Çok projeli kaynak kısıtlı yazılım geliştirme projelerinin benzetimle gösterimi ve benzetim eniyilemesi

Simulation of multi-project resource constrained software development projects and simulation optimization

  1. Tez No: 659581
  2. Yazar: FERDA GÜVEN
  3. Danışmanlar: DR. ÖĞR. ÜYESİ BURÇİN ÇAKIR ERDENER
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Yazılım Proje Yönetimi, Benzetim, Simülasyon, Deney Tasarımı, Meta-Model, Simülasyon Optimizasyonu, Benzetim Eniyilemesi, Software Project Management, Simulation, Experimental Design, MetaModel, Simulation Optimization
  7. Yıl: 2021
  8. Dil: Türkçe
  9. Üniversite: Başkent Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Endüstri Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Günümüzde iş hayatı ve sosyal hayat başta olmak üzere neredeyse her alanda kullanılan yazılımların üretilmesi ve bireysel ya da toplu kullanıma uygun hale getirilmesi sürecinde, yazılım projelerinin yönetimi oldukça önemlidir. Müşteri memnuniyetinin ön planda olduğu bu dönemde, yazılım firmalarının kısıtlı kaynakları ile farklı boyuttaki ve zorluktaki projelerin ihtiyaçlarını karşılayabilmek için doğru bir planlama yapmaları gerekmektedir. Planlama yaparken, çalışanların farklı yetenek ve tecrübeye sahip olması ve her projenin gerekliliklerinin farklı olması da dikkate alınması gereken unsurlardandır. Bu çalışmada, yazılım geliştirme projelerinin aşamaları analiz edilerek belirlenen performans ölçütlerini iyileştirecek yetenek tabanlı bir personel planlaması problemi dikkate alınmıştır. Çalışmanın amacı, doğru işgücü planlaması ile tamamlanan proje sayısı, projelerin tamamlama süresi, çalışan maliyeti ve toplam kârlılıkta iyileşme sağlamaktır. Bu çelişen amaçlarda en uygun planlamayı yapabilmek için Benzetim modellemesi tekniğinden faydalanılmıştır. Gerçek bir yazılım firmasından uyarlanmış veriler ile, her projede çalışabilecek personel yetenek ve tecrübe seviyesi kısıtları dikkate alınarak, mevcut durumun modellemesi yapılmış, darboğazlar tespit edilerek alternatif sistem önerilerinde bulunulmuştur. Ayrıca Benzetim Eniyilemesi metodu ile yazılım geliştirme projesinin farklı aşamalarında çalışacak en uygun personel sayısı tespit edilmiştir. Sonuçlar incelendiğinde, Benzetim eniyilemesinin, mevcut sistemi, ele alınan performans ölçütleri açısından iyileştirdiği gözlenmiştir.

Özet (Çeviri)

Today, the management of software projects is crucial in the process of producing software used in almost every field, especially in business life and social life, and making it suitable for individual or collective use. In this period where customer satisfaction is at the forefront, software companies have to make an accurate planning in order to meet the needs of projects of different sizes and difficulties with their limited resources. While planning, the fact that employees have different skills and experience and that the requirements of each project are different are also factors that should be taken into account. In this study, a skill-based personnel planning problem that will improve the performance criteria determined by analyzing the stages of software development projects is taken into account. The aim of the study is to improve the number of completed projects, completion time of projects, employee costs and total profitability with correct workforce planning. Simulation modeling technique has been used to make the most appropriate planning for these conflicting purposes. With data adapted from a real software company, the current situation was modeled, considering the limitations of personnel ability and experience level that can work in each project, bottlenecks were identified and alternative system recommendations were made. In addition, the most suitable number of personnel to work at different stages of the software development project was determined with the simulation optimization method. When the results were examined, it was observed that simulation optimization improved the existing system in terms of the performance criteria considered.

Benzer Tezler

  1. Çimentonun sertleşmesi üzerinde kimyasal komponentlerin etkisi

    Başlık çevirisi yok

    NACİYE TÜRKEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Kimya Ana Bilim Dalı

    Yükleniyor...

  2. Bazı esterlerin kinetik incelenmesi ve termodinamik parametrelerin belirlenmesi

    Kinetic study and detesmination of thermodnamic parameters of some esters

    İBRAHİM TAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Kimya Ana Bilim Dalı

    Yükleniyor...

  3. Atherosklerotik kalp hastalıklarında risk faktörleri

    Risk factors in the coronary artery disease

    MURAT SUHER

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    İç Hastalıkları Ana Bilim Dalı

    Yükleniyor...

  4. Bazı sert çekirdekli meyve türlerinde döllenme biyolojisi üzerinde yöntem çalışmaları

    Başlık çevirisi yok

    ATBİMOĞLU ADALET

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Bahçe Bitkileri Ana Bilim Dalı

    Yükleniyor...

  5. Posterior fossa tümörleri

    Başlık çevirisi yok

    SERHAT AYDINER

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    Gazi Üniversitesi

    Nöroşirürji Ana Bilim Dalı

    Yükleniyor...