Dispute settlement arbitration under the FIDIC red book comparison of the United Kingdom and Turkey
Başlık çevirisi mevcut değil.
- Tez No: 403193
- Danışmanlar: Dr. STEPHEN F. COPP
- Tez Türü: Yüksek Lisans
- Konular: Hukuk, Uluslararası İlişkiler, Law, International Relations
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2016
- Dil: İngilizce
- Üniversite: Bournemouth University
- Enstitü: Yurtdışı Enstitü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 99
Özet
Özet yok.
Özet (Çeviri)
This independent legal research aims to analyse the period of formation, development and change of the United Kingdom and Turkish legal materials throughout the analysis, respective acts of legislations. At the end of this paper focuses and evaluates challenges of the FIDIC red book dispute resolution due to popularity is increasing day by day. The construction industry is one of the most important sector of economy. It can be said that the construction industry is different from the other industries in term of production organisation and contract with various projects. As the construction works various activities and complex structures with different foreign professional group work together. However well prepared contract may not include the whole possibilities especially negative conditions that could damage the project while building. In this step dispute may arise between the project partners. Unless solved quickly, disputes could increase and affect the whole project. Dispute resolution techniques in construction contract can be divide into two groups as formal dispute resolution techniques and alternative dispute resolution techniques. In the scope of this thesis, for litigation and mainly arbitration and for alternative dispute resolution techniques negotiation mediation and dispute review boards are mentioned. However, in a contract alternative dispute resolution techniques the decision taken by formal resolution techniques are binding upon the project participants. Dispute resolutions main aim is solving the problem however alternative dispute resolution techniques solve faster and more economically than formal techniques, but in this thesis focuses on arbitration awards which means arbitrators decisions are binding or not, valid or void. Due to complexity structure of the international commercial law and the trading relations standard contracts become a guide. FIDIC is a standard contract that uses frequently among the construction industry.
Benzer Tezler
- Claim management and dispute resolution under FIDIC contracts 2017 edition
FIDIC 2017 sözleşmelerinde hak talebi yönetimi ve uyuşmazlık çözümü
GÖKHAN ÇOBAN
Yüksek Lisans
İngilizce
2020
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. DENİZ ARTAN
- FIDIC'in hukukî yapısı ve FIDIC bünyesinde öngörülen alternatif uyuşmazlık çözüm yolları
Legal structure of, and alternative dispute resolution methods under FIDIC
HASAN HÜSEYİN BÜYÜKÇELİK
- İnşaat sektöründe hak talebi yönetimi
Construction claims
BAHRİ GÜROL ÇELEN
Yüksek Lisans
Türkçe
2002
İnşaat Mühendisliğiİstanbul Teknik ÜniversitesiYapı İşletmesi Ana Bilim Dalı
YRD. DOÇ. DR. MEHMET UĞUR MÜNGEN
- Ulaştırma altyapı projelerinin finansmanı
Başlık çevirisi yok
ŞEBNEM DOĞRU
Yüksek Lisans
Türkçe
1997
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
PROF. DR. GÜNGÖR EREN
- Protection of intellectual property rights under investment arbitration
Fikri mülkiyet haklarının yatırım tahkimi kapsamında korunması
SEDA KARAMAN
Yüksek Lisans
İngilizce
2019
HukukKoç ÜniversitesiHukuk Ana Bilim Dalı
YRD. DOÇ. DR. MEHMET POLAT KALAFATOĞLU