3.Boğaz Köprüsü ve Kuzey Marmara Otoyolu projesinde yapılan patlatmalı kazılardan kaynaklanan titreşimlerin ölçülmesi ve çevresel etkilerinin değerlendirilmesi
Analysis of environmental effects and vibration induced by cautious blasting during the excavation of 3rd Bosphorus Bridge and Northern Marmara Motorway
- Tez No: 413487
- Danışmanlar: PROF. DR. ALİ KAHRİMAN
- Tez Türü: Yüksek Lisans
- Konular: Jeoloji Mühendisliği, Maden Mühendisliği ve Madencilik, İnşaat Mühendisliği, Geological Engineering, Mining Engineering and Mining, Civil Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2015
- Dil: Türkçe
- Üniversite: Okan Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 188
Özet
Metropol şehirlerin gelişmesiyle birlikte artan nüfus ve bunun bir sonucu olan ulaşım ve trafik yoğunluğu çözülmeyi bekleyen öncelikli sorunların başında gelir. Otoyollar, köprüler, metro ağları bu sorunun en büyük çözümü olarak görülmektedir. Ana karaları birbirine bağlayarak insanların ulaşımını sağlayan en önemli sanat yapısı köprülerdir. İstanbul'un ulaşım ve trafik sorununa çözüm sağlamak için yeni bir köprü ve bu köprüye bağlanan bir otoyolun yapımına 2013 tarihinde başlanılmıştır.“3.BOĞAZ KÖPRÜSÜ VE KUZEY MARMARA OTOYOLU PROJESİ”İstanbul'un her iki yakasındaki trafik ve ulaşım sorununa çözüm sağlayacak bir mühendislik ve tasarım projesidir. 3.Boğaz Köprüsü ; 59 m genişliği ile üzerinden raylı sistem geçen Dünyanın en geniş asma köprüsü ünvanını almıştır. 3'ncü Boğaz Köprüsü; Avrupa yakasındaki Garipçe Köyü'nü Anadolu yakasındaki Poyraz Köy'e bağlamaktadır. Kuzey Marmara Otoyolu ise Odayeri-Paşaköy kesimini 3.Boğaz Köprüsü vasıtasıyla birbirine bağlamaktadır. Ayrıca bu otoyol içinde; Türkiye'nin ve Avrupa'nın en geniş 4 şeritli Riva ve Çamlık Tünelleri yer almaktadır. Bu tez kapsamında söz konusu projenin inşası esnasında gerçekleştirilen patlatmalı kazılar incelenmiş, patlamalar esnasında oluşan yer sarsıntıları değerlendirilerek çevredeki yer alan yerleşim birimleri ve yapılara olan etkileri değerlendirilmiştir. 3.Boğaz Köprüsü'nün ayak temelleri(şaftları),köprü halatlarının mesnet alacağı Ankraj Bloğu ;Riva Tüneli ve otoyol yarma kazılarında patlatmalı kazı yapılmıştır. bu süreçte 96 adet patlatma yapılmış ve farklı titreşim ölçer cihazlarla 288 adet titreşim kaydı elde edilmiştir. Gecikme başına kullanılan patlayıcı madde miktarlarına bağlı olarak oluşan ölçekli mesafe (SD) ile titreşim kayıtları ilişkilendirilerek çalışma yapılan bölgenin jeolojine özgü olan arazi iletim katsayısı (K) ve jeolojik katsayına (β) ulaşılmıştır. Çalışmada, konuyla ilgili genel bilgiler araştırılarak geniş kapsamlı literatür taraması yapılmıştır. Delme patlatmanın önemi, patlatma ile parçalanma mekanizması, basamak patlatmaları, şaft patlatmaları ve patlatmadan kaynaklı çevresel sorunlar derlenerek 2. bölümde sunulmuştur. Bölüm 3 te kullanılan malzeme ve yöntemler açıklanmıştır. Çalışma yapılan bölge ile ilgili bilgiler, 3.Boğaz Köprüsü ayak temelleri , ankraj bloğu, portal yapıları, yarma kazıları için uygulanan patlatma modelleri hakkında bilgiler, titreşim ölçümleri ve değerlendirilmesi ile elde edilen verilere bağlı yapılan risk analizi ise Bölüm 4 te verilmiştir. Bölüm 5' te elde edilen sonuçlar tartışılmıştır.
Özet (Çeviri)
With the development of the growing population of the metropolitan cities and resolving transportation and traffic congestion as a result of which one of the foremost challenges facing priority. Highways, bridges, metro networks are seen as a major solution to this problem. The main decisions are the most important structures of the bridges to the transportation of people connecting. A new bridge to provide solutions to transportation and traffic problems of Istanbul and the construction of a highway that connects to the bridge was started on 2013.“3rd BOSPHORUS BRIDGE and North Marmara Motorway Project”is an engineering will provide a solution to the traffic and transport problems on both sides of the Bosphorus, and design project. 3rd Bosphorus Bridge; 59 m over the width of the rail system has received the title of the world's largest suspension bridge. 3rd Bosphorus Bridge; Poyraz connects to the village on the Anatolian side of Istanbul on the European side Garipçe village. The North Marmara Motorway Odayeri-Paşaköy segment connects via 3rd bosphorus brıdge. Also within this highway; Turkey and Europe's largest four-lane tunnel is located River and summerhouse. Examined the louvred excavations carried out during the construction of this thesis project in question, ground shaking explosions that occur during evaluation of residential units located in the surrounding structures and the effects were evaluated. 3rd bosphorus brıdge foot bridge foundations (shafts), will support Anchor Block rope bridge, blasting the River Tunnel and highway excavated soil excavation. 96 pieces made in the process of blasting and vibration measuring devices were obtained from 288 different vibration record. The scale formed depending on the amount of explosives used per lag distance (SD) and vibration study by relating the specific geology of the region of land transfer coefficient (K) and geological coefficient (β) has been reached. In this study, general information about the subject of extensive literature review was conducted to investigate. The importance of drilling and blasting, crushing mechanism with blasting, bench blasting, blasting shaft and environmental problems stemming from the explosion was compiled and presented in Chapter 2. Chapter 3 used materials and methods are described. Information about the region under study, 3rd bosphorus brıdge feet basics, anchor block, portal structure, splitting information about blasting models applied to excavations, and vibration measurement and evaluation based on data obtained by the performed risk analysis Chapter 4 are given. In section 5, the results obtained are discussed.
Benzer Tezler
- İstanbul Kuzey Marmara Otoyolu (3.köprü) kapsamında yapılan mülkiyet edinimleri
Land acquistion of İstanbul Northern Marmara Motorway (İstanbul 3rd Bosporus Bridge)
VOLKAN CEYLAN
Yüksek Lisans
Türkçe
2018
Jeodezi ve FotogrametriYıldız Teknik ÜniversitesiHarita Mühendisliği Ana Bilim Dalı
PROF. DR. HÜLYA DEMİR
- Yeni ulaşım yatırımlarının kentsel saçaklanmadaki rolü İstanbul-Arnavutköy ilçesi örneği
New arrival investments the role of urban sprawl in case İstanbul-Arnavutköy county
HAMDİ DEMİRHAN
Yüksek Lisans
Türkçe
2013
UlaşımBahçeşehir ÜniversitesiKentsel Sistemler ve Ulaştırma Yönetimi Ana Bilim Dalı
YRD. DOÇ. DR. AYFER YAZGAN
- Impacts of mega projects on the resilience of Istanbul city-region
Mega projelerin İstanbul kent-bölgesinin uyum sağlama kapasitesine etkileri
MELİH GÜRÇAY
Doktora
İngilizce
2018
Şehircilik ve Bölge PlanlamaOrta Doğu Teknik ÜniversitesiŞehir ve Bölge Planlama Ana Bilim Dalı
PROF. DR. AYDA ERAYDIN
- İstanbul ili Riva bölgesi zeminlerinin sıvılaşma potansiyeli ve zeminlerin bulanık mantık metodu ile incelenmesi
Liquefaction potential of the Riva region in Istanbul and the analysis of the soil by fuzzy logic method
BURCU AZAKLAR ÇUHA
Yüksek Lisans
Türkçe
2018
İnşaat Mühendisliğiİstanbul Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
PROF. DR. MUSAFFA AYŞEN LAV
- Mega ulaştırma projelerinin İstanbul'a etkilerinin araştırılması
Analizing the effects of mega transportation projects on Istanbul
SACİT BACARAN
Yüksek Lisans
Türkçe
2014
UlaşımYıldız Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. MUSTAFA GÜRSOY