Geri Dön

Methods of plugging and abandonment of oil and gas wells

Petrol ve gaz kuyularını tıkma ve terketme yöntemleri

  1. Tez No: 559955
  2. Yazar: FATMA KHENISSI
  3. Danışmanlar: PROF. DR. İBRAHİM METİN MIHÇAKAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2019
  8. Dil: İngilizce
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Dünyadaki tüm petrol ve gaz kuyuları giderek ve ergeç kazançsal üretken yaşamlarının sonuna yaklaşırlar ve kısa bir süre sonra da“tıkama ve terk edilme – T ve T”{plug and abandonment - P&A} olarak anılan işleme hazır hale gelirler. Bir tıkama ve terk edilme (T ve T) işleminin nasıl gerçekleştirileceği birçok etmene bağımlı olarak değişkenlik gösterebilir. Örneğin, kuyunun içinde bulunduğu koşullar, koruma borusuı arkasındaki çimentonun durumu, kuyu deliği içine çeşitli kayaç katmanlarıdan olası akışkan girişleri, vs. bu tür etmenler arasında sayılabilir. Bunlara ek olarak, bir T ve T işleminin açık denizde mi, sahilde mi, yoksa karada mı bulunan bir kuyuda yapılmış olduğu da, işlemin sürecini ve yöntemini belirleyen bir etmendir. Farklı ülkelerin hükümetleri T ve T işlemleri ve yöntemleri konusunda farklı yasalara ve yönetmeliklere sahiptirler. Ancak, bu ülkelerde şirketlerin T ve T işlemlerini bu yasa ve yönetmeliklere uygun olarak yapıp tamamlama zorunlulukları bulunmaktadır. Günümüzde T ve T (P&A) işlemlerini gerçekleştirmek için farklı malzemeler, farklı yerşleştirme teknikleri, ve de (açıkdeniz için) tekneler bulunmaktadır. Başarılı bir T ve T (P&A) işleminin tamamlanma süreci, işletmeci şirket için maliyetli bir olgudur. Bu işlemleri daha etkin, başarılı ve dolayısıyla daha az maliyetli kılmak için yeni yöntem arayışı ise, günümüz petrol ve gaz endüstrisinde süregelen bir faaliyettir. Günümüzde T ve T (P&A) işlemine aday ve hazır olan kuyuların pek çoğu, bu işlemin başarılı ve etkin bir biçimde gerçekleştirilmesi düşüncesi ve öngörüsü ile tasarlanmış değillerdir. Bu gerçek ise, kuyuların terk edilmek üzere hazırlanmasında fazladan yeni güçlükler ve zorluklarla karşılaşılmasına yol açmaktadır. Halen kuyu tasarımında en erken aşamada olanlar da dahil omak üzere, yeni geliştirilmiş geleneklere ihtiyaç vardır. Tıkama ve terketme işleminin geliştirilmesi için ne gibi değişimler yapılması gerektiği endüstride tartışılmaktadır. Bu yüksek lisans tezi petrol ve gaz kuyularının“tıkama ve terk edilme – T ve T”işlemlerini tanıtma, irdeleme ve bu işlemlere açıklık getirme amacıyla yazılmış olup, Tunus ve Malezya gibi iki ülkede gerçekleştirilen T ve T (P&A) uygulamalarına ilişkin yönergelere ve bunlar arasındaki farklılıklara da odaklanmaktadır. Bunlara ek olarak, gerçek bir T ve T (P&A) işlem senaryosu sunulmakta ve gelecekte uygulamaya konulabilecek yeni tekniklerin bazıları da tanıtılmaktadır.

Özet (Çeviri)

All oil and gas wells everywhere throughout the world dynamically and in the long run arrive at the finish of their financially profitable life and will before long be prepared for plugging and abandonment (P&A). How this task is performed is reliant on numerous components, for example, the well condition, the concrete status behind packaging, the quantities of potential inflows and so forth. Where the P&A activity is completed is likewise influencing this procedure whether offshore or inland. Various governments work with various guidelines and prerequisites and an operator is by law obliged to ensure the P&A task is done according to guidelines and necessities of the specific zone. Various materials, arrangement procedures, and vessels are accessible for directing the P&A task these days. The way toward finishing an effective P&A is an exorbitant issue for the administrator and the scan for new strategies to make this procedure progressively proficient and along these lines less expensive is a continuous movement in the business today. Today, majority of wells that is prepared for P&A have not been structured in light of this. Such truth brings about going up against additional difficulties to set up the well for abandonment. New conventions, including the ones that are as of now at the most primary phase of well plan, are required, and the industry has been examining what changes can be done to improve this procedure. This thesis has been written to give an insight to the process of plugging and abandonment of a well and the focus is on P&A regulations taking place in two countries Tunisia and Malaysia as well as pointing out the differences between them. a case of study of a real-life P&A operation scenario is presented as well as some of the new procedures that may be utilized later on.

Benzer Tezler

  1. Design and evaluation of wellbore strengthening materials for fractured reservoirs

    Çatlaklı rezervuarlar için kuyu cidarı güçlendirme malzemelerinin tasarımı ve değerlendirilmesi

    UĞUR GARGILI

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    Petrol ve Doğal Gaz MühendisliğiOrta Doğu Teknik Üniversitesi

    Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. İSMAİL DURGUT

  2. Zoysia japonica türü ile Akdeniz bölgesi koşullarında tohum ve vejetatif yöntemlerle çim alan tesisi

    Establishment of Zoysia japonica by seed and vegetative methods in Mediterranean region

    SELİN TEMİZEL

    Yüksek Lisans

    Türkçe

    Türkçe

    2014

    Peyzaj MimarlığıAkdeniz Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    YRD. DOÇ. DR. SONGÜL SEVER MUTLU

  3. Experimental investigation of plugging fractures with calcium carbonate

    Çatlak tıkamanın kalsiyum karbonat ile deneysel olarak incelenmesi

    HAKMYRAT ATAYEV

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    Petrol ve Doğal Gaz Mühendisliğiİstanbul Teknik Üniversitesi

    Petrol ve Doğal Gaz Mühendisliği Ana Bilim Dalı

    DOÇ. DR. GÜRŞAT ALTUN

  4. Effect of production processes of mineral base oils on quality and sludge formation of hydraulic oils

    Mineral bazyaği üretim proseslerinin kaliteye ve hidrolik sistem yağlarinda çamurlaşma oluşumuna etkisi

    GÜLSÜM PULCU

    Yüksek Lisans

    İngilizce

    İngilizce

    2008

    Bilim ve TeknolojiEge Üniversitesi

    Kimya Mühendisliği Bölümü

    PROF. DR. MUSTAFA DEMİRCİOĞLU

  5. Simulation and circuit design of an inverter driver with sensorless field oriented control for a PMSM used in compressor

    PMSM kullanılan kompresör için ve algılayıcısız alan yönlendirmeli kontrol kullanılan evrici sürücünün benzetim ve devre tasarımı

    TOLGA ODABAŞI

    Yüksek Lisans

    İngilizce

    İngilizce

    2022

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Elektrik Mühendisliği Ana Bilim Dalı

    PROF. DR. LALE ERGENE