Kat karşılığı inşaat sözleşmesinde yüklenicinin işi teslim borcunda temerrüdü ve sonuçları

The consturction agreements in return to flat and the results of the contractor's default

  1. Tez No: 498849
  2. Yazar: YALÇIN ATEŞOĞLU
  3. Danışmanlar: DOÇ. DR. MURAT TOPUZ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Hukuk, Law
  6. Anahtar Kelimeler: Arsa payı karşılığı inşaat işleri, Arsa payı karşılığı inşaat sözleşmesi, Yüklenici temerrüdü, İnşaat sözleşmeleri, Construction work for construction land, Construction contract for land share, Default of the undertaker, Construction contracts
  7. Yıl: 2018
  8. Dil: Türkçe
  9. Üniversite: Bahçeşehir Üniversitesi
  10. Enstitü: Sosyal Bilimler Enstitüsü
  11. Ana Bilim Dalı: Hukuk Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Kat karşılığı inşaat sözleşmeleri Türk Borçlar Kanununda düzenlenmemiş olan, sözleşme özgürlüğü çerçevesinde akdedilen sözleşmelerdir. Doktrinde“arsa sahibinin, arsa paylarının bir bölümünü müteahhide devretme borcu altına girdiği, buna karşılık müteahhidin arsa üzerinde bağımsız bölümlerden oluşan bir yapı inşa etmeyi taahhüt ettiği ve bu bağımsız bölümlerden arsa sahibine ait olanları teslim etmeyi borçlandığı sözleşme”olarak tanımlanmaktadır. Yüklenicinin temerrüde düşmesi halinde“karşılıklı borç yükleyen sözleşmelerde borçlunun temerrüdüne ilişkin genel hükümler”uygulanmaktadır. Temerrüde düşen borçludan aynen ifanın ve gecikme nedeniyle maruz kalınan zararın tazmini istenebilir. Ayrıca TBK m.125 gereğince arsa sahibi,“borcun ifa edilmesinden vazgeçerek müspet zararının”veya“sözleşmeden dönerek menfi zararının”tazmin edilmesini talep edebilir. Arsa sahibi bu haklardan sadece birini kullanabilecektir. Sözleşmesinin ileriye etkili olacak şekilde sona erdirilmesi fesih kavramı ile açıklanmaktadır. Fesih kararından önceki dönem açısından sözleşme geçerlidir, o ana kadar ifa edilen edimler sözleşmeye göre geçerli kabul edilecektir. Sözleşmenin geriye etkili olarak sonlandırılması ise dönme kavramı ile açıklanmaktadır. Yargıtay'a göre, kat karşılığı inşaat sözleşmeleri“geçici-sürekli karmaşığı”sözleşmelerdir. İnşaatın tamamlanan kısmının %90 seviyesinden daha az olması halinde geçmişe etkili dönme, %90 seviyesinin üzerinde olması halinde ileriye etkili fesih hükümlerine başvurulması gereklidir.

Özet (Çeviri)

Construction agreements in return to flat are not specifically arranged in the 6098 numbered Turkish Code of Obligations. For that reason, it is a type of innominate (atypical) contracts. This agreement is also called“flat-for-land building contract,”“construction agreements in return for land share,”“land share provision floor construction contract,”“building contracts in return for land share,”“return for land share agreement.”The parties to the agreement are contractor and landlord. The landlord's obligation is to transfer the land share to the contractor, on the other hand, the contractor has to build the building and deliver the agreed independent parts to the landlord. This type of contracts includes numerous aspects. This thesis focuses on the termination of the agreement due to the contractor's default. If the contractor cannot build and transfer the independent units of the building on time, the landlord will have elective rights. First of them is to request the completion of the building and delivery of the independent units. He can also demand compensation for the delay. Moreover, the landowner can terminate the contract. If the contract is terminated, the landowner can request compensation for the damage. This compensation of the damage is changed according to the situation. The damage is called negative damage and positive damage. By this way, the doctrine and Supreme Court's decisions are examined about the results of the contractor's default.

Benzer Tezler

  1. Manisa yöresinde domateste anlaşmalı tarım ve karşılaşılan sorunlar

    Başlık çevirisi yok

    OSMAN MURAT KOÇTÜRK

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tarım Ekonomisi Ana Bilim Dalı

    Yükleniyor...

  2. Bir pamuk iplikhanesinde fiili çalışma metodlarının incelenmesi ve mevcut işlemlerin standart sürelerinin saptanması

    Başlık çevirisi yok

    MÜRŞİDE KESEROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  3. Ön işlemenin ve askorbik asitin dondurularak depolanan yılan balıklarının (Anguilla anguilla) kalitesine etkileri

    Başlık çevirisi yok

    H.VOLKAN GÖKSEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Su Ürünleri Ana Bilim Dalı

    Yükleniyor...

  4. Bira ve alkol üretiminde kullanılan bazı enzimlerin mikrobiyal yolla eldesi

    Başlık çevirisi yok

    HÜSEYİN ÜSTÜNES

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Gıda Mühendisliği Ana Bilim Dalı

    Yükleniyor...