Geri Dön

Identifying delay factors for the construction industry of Iraq using structural equation modeling

Yapısal denklem modellemeyle Irak inşaat sektörü için gecikme faktörlerinin belirlenmesi

  1. Tez No: 719257
  2. Yazar: SALWAN MAJEED IBRAHIM CHENANA
  3. Danışmanlar: DR. ÖĞR. ÜYESİ GÖKHAN KAZAR
  4. Tez Türü: Yüksek Lisans
  5. Konular: Mühendislik Bilimleri, Engineering Sciences
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2021
  8. Dil: İngilizce
  9. Üniversite: İstanbul Gedik Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: Mühendislik Yönetimi Ana Bilim Dalı
  12. Bilim Dalı: Mühendislik Yönetimi Bilim Dalı
  13. Sayfa Sayısı: 97

Özet

İnşaat sektörü, tüm dünya ülkelerinin ekonomilerini desteklemede ve geliştirmede hayati bir rol oynamaktadır. Ülke ekonomisinin en önemli besleyicilerinden sayar. İnşaat projesi için başarılı yönetimin nitelik ve özelliklerinden biri, projeyi belirlenen tarihte ve taahhüt edilen bütçe ile yüksek kalitede teslim etmektir. Dolayısıyla bu araştırma, Irak'ta inşaat projelerinde gecikmeye neden olan temel faktörleri ortaya çıkarmayı amaçlamaktadır. Ayrıca, bu çalışma, projelere başlamadan önce ve inşaat aşamasında zaman aşımı büyüklüğünü önleyerek veya azaltarak gecikme nedenlerini yönetmeyi ve çözmeyi amaçlayan iki çözüm grubu önerdi. Diğer yazarlar tarafından yürütülen literatür incelemelerinden yararlanılan bu çalışma, Irak ve diğer ülkelerdeki inşaat projelerinde zaman aşımına neden olan ana nedenlerin tanımlanmasına katkıda bulunmuştur. Bulgu, inşaat projelerini etkileyen ana gecikme faktörleri olarak kabul edilen 14 gecikme faktörü idi. Ayrıca, anket yoluyla) Irak inşaat projelerindeki kilit taraflara (müşteri, müteahhit, danışman ve diğerleri) gönderilen anket, 14 gecikme faktörünü sıklıklarına ve ciddiyetine göre sıraladı. Cevaplar inşaat projelerinde profesyonel olan 140 uzmandan toplanmıştır. Yapısal modelleme (SEM), farklı gecikme nedenlerinin inşaat projeleri üzerindeki etkisini tanımlamak ve ölçmek için katılımcılardan toplanan verileri analiz etmek için geliştirilmiştir. Bu nedenle bu çalışma, Irak'taki inşaat projelerinde gecikmeye neden olan başlıca faktörler için özel bir bilgi sunmaktadır. Ayrıca, bu keşif araştırması, inşaat projeleri için gecikmeden teslimatı iyileştirmeyi amaçlayan iki tür çözüm önerdi.i üzere çok çeşitli kaynaklardan kaynaklanabilir. Son olarak, çalışma, kaynak planlamasının proje başarısı üzerinde yüksek performansa sahip olduğunu, diğer iki hedefin ise Somali Hargeisa'daki özel inşaat şirketlerinin proje başarısı üzerinde düşük performansa sahip olduğunu önermektedir.

Özet (Çeviri)

The construction industry plays a vital role in supporting and developing the economics of countries all over the world. It deems one of the most important feeders of the national economy of the country One of the features of fruitful administration for the development project is conveying the venture inside the particular date just as the responsibility with a dispensed spending plan with a superior grade. Therefore, this study focuses on determining the main factors that cause a delay in construction projects in Iraq. Furthermore, this study suggested two groups of remedies aim to manage and resolve delay caused either by preventing or reducing time overrun magnitude before commencing projects and during the construction stage. This study utilized from literature reviews conducted by other authors contributed to defining the main causes that lead to time overrun in construction projects in Iraq and other countries. The finding was 14 factors of delay considered the main delay factors that affected construction projects. Also, by conducting a questionnaire survey sent to the key parties in Iraqi construction projects (client, contractor, consultant, and others) for ranking the 14 delay factors according to their frequency of occurrence and severity. The Answers were collected from 140 experts who are professionals in construction projects. Structural equation modeling (SEM) has been developed to analyze the data collected from the respondents to depict and quantify the influence of different causes of delay on construction projects. Structural equation modeling (SEM) has been developed to analyze the data collected from the respondents to depict and quantify the influence of different causes of delay on construction projects. Thus this research gives particular data to the central point that lead to postponement in development projects in Iraq. Moreover, this exploratory examination recommended two sorts of cures plans to further develop conveyance for development projects at a time.

Benzer Tezler

  1. An investigation into delay factors in building construction projects; case of Hargeisa, Somaliland

    Bina inşaat projelerinde gecikme faktörlerinin araştırılması; Hargeisa, Somaliland örneği

    AHMED ABDI MOHAMOUD

    Yüksek Lisans

    İngilizce

    İngilizce

    2022

    İnşaat MühendisliğiKaradeniz Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. VEDAT TOĞAN

  2. İnşaat projelerinde gecikmeye neden olan faktörler: Bir sentezleme çalışması

    The causes of delay in construction projects: An synthesis study

    ÖZGE UÇMAZBAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    2016

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    PROF. DR. FATMA HEYECAN GİRİTLİ

  3. Developing resilient construction project professionals:examining architecture students' personality perspective

    Dayanıklı yapım projesi profesyonellerinin geliştirilmesi:mimarlık öğrencilerinin kişilik bakış açısının incelenmesi

    ALİME ŞANLI

    Yüksek Lisans

    İngilizce

    İngilizce

    2021

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. FATMA PINAR ÇAKMAK

  4. Türk inşaat sektöründeki hastane projelerinin yapım sürecindeki gecikmeye neden olan faktörlerin incelenmesi ve değerlendirilmesi

    Review and evaluation of the factors causing delay in the construction process of hospital projects in the Turkish construction industry

    BURAK UĞUR YILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    2024

    Mimarlıkİstanbul Medipol Üniversitesi

    Mimarlık Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ GİZEM CAN

  5. İnşaat projelerinde gecikme kaynaklı risk faktörlerinin analizi

    Analysis of delay-related risk factors in construction projects

    HALİL BURAK YILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    2024

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ATİLLA DAMCI