK açık ihale mevzuatında hangi değişikliklere gidilebileceği ve Türkiye'de uluslararası kredili ihale mevzuatı oluşturulabileceği sonucuna varılmıştır.

Özet (Çeviri)

In the thesis study financing of the construction projects and financial organizations are introduced especially the organizations in FIDIC MDB Harmonized Book and the tendering procedures of those organizations are examined , their similarities and differences are explained. The project cycles and tendering procedures of the World Bank and EU based their procurement manuals and standard bidding documents are handled and which tendering procedure is applied in foreign-funded projects tendering in Turkey and how it is handled in KİK are examined. Also an international airport development project?s tendering procedure which is half -financed by JBIC and tendered according to JBIC tendering procedures is examined in order to set an example of foreign funded construction projects tendering procedure. The Project cycles and tendering procedures of those financing organizations and KİK are compared and the similarities and differences between of them are explained. Also based on the comparison it is indicated that in KİK legislation what changes should be made and an international tender process should be created for foreign-financed construction projects in Turkey.

Benzer Tezler

  1. Assessment of urbanization history of Addis Ababa city, Ethiopia

    Addıs Ababa cıty, Ethıopıa'nın kentleşme tarihinin değerlendirilmesi

    ABDURAHMAN HUSSEN YIMER

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    Şehircilik ve Bölge PlanlamaMersin Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    DOÇ. DR. ALİ CENAP YOLOĞLU

  2. Altyapı projelerinde istanbul tahkim merkezi'nin sektörel algı ve faydasının değerlendirilmesi

    Assesment of istanbul arbitration centre by its potential and advantages on infrastructure projects

    SEDA KARTAL SOYSAL

    Yüksek Lisans

    Türkçe

    Türkçe

    2018

    Ulaşımİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ PELİN ALPKÖKİN

  3. Analysis of consultant and employer risks in traditional design and BIM projects

    Geleneksel tasarım ve BIM projelerinde müşavir ve işverenin risklerinin değerlendirilmesi

    DENİZ ARDA UĞUR

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. DENİZ ARTAN

  4. Public private partnership and public private partnership project finance modelling

    Kamu özel ortaklığı ve kamu özel ortaklığı proje finansman modeli

    SELEN İDE

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    İşletmeÇankaya Üniversitesi

    Uluslararası Ticaret Ve Finansman Ana Bilim Dalı

    DOÇ. DR. AYTAÇ GÖKMEN

  5. Dünya Bankası finansmanlı inşaat projelerinde uygulanan ihale prosedürlerinin incelenmesi

    The analysis of the bidding procedures at the construction projects which are financed by the World Bank

    DERYA KUTLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2005

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    Y.DOÇ.DR. ELÇİN TAŞ