Mecidiyeköy-Mahmutbey metrosu tbm güzergahlarındaki zeminin jeoteknik özellikleri ile yüzey deformasyonlarının ilişkisi
Relation of surface deformation and geotechnical properties of soil on tbm line in Mecidiyekoy-Mahmutbey metro project lines
- Tez No: 462912
- Danışmanlar: PROF. DR. SÜLEYMAN DALĞIÇ
- Tez Türü: Yüksek Lisans
- Konular: Jeoloji Mühendisliği, Geological Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2016
- Dil: Türkçe
- Üniversite: İstanbul Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Jeoloji (Hidrejeoloji) Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 181
Özet
Bu çalışmada, Mecidiyeköy-Mahmutbey Metrosu Yenimahalle-Karadeniz İstasyonları arası güzergahta karşılaşılan zemin ve kaya ortamlarda gerçekleştirilen arazi ölçüm, gözlem ve deneyleri ile laboratuvar verileri kullanılarak güzergahın mühendislik jeolojisi açısından değerlendirilip, yüzey deformasyonlarının irdelenmesi amaçlanmıştır. İncelenen tünel güzergahının mühendislik özelliklerinin belirlenmesi amacı ile derinlikleri 30-38 m. arasında değişen 12 adet araştırma sondajından elde edilen SPT deneyleri, sondajların farklı derinliklerinde uygulanan pressiometre ve basınçlı su testi deneyleri, sondaj manevra boyları için hesaplanan RQD değerleri ile laboratuvar deney sonuçları kullanılmıştır. Araştırma deney ve gözlem amaçlı sondaj loglarından yararlanılarak hattın 1/1000 ölçekli boy kesiti hazırlanmıştır. Tünel güzergahı çift hat olup, toplamda 3122 m. uzunluğundadır ve örtü kalınlığı yaklaşık olarak 15 m ile 22 m arasında değişkenlik göstermektedir. Tünel Açma Makinesi kullanımının gerçekleştirildiği projede bu türden ortamlara uygun olan EPB-TBM tercih edilmiştir. İnceleme güzergahı boyunca 2 adet TBM makinesi Yenimahalle İstasyonu'ndan girerek Karadeniz Mahallesi İstasyonu'nda tünel kazısını tamamlamışlardır. İnceleme yapılan güzergahta Trakya, Güngören ve Çukurçeşme Formasyonlarına ait zemin ve kaya niteliğinde birimlerden geçilmiş olup, yüzeyde yer alan yapılarda meydana gelen deformasyonlar incelenmiştir. Güzergah boyunca kazı ile gelişen deformasyonların gözlemlenebilmesi için tünel dışında (yeryüzünde) ölçüm - izleme ağı kurulmuş ve bunlar kazı ilerlemesine bağlı olarak önceden belirlenmiş zaman aralıklarında ölçülmüştür. Ancak uygulama sırasında, anomali ile karşılaşılması durumunda ölçüm sıklığı belirli noktalarda revize edilmiştir. Tünel kazı seviyesinde Trakya Formasyonu'na ait kaya niteliğindeki birimler RQD değerlerine göre yapılan sınıflamada çok zayıf - zayıf kaya olarak nitelendirilmiştir. Güngören Formasyonu'na ait killerinin SPT sonuçlarına göre üst seviyelerde orta katı-katı, alt seviyelerde sert kıvamda olarak değerlendirilmiştir. Çukurçeşme Formasyonu'na ait kumların SPT sonuçlarına göre üst seviyelerde orta sıkı-sıkı, alt seviyelerde sıkı-çok sıkı olarak değerlendirilmiştir. Tünel kazısının sığ olduğu kesimlerde daha yoğun yerleştirilmiş olan bina ve yüzey izleme ölçümlerine göre deformasyon ve oturma miktarları bazı bölgelerde projede öngörülen sınır değerin üzerinde olduğu görülmüştür. Deformasyonların yoğun olarak gözlendiği Çukurçeşme Formasyonu üzerinde bulunan binalar denetim altına alınmış ve güzergah boyunca gerekli görülen alanlarda enjeksiyon yapılmıştır. Enjeksiyon uygulanan bölgelerde olumlu sonuç alınmış ve mevcut tünel açma yöntemi (TBM) ile devam edilmiştir. Sonuç olarak, metro kazısı sırasında oluşan yüzey deformasyonlarının incelenen güzergahta yer alan Çukurçeşme formasyonunun geçildiği kesimlerde stabilite ve yüzey yapılarının hasarı açısından sorun oluşturduğu ve başlangıçta öngörülen kazı ve destekleme projesine ilave önlem gerektirdiği anlaşılmıştır.
Özet (Çeviri)
In this thesis, it is aimed to evaluate the study area with the principals of engineering geology by using field measurement, observation and tests with laboratory data realized in soil and rock environment of the tunnel route in Mecidiyekoy and Mahmutbey Metro Project between Yenimahalle-Karadeniz Stations line. In order to determine engineering properties of the analyzed tunnel line, 12 investigation boring which have depht from 30 m to 38 m are drilled. By using the investigation boring results, the SPT tests, pressiometer performed to the diffrent depth of boring and hydraulic water pressure tests, RQD values calculated for the length of boring maneuver and laboratory test were performed. In the thesis the results of the test were used. 1/1000 scaled cross-section of the tunnel route was prepared by using the boreholes having the specified goals such observation and test. The tunnel route has double line, 3122 m length and the soil thickness from 15 m to 22 m. At this project which used a Tunnel Boring Machine, EPB – TBM was chosen due to its suitability for this kind of ground conditions. Throughout the project, 2 TBM machines started drilling from Yenimahalle Station and finished the tunnel boring in Karadeniz Station. The investigated route includes Trakya sandstone, Güngören clay and Çukurçeşme sand formations ground and rock sections. Superstructure deformations were investigated on this route. In order to monitor the tunnel induced deformations a series of monitoring systems had been set up the surface. These systems were monitored according to planned frequency, however if any anomaly was observed on measurements in monitoring points, measuring frequency were re-arranged in these points accordingly. In the tunnel excavation level, Trakya Formation's rock section were described very weak/weak rock according to RQD values. Güngören Formation's clay section were evaluated on the upper levels middle stiff-stiff on the ground levels rigid consistency according to SPT results. Çukurçeşme Formation's sand were evaluated on the upper levels middle dense-dense, on the ground levels dense-very dense according to SPT results. According to the results of the measurements of building and surface monitoring points that are placed especially densely because of shallow depth, deformation and settlement values observed over the limit (value) that Deformation and settlement values observed over the limit (value) that predicted on the project. Because of the high deformation values which are occurred some regions, the risky buildings are demolished and the injection is performed to these places. As injection method returns good results in performed region, the tunnel excavation continued with existing method (TBM). In conclusion, inner tunnel or surface deformations which are occurred during the tunnel excavation in the parts of Çukurçeşme Formation are caused problems according to the stability and damage of the surface buildings and understood to take an additional precaution to the excavation and supporting Project which was foreseen at the beginning.
Benzer Tezler
- Mecidiyeköy-Mahmutbey metrosu (İstanbul) tünellerinde farklı jeolojik koşullardaki enjeksiyon çalışmalarının değerlendirilmesi
Evaluation of injection works under different geological conditions in Mecidiyeköy-Mahmutbey metro (Istanbul) tunnels
MEHMET ALİ BERK
Yüksek Lisans
Türkçe
2019
Maden Mühendisliği ve Madencilikİstanbul Üniversitesi-CerrahpaşaMaden Mühendisliği Ana Bilim Dalı
PROF. DR. ALAETTİN KILIÇ
- Kazıklı temel türlerinin inşaat yönetimi açısından incelenmesi
For construction management of piled foundations investigation
EBRU DİNAR
Yüksek Lisans
Türkçe
2019
İnşaat MühendisliğiBeykent Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ BURHAN KUBİLAY KAPTAN
- Patlatma kaynaklı titreşimlerin kayaçların mühendislik özellikleriyle ilişkisinin değerlendirilmesi
Evaluation of the relation between blasting – induced vibrations and engineering properties of rocks
SERCAN IŞIDI
Yüksek Lisans
Türkçe
2017
Jeofizik MühendisliğiOkan ÜniversitesiPatlayıcı Mühendisliği Ana Bilim Dalı
PROF. DR. ALİ KAHRİMAN
- Değişken litolojilerdeki ayrışma/bozulma derecelerinin EBP-TBM'lerin kazı performansı ve maliyetine etkilerinin sayısal analizi ve değerlendirilmesi
Numerical analysis and assessment of the effects of weathering degree in varying lithological conditions on the excavation performance and related costs of EPB TBMs
İRFAN SERKAN BİNEN
Yüksek Lisans
Türkçe
2019
Maden Mühendisliği ve Madencilikİstanbul Üniversitesi-CerrahpaşaMaden Mühendisliği Ana Bilim Dalı
PROF. DR. NURAY TOKGÖZ
- Kabataş-Mecidiyeköy (İstanbul) metro hattı Beşiktaş istasyonu kazısında yeni Avusturya Tünel Açma Yöntemi sınıflamasına yönelik uygulamalar
Application of North Austrian Tunneling Method of Beşiktaş Station, Kabataş-Mecidiyeköy (İstanbul) metro line
DAMLA DEMİR
Yüksek Lisans
Türkçe
2019
Jeoloji MühendisliğiSüleyman Demirel ÜniversitesiJeoloji Mühendisliği Ana Bilim Dalı
PROF. DR. MAHMUT MUTLUTÜRK