Geri Dön

Kamu bilişim yatırım projelerinin seçimi için bir karar destek sistemi

A decision support system for selection of public information technology investment projects

  1. Tez No: 672733
  2. Yazar: MUHAMMED RAŞİT ÖZDAŞ
  3. Danışmanlar: PROF. DR. HADİ GÖKÇEN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve Kontrol, Computer Engineering and Computer Science and Control
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2021
  8. Dil: Türkçe
  9. Üniversite: Gazi Üniversitesi
  10. Enstitü: Bilişim Enstitüsü
  11. Ana Bilim Dalı: Yönetim Bilişim Sistemleri Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 122

Özet

Kamu yatırımları projelendirilmek suretiyle hayata geçirilmektedir. Bilişim alanında hayata geçirilen projeler bir yandan yüksek niteliğe sahip insan kaynağı gerektirirken diğer yandan kullanıcı alışkanlıklarının değişimi, kullanılabilirlik, esneklik, sürdürülebilirlik gibi bazı teknik gereksinimlere sahiptir. Bu nedenle bu sektördeki yatırım projelerinin başarılı bir şekilde hayata geçirilmesi kolay olmamakta, hayata geçirilebilen projelerin ise başlangıçta öngörülen katma değeri sağlayamaması söz konusu olabilmektedir. Bilişim projelerine ayrılabilecek kamu kaynağı kısıtlı olduğundan, en katma değerli ve başarıya ulaşma ihtimali en yüksek projelerin seçimi bir zorunluluk haline gelmektedir. Bahse konu bu seçim çok fazla kritere sahip olduğundan, çok kriterli karar verme yöntemlerinin proje önceliklendirme amacıyla kullanılması gerekmekte, uzmanlara proje seçiminde etkileşimli bilgi sunulması gereksinimi ise karar destek sisteminin varlığını zaruri hale getirmektedir. Literatürde proje önceliklendirmesi yoğun şekilde çalışılmış olan bir konu olmakla birlikte ülkemiz kamu sektöründe sınırlı çalışma yapılabilmiştir. Bu çalışmada, ülkemiz kamu sektöründeki bilişim projelerinin bir karar destek sistemi kullanılmak suretiyle, çok kriterli karar verme yöntemleri yardımıyla önceliklendirmesi yapılmıştır. Uzmanlara sunulan etkileşimli bir arayüz yardımıyla sistem tarafından yapılan önceliklendirmenin kullanıcılar tarafından revize edilebilmesine imkân tanınmış, kullanıcı değişikliklerinin nedenine ilişkin alınan geri bildirimlerin sistemin başarım oranına ilişkin fikir vermesi amaçlanmıştır. Çok kriterli karar verme yöntemlerinden kriterlerin ağırlıklandırılması için Analitik Hiyerarşi Süreci (AHP), projelerin öncelik sırasının belirlenmesi için ise TOPSIS yöntemi kullanılmıştır.

Özet (Çeviri)

Public investments are implemented through projects. In addition to the fact that ICT projects require highly qualified human resources, they also have some technical requirements such as change of user habits, usability, flexibility and sustainability. For this reason, it is not easy to successfully implement investment projects in this sector, and projects that can be implemented may not provide the foreseen added value. Since the public resources that can be allocated to ICT projects are limited, selection of the projects with the highest added value and the highest probability of success becomes a necessity. Since this selection has too many criteria, multi-criteria decision-making methods should be used for project prioritization, and the need to provide interactive information to experts in project selection makes the existence of a decision support system essential. Although project prioritization is a subject that has been studied extensively in the literature, limited work has been done in the public sector of Turkey. In this study, prioritization of ICT projects in the public sector of Turkey has been made by using a decision support system with the help of multi-criteria decision making methods. With the help of an interactive interface offered to experts, the prioritization made by the system was allowed to be revised by the users, and the feedback received regarding the reason for user changes was aimed to give an idea about the performance ratio of the system. Analytical Hierarchy Process (AHP) was used for the weighting of criteria among multi-criteria decision making methods, and TOPSIS method was used to determine the final priority order of the projects.

Benzer Tezler

  1. Ödeme sistemlerinin muhatapları açısından fayda maliyet analizleri ve mastercard Türkiye uygulaması

    Cost benefit analysis of the payment systems as to the addressees and mastercard Turkey applications

    HÜSEYİN ŞEN

    Yüksek Lisans

    Türkçe

    Türkçe

    2018

    İşletmeBeykent Üniversitesi

    İşletme Yönetimi Ana Bilim Dalı

    YRD. DOÇ. DR. DİLAYSU ÇINAR

  2. Türkiye'de raylı sistem sektöründe yapı bilgi modellemesine geçiş süreçleri üzerine bir örnek olay incelemesi ve yönetimsel öneriler

    A case study on building information modelling implementation processes of railway systems sector in Turkey and managerial suggestions

    ELİF ARAÇ

    Yüksek Lisans

    Türkçe

    Türkçe

    2018

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. METİN TEBERLER

  3. Türkiye için yapı bilgi modelleri hazırlık göstergesinin ölçülmesi: Mekansal verilerin rolü

    Measuring building information modelling readiness index for Turkey: The role of spatial information

    CEM KUMOVA

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    Jeodezi ve Fotogrametriİstanbul Teknik Üniversitesi

    Geomatik Mühendisliği Ana Bilim Dalı

    PROF. DR. HANDE DEMİREL

  4. Yapı bilgi modellemesinde bulut bilişimin mimarlık ve inşaat sektörlerindeki etkileri

    The effects of cloud computing in building information modeling on architecture and construction sectors

    VESİLE SÖZEN

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    MimarlıkYıldız Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ TOGAN TONG

  5. İnşaat 4.0 kavramı ve türk inşaat firmalarının yeni teknolojik gelişmelere yaklaşımı üzerine bir inceleme

    Consept of construction 4.0 and analysis on the approach of turkish construction companies to new technological developments

    AYŞEGÜL GÜRKAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. GÜL POLAT TATAR