Bir savunma sanayii firmasında uçak komponenti montaj hattı dengeleme ve işgücü atama problemi için genetik algoritma uygulaması
A genetic algorithm application for aircraft component assembly line balancing and labor assignment problem in a defense industry company
- Tez No: 696676
- Danışmanlar: PROF. DR. TAHİR HANALİOĞLU, DOÇ. DR. BABEK ERDEBİLLİ
- Tez Türü: Yüksek Lisans
- Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
- Anahtar Kelimeler: Matematiksel model, Montaj hattı dengeleme, İşgücü atama, Genetik algoritma, Assembly line balancing, Mathematical model, Labor assignment, Genetic algorithm
- Yıl: 2021
- Dil: Türkçe
- Üniversite: TOBB Ekonomi ve Teknoloji Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 68
Özet
Montaj hattı, belli bir büyüklükteki üretim kapasitesine sahip, nihai veya ara ürünlerin üretilmesi için gerekli operasyonların belirli bir sırayla gerçekleştirildiği iş istasyonlarından oluşan üretim yapısıdır. Montaj Hattı Dengeleme, üretimde gerçekleştirilmesi gereken operasyonlar arası öncelik ilişkisini sağlayacak şekilde, önceden belirlenen diğer kaynak, kapasite, işgücü, yerleşim gibi kısıtları göz önünde bulundurarak operasyonların farklı iş istasyonlarına atanması yaklaşımıdır. Bu çalışmada bir savunma sanayii firmasında tek modelli bir uçak komponenti montaj hattı ele alınmıştır. Operasyon süreleri zaman etüdü çalışmaları ile ölçülmüştür ve uygulama kapsamında deterministik olarak kabul edilmiştir. Yapılan iş etüdü çalışmaları ile ele alınan tek modelli uçak komponenti montaj hattında gerçekleştirilecek operasyonların hangi sıra ile gerçekleştirileceği bilgisi elde edilmiştir.Montaj hatlarının tasarımı ve dengelenmesi başta otomotiv olmak üzere, beyaz eşya ve elektronik sektöründe de üretim verimliliği açısından oldukça önemlidir. Uçak komponenti montaj hattı, diğer sektörlerdeki montaj hatlarından farklı olarak daha fazla emek yoğunluklu çalışmaktadır. İşgücü atamasının verimliliği arttıracak şekilde yapılması kritik öneme sahiptir. Her bir operasyon için farklı araç/gereçlerei, takımlara ihtiyaç duyulmaktadır. Bu kısıt ile birlikte her montaj operasyonunun her montaj istasyonunda gerçekleştirilemeyeceği bilinmektedir. Çalışmada konu alınan tek modelli uçak komponenti montaj hattında, montaj hattı dengeleme ve işgücü atama problemi için yapılan uygulamada her bir operasyon ve her bir operasyonun gerçekleştirilebileceği potansiyel montaj istasyonları kısıt olarak yansıtılmıştır. Firmanın ele alınan uçak komponenti montaj hattı için ayıracağı işgücü ve bütçe önceden belirlenmiş olup kısıt olarak uygulamaya yansıtılmıştır. Operasyon sürelerinin operasyonu gerçekleştiren operatörün beceri seviyesiyle ilişkili olarak farklılık göstermesi dikkate alındığında problem için bütçe kısıtlı montaj hattı çevrim süresi minimizasyonu amaçlayan bir matematiksel model geliştirilmiştir. Belirlenen kısıtlar ve varsayımlar göz önünde bulundurularak, görevler arası öncelik ilişkisi sağlanacak şekilde, çevrim süresi minimizasyonu hedefleyen matematiksel modelin doğruluğu küçük boyutlardaki problem verileriyle GAMS programında modellenerek test edilmiş ve en iyi çözüm elde edilmiştir. Büyük boyuttaki gerçek hayat verileri, Python 3.7.6 programı aracılığıyla geliştirilen genetik algoritma ile uygun çözüme ulaşılmıştır. Böylelikle minimum çevrim süresi hedeflenen uçak komponenti montaj hattında, hangi istasyonda hangi operasyonunun çalışılacağı ve hangi operasyonda hangi operatörün çalışacağı belirlenmiştir.
Özet (Çeviri)
The assembly line which known as a production structure composing of workstations with a certain production capacity, where the operations required for the production of final or intermediate products are carried out in a certain order. Assembly Line Balancing is the approach of operation assignment to different workstations, taking into account other predetermined constraints such as resource, capacity, workforce, and placement, in a way to ensure the priority relationship between operations that should be performed in production. In this study, a single model aircraft component assembly line in a defense industry company is discussed. Operation times were measured by time study studies and were considered deterministic within the scope of the application. In this study, the precedence relationship between the operastions are determined with using work study techniques. Line balancing is very important in terms of production efficiency, especially in the automotive, white goods and electronics sectors. Unlike assembly lines in other industries, the aircraft component assembly line is more labor intensive. It is critical to assign workforce in a way that increases productivity. Different tools / equipments are required for each operation. With this constraint, it is known that not every assembly operation can be performed at every assembly station. In the single-model aircraft component assembly line, which is the subject of the study, each operation and the potential assembly stations where each operation can be carried out is shown as a constraint in this problem type. The manpower and budget to be allocated by the company for the aircraft component assembly line are determined in advance and have been reflected in the application as a constraint. Considering that the operation times vary depending on the different skill levels of the each operator performing the operation, a new mathematical model has been formulated for budget constrained assembly line cycle time minimization for the problem of assembly line balancing and manpower assignment. Considering the determined constraints and assumptions, this mathematical model aiming at cycle time minimization was resolved in the GAMS program by modeling it with small-sized problem data, and the best solution was obtained, so as to provide priority relationship between tasks. Real life problem data with big-sized were modeled in Python 3.7.6 program with genetic algorithm to reached the feasible solution. In this way, it was determined which operation will be worked in which station and which operator will work in which operation in the aircraft component assembly line, for which the minimum cycle time is aimed.
Benzer Tezler
- Tarihi gelişim içerisinde Türk hava harp sanayi
Historical evolution of Turkish air war industry
CEVAT SARIKAYA
Yüksek Lisans
Türkçe
2015
Kamu YönetimiGebze Teknik ÜniversitesiStrateji Bilimi Ana Bilim Dalı
YRD. DOÇ. DR. KURTULUŞ DEMİRKOL
- Bir savunma sanayii firmasında tedarikçi seçimi çalışması
Supplier selection study in a defence industry
KÜBRA NUR DEMİR
Yüksek Lisans
Türkçe
2018
Endüstri ve Endüstri MühendisliğiTOBB Ekonomi ve Teknoloji ÜniversitesiEndüstri Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ SALİH TEKİN
DOÇ. DR. YUSUF TANSEL İÇ
- İçsel pazarlama uygulamalarının çalışanların iş tatminine etkisinde örgütsel adaletin aracılık rolü: Bir savunma sanayi firmasında uygulama
The effect of internal marketing applications on the work scale of employees and the role of organizational justice
ARİFE ŞEYDA SAF
Yüksek Lisans
Türkçe
2024
İşletmeAnkara Hacı Bayram Veli Üniversitesiİşletme Ana Bilim Dalı
DOÇ. DR. SELMA KALYONCUOĞLU BABA
- Decision support model for subcontractor selection in defense industry projects with analytic hierarchy process and integer linear programming
Analitik hiyerarşi süreci ve tam sayılı doğrusal programlama ile savunma sanayii projelerinde alt yüklenici seçimine yönelik karar destek modeli
ANIL ŞEHİTOĞLU
Yüksek Lisans
İngilizce
2019
Endüstri ve Endüstri MühendisliğiHacettepe ÜniversitesiEndüstri Mühendisliği Ana Bilim Dalı
DOÇ. DR. OUMOUT CHOUSEINOGLOU
- Pandemi döneminde stok yönetimi ve eş zamanlı topla dağıt araç rotalama problemi ile karlılığın artırılması: Bir savunma sanayii firmasında uygulama
Increasing profitability with inventory management and vehicle routing problem with simultaneous pickup and delivery during the pandemic period: Application in a defense industry company
TUFAN CAN DEMİREL
Yüksek Lisans
Türkçe
2024
İşletmeHacettepe Üniversitesiİşletme Ana Bilim Dalı
DR. ÖĞR. ÜYESİ BÜLENT ÇEKİÇ